Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March.

Slides:



Advertisements
Similar presentations
1 John Rwangombwa Permanent Secretary and Secretary to Treasury Ministry of Finance and Economic Planning Republic of Rwanda 1 Challenges and opportunities.
Advertisements

KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
Session 9b: Next steps on financial management harmonization and alignment.
Guidance Note on Joint Programming
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 6: Transparency and Fair and Equitable Procedures Mr. Jean-Jacques Raoul.
Use of Country Systems Consultations on the Draft Methodology for Use of Country Procurement Systems.
World Bank Financial Management Sector September 2010.
Group 3 Financing EFA: Domestic resource mobilization and external support Facilitator: Robert Prouty, The World Bank.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
PROCUREMENT IN WORLD BANK INVESTMENT OPERATIONS: STATUS OF THE REFORM March, 2014 Operations Policy and Country Services.
Poverty Reduction Strategy Papers (PRSPs) Overview and Next Steps Expert Group Meeting on MDGs and PRSPs Egypt, December 2004.
AN INTRODUCTION Country Systems. Outline 1. What are Country Systems? 2. What does it mean to use country systems? 3. Why does the ‘use of country systems’
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
Piloting the Use of Country Systems in World Bank-supported operations Working for a world free of poverty.
Title Consultation on the 7 th replenishment of IFAD’s resources IFAD’s operating model : overall structure and components Consultation on the 7th replenishment.
OPCPR- 03/26/20081 Procurement Under OP/BP 8.0 This presentation will cover…  Organizational and Institutional Support  Simplified Procurement Arrangements.
FIDIC MDB Conference Brussels June 2012 © European Bank for Reconstruction and Development 2010 | EBRD Procurement considerations when financing.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
Political Economy in Project Design Presentation for “Political Economy of Governance Reform” MC2-800 on April 18, AM Amit Mukherjee (ECSPE)
PROCUREMENT IN PRSCs – Case of Uganda March 24-28, 2008 Playing a Key Role in achieving the Development Results Playing a Key Role in achieving the Development.
The Strengthened Approach to Supporting PFM reforms Applying the PFM Performance Measurement Framework Washington, D.C., January 17-18, 2007 Bill Dorotinsky.
A short introduction to the Strengthened Approach to supporting PFM reforms.
Embracing the Paris Principles and AAA to Curb Corruption and Enhance Development Performance Mitchell O’Brien Governance Specialist Team Lead – Parliament.
TRAINING PROGRAM PROCUREMENT GUIDELINES IMPORTANT ASPECTS 1.
1 Use of Country Procurement System (UCS) HIGH LEVEL PROCUREMENT FORUM V. S. (Krish) Krishnakumar Regional Procurement Manager Africa Region - The World.
Joint Assistance Strategy for Tanzania (JAST) Poverty Policy Week Creative and Hard Work, the Key to Fighting Poverty Presentation by the Ministry of Finance.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
Central Asia Public Procurement Forum Issyk Kul, Kyrgyz, 21 – 24 April 2009 ADB’s SUPPORT FOR PROCUREMENT CAPACITY DEVELOPMENT Dan Yang Director, Central.
Africa Region AIDS Consultation 1 Adoption of Sector Wide Approach (SWAp) in HIV/AIDS Projects.. a procurement perspective by Mbuba Mbungu World Bank.
UPDATE ON GAVI ALLIANCE, THE GLOBAL FUND AND WORLD BANK COLLABORATIVE EFFORT FOR MORE EFFECTIVE HSS SEPTEMBER, 2009 Exploring a potential common platform.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
2008 Fiduciary Week Procurement Post-Reviews How to increase impact Irina Luca AFTPC (March 26, 2008)
AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty.
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Institution / Sector Fiduciary Assessments (IFAs/SFAs) An example – the Croatia Education Sector Fiduciary Assessment (ESFA) Maria Vannari & Ranjan Ganguli,
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
1 Country Systems Chilean Experience 1300 New York Avenue, Washington, DC Phone (202) Fax (202) Inter- American Development Bank.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
1 The new financial modalities LAF seminar June 2009.
ROUND TABLE “Exchanging Experience in Absorption of the European Funds: Perspectives for Bulgaria and Poland” 1 April 2011, Sofia Tomislav Donchev Minister.
MOH 2 February Identify needs Prioritize needs Finalize list of endorsed needs Submit needs to MOPAD Consult with donor Negotiation (intra- and.
Subrecipient Monitoring
Presentation Outline The Present Procurement Policy
Corruption Warning Signs Is your Project at Risk?
Presented by Jean Fecteau OEO Fiscal Analyst
2nd Global Procurement Conference | 4-5 July 2017
Structural Funds Programming Predeal, Romania
Procurement Management
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
Options for Sector Wide Approaches (SWAps)
SWAPs: Based on Lessons Mainly from Morocco and Zambia
Public Private Partnerships
April 2011.
PROCUREMENT POLICIES AND GUIDELINES
UN – WB Fiduciary Principles Accord
The Strengthened Approach to Supporting PFM reforms
National Disaster Risk Management Fund
Presentation transcript:

Procurement in SWAps Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March 3, 2006, Zagreb, Croatia.

OUTLINE I.Policy II.Experience and Lessons Learned III.Issues and Challenges

‘Sector-wide Approach’ Concept “ A way of engaging in development cooperation based on the principles of coordinated support for a locally owned program of development ” OECD/DAC (2005) Footnote 1: SWAp  Lending instrument; Pooled financing; Full use of country systems; a Bank-financed project/loan Footnote 2: Other terminology: sector approach; sector support; sector program (SP); sector investment program (SIP); program-based approach (PBA)

Key Elements of SWAps Intent & Directions, Not ‘Prerequisites’ Government Ownership & Leadership Partnerships with Development Partners Agreed Sector Policy Framework/Strategies based on Shared Vision & Priorities Common Sector Program/Expenditure Framework Coordination/alignment of (all) resources Harmonized Implementation Mechanisms & Use of Local Systems/Procedures Gradual and phased process Each element evolves & matures over time

Policy – The WB Board of Directors has not yet approved the use of the country systems in procurement. Implication  all contracts under ICB and consulting contracts subject to international competition shall follow WB Guidelines

Fiduciary Capacity Assessment – a building block of SWAp Upfront assessment of fiduciary systems Early identification of risks related to country procurement process/country proc. capacity, including oversight Assessment tailored to sector and SWAp design and go beyond procurement to issues related to sector management and sector capacity If systems are not acceptable, agree on risk mitigation measures and capacity development plan instead of creating parallel systems

SWAp fits into existing structure SWAp respects Government ownership and decentralized approach Funds are pooled to support the program Common reporting format for procurement, expenditure, audited accounts, progress reports Common procurement and procurement review procedures Joint Review missions

Procurement Arrangements Design arrangements based on Fiduciary Capacity Assessment Align them with SWAp design and flow of funds Setting Thresholds for ICB and Selection of International Consultants Separate arrangements for pooled and non-pooled funds Common procurement procedures acceptable to all financiers shall apply to all contracts financed from the pool. Such procedures are detailed in Program Operational Manual

Pooling Arrangement

(1) Procurement Methods ICB to follow the Bank procurement guidelines Increased or full use of national procedures for NCB/local consultants when good national procurement systems/capacity exist Use of harmonized procurement documents (standard or model bidding docs) for national procedures for NCB

Procurement Methods (cont’d) In Romania, Bulgaria, Croatia, the following conditions apply to the NCB which is done under national procedures: Minimum advertisement period in the official gazette – 30 days and public bid opening Use of standard bidding documents acceptable to the Bank using explicit monetary quantifiable bid evaluation criteria without use of a point system of evaluation Contract award is made to the qualified bidder offering the lowest evaluated bid price without application of any preference Participation of Government-owned Enterprises only if determined eligible according to Bank Procurement Guidelines Publication of contract awards information required

Selection of Consultants (International TA) Romania, Croatia and Bulgaria have a choice of one of the two options: 1. Use of the Bank guidelines for Selection of Consultants (May 2004); 2. Use of procedures agreed between the Bank and the EC (methods compatible both to the Bank Guidelines and EU Directives)

Selection of Consultants (Local TA – firms and individuals) May be possible if the national public procurement law regulates intellectual services differently from procurement of goods and works

(2) Procurement Plan Always advisable Not always possible As a minimum an agreed list of Goods, Works and Services are spelled out in the Program Operational Manual containing procurement procedures if activities to be financed are identified: annual plan updated on a rolling basis covering all contracts in the Program financed with pooled and non-pooled funds should be prepared

(3) Procurement review Determine appropriate review arrangements based on capacity and risk assessment of implementing agency, extent of use of country systems, size, nature and methods of procurement, pooling arrangements and financiers requirements Post review for procurement mainly relying on country systems (below ICB thresholds) Prior review ICBs/QCBS and other large contracts that are subject to procedures under Bank Guidelines Independent procurement audits may also be advisable Government and all financiers should agree on common monitoring, reporting and procurement review requirements and sharing of information under audits and other technical reports. Avoid duplication and maintenance of parallel systems unless unavoidable Appropriate record keeping procedures should be in place

Procurement Arrangements: Issues Eligibility-Rules under Bank Procurement Guidelines will apply Remedies i) in case of Bank declaring misprocurement in any contract funded by the whole pool of funds Bank would have option to cancel from its loan an amount equivalent to the contract amount multiplied by Bank ’ s percentage participation in the pool of funds. If misprocurement of a Bank financed contract occurred outside of the pool the amount canceled would be equivalent to the contract amount multiplied by the percentage of the contract financed by the the loan and not necessarily the full contract value) ii) Bank remedies under the loan agreement and Bank Procurement Guidelines will be applied at all times if any fraud or corruption occurred under the project and will not be waived Evaluation system (merit point system should not be used)

Lessons Learned SWAps NOT a ‘ one-size-fits-all ’ Custom-made design & process Need to evolve and grow w/ some ‘ growing pains ’ -if weaknesses exist then provide approaches to strengthen systems over implementation period with transitional procurement arrangements Issues (especially on eligibility and applicable procurement procedures) shall be identified and dealt with at preparation stage Adapt flexible approach using full range of possible solutions Procurement may be a challenge but solutions exist and should be pursued

Lessons Learned Be careful not to “ ring fence ” a Program instead of ring fencing a Project

ECA experience  Poland (design and initial experience with implementation)  Croatia, Kyrgyz (design only, no implementation experience yet)