AEM, Sept 8 20081 Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept 8 2008.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
LHCC 3rd June 2015 Mike Lamont for the LHC team
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Paolo Rumerio, University of Maryland On Behalf of the CMS Collaboration The LHC and Dark Matter Ann Arbor, Michigan, January 6 th -9 th, 2009 Status of.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Stefano Redaelli Beam Department - Operations Group Operational Aspects of the Phase II Crab Cavity System LHC-CC09 3 rd LHC Crab Cavity Workshop European.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
LHC progress Report LHCC Wednesday 23 rd March 2011.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
First CMS Results with LHC Beam
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
1 LHC and CMS Status Robert M. Harris Fermilab Fermilab All Experimenters Meeting Nov. 10, 2008.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
LHC Commissioning with Beam
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
CMS Tracker Operational Experience
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Summary of Week 11: 14 – 21 March
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
LHC Beam Operations Past, Present and Future
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Another Immortal Fill….
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Saturday 26 November 2011.
Presentation transcript:

AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept

AEM, Sept Frank Chlebana (Fermilab) Status of LHC First circulating beam test scheduled for Sept 10! The LHC was fully cold by mid August We have had two several successful injection tests

AEM, Sept Frank Chlebana (Fermilab) First LHC Injection Test First Beam Induced Quench! (main dipole in Q8/Q7 region) Beam at injection region Aug 9/10

AEM, Sept Frank Chlebana (Fermilab) Second LHC Injection Tests Successfully tested:  Access system  Aperture and Optics  Instrumentation  Magnet model  Controls/Database  Beam Transfer Aug 23/24 “Remarkable performance from a huge number of systems”

AEM, Sept Frank Chlebana (Fermilab) Getting Ready for Collisions During the weekend Beam1 through point 4 up to 150m of point5 (CMS) Beam splash observed in CMS! Inject Beam2 to IP6 abort dump – use magnet sweep, try kickers Evening-nights of Sep 8, 9 th Repeat injection of Beam2 to IP6 and Beam1 to IP3 collimators Maybe go further (Beam1 to IP6 and Beam2 to IP3) Sept 10 th Inject Beam2, circulate and dump. Inject Beam1, circulate and dump. See the bunches. Time CMS to bunch. 1 bunch per beam, 2-5x10 9 per bunch, 43-sec cycle RF not ready – circulating beam will be uncaptured

AEM, Sept Frank Chlebana (Fermilab) LHC Injection Tests Injection Test 1 Injection Test 2 Injection Test 3++ Beam stopped on collimators 150m upstream of CMS

AEM, Sept Frank Chlebana (Fermilab) Beam Splash Events in CMS

AEM, Sept Frank Chlebana (Fermilab) Beam Splash Events in CMS

AEM, Sept Frank Chlebana (Fermilab) Getting Ready for Collisions Sept week Inject and dump studies: aperture scans, RF capture, abort timing and alignment, multi-bunch injection, tune  lifetime ~hr Bunch intensity ≥ 5x10 9 Sept 20 +/- days (guessing…) A few fills of 450 GeV collisions of a few hours each ~4 bunches per beam, bunch intensity < few Unsqueezed, no crossing angle, and collimators open Shutdown for a few days to complete hardware commissioning before ramping

AEM, Sept Frank Chlebana (Fermilab) Cosmic Ray Runs at 0T Total of ~57M events collected in 101 “good runs” Good participation from all major components CRUZET4: Events/Subsystem CMS high rate tests triggered at 100kHz, sustained 66kHz with backpressure from DAQ Readout Units running at 238 MB/s (Design 240 MB/s)

AEM, Sept Frank Chlebana (Fermilab)CRUZET4CRUZET4 All of the tracker included in the readout Operational fraction TIB +TID98.6% TOB 99.5% TEC+99.5% TEC-99.6% BPIX99.2% FPIX lost 135/4320 (3%) ROC due to a wire bond failure during transport/installation Remaining channels99.9% Pixels TIB TOB Tracker cooling plants are operational and stable at current temperatures Coolant leaks localized to connections at the cooling plants have been sealed

AEM, Sept Frank Chlebana (Fermilab) CMS Solenoid Tests Short run at 3T

AEM, Sept Frank Chlebana (Fermilab) CMS Getting Ready for Collisions Both HFs closed, rotating shields closed CMS ready for beam Magnet ramp up to 3.8T started Monday morning ~3T observed mechanical problem → ramp down 3.8T test postponed until after first beam Pumpdown going well Opened CMS vacuum to LHC Closed while investigating Magnet issue

AEM, Sept Frank Chlebana (Fermilab) Data Quality Monitoring Remote Operations Center is an integral part of CMS operations Participating in online and offline DQM shifts Providing feedback to help develop shift instructions and monitoring tools DQM Shifter GUI

AEM, Sept Frank Chlebana (Fermilab) Determining Data Quality in a LS Filled in POG Monitor Fit by DC Algorithm Fill a 2d histogram Take projection and fit to get mean and chi2 Luminosity Section

AEM, Sept Frank Chlebana (Fermilab)SummarySummary A lot of progress made since the last AEM report Starting to look like a real experiment LHC appears to be working well! All CMS subdetectors are working well! A great deal of excitement and optimism No major show stoppers… Hopefully next time you will see collision data…