21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G070343-00-Z.

Slides:



Advertisements
Similar presentations
The installation of the new VIRGO Injection Bench
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Installation of the new end mirror 1Frans Mul - July 2008.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
ILIAS WG1 meeting, 19/06/07 IB Faraday Isolator 1 IB in vacuum Faraday isolator E. Genin, S. Hebri, S. Hamdani, P. La Penna, J. Marque EGO.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Paolo La Penna The New Virgo Injection BenchN5-WP1 4 TH MEETING, Hannover, 7/04/2005 The New VIRGO Injection Bench Paolo La Penna European Gravitational.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
“Detector activities” after the IB upgrade Michele Punturo.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Camera Motion System Requirement Design Details FEA.
1 Advanced Virgo Monolithic Payloads P.Rapagnani Thermal Noise Workshop 2012_02_24-25.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
First clues on ET payload sensing and control
LCGT Seismic Attenuation System LCGT-SAS
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
The Superattenuator upgrades and the SAFE Project
MSC report September weekly meeting EM-MSC
Initial BIS installation
Virgo – Injection SYStem
Advanced Virgo – Nikhef tasks
Frequency Noise in Virgo
Virgo Update – LSC meeting
Heavy IMC end payload requirements
La réduction du bruit quantique
Status at the Prague meeting
Presentation transcript:

21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G Z

21/5/2007Thomas S. Bauer - Nikhef2 IMC Reminder: New end mirror ordered (14 cm vs.. 8 cm); needs new Payload -- Roma 1 ; and new installation tooling -- Nikhef ; In addition: losses in IMC close to 50 %, needs action at level of input bench: DiHedron. Since beg. 2007, Nikhef responsible for IMC.

21/5/2007Thomas S. Bauer - Nikhef3 IMC End Mirror End mirror Payload: already started by Roma -1 Installation tooling: at present designed by Frans Mul (Nikhef). next few slides are by Frans.

21/5/2007Thomas S. Bauer - Nikhef4 VIRGO MODE CLEANER END-MIRROR INSTALLATION First step, mirror on support C O N C E P T

21/5/2007Thomas S. Bauer - Nikhef5 Vacuum clamping Mirror support Mirror Recoil mass Recoil support VIRGO MODE CLEANER END-MIRROR INSTALLATION Gear box Lifting device Installation frame Vacuum pump 2 mbar vacuum 4.8 l/min DC 12 V 2 Amp

21/5/2007Thomas S. Bauer - Nikhef6 VIRGO MODE CLEANER END-MIRROR INSTALLATION Front view Rear view Translation Side view Translation Rotation Tilt & keep Movements

21/5/2007Thomas S. Bauer - Nikhef7 CENTRE OF GRAVITY Total weight 71 kg VIRGO MODE CLEANER END-MIRROR INSTALLATION

21/5/2007Thomas S. Bauer - Nikhef8 CENTRE OF GRAVITY Total weight 71 kg VIRGO MODE CLEANER END-MIRROR INSTALLATION VARTA Deep Cycle battery 12V/ 44Ah hxbxd: 225 x 176 x kg € 192

21/5/2007Thomas S. Bauer - Nikhef9 VIRGO MODE CLEANER END-MIRROR INSTALLATION

21/5/2007Thomas S. Bauer - Nikhef10 VIRGO MODE CLEANER END-MIRROR INSTALLATION

21/5/2007Thomas S. Bauer - Nikhef11 VIRGO MODE CLEANER END-MIRROR INSTALLATION THE END 114kg

21/5/2007Thomas S. Bauer - Nikhef12 Timescale Mirror RM design production Marionetta design production Frame design production Tests and optim. Installation M J J A S O N D J F M

21/5/2007Thomas S. Bauer - Nikhef13 Timescale ITF Shutdown Old Mirror dismount Marionetta dismount machining re-mounting SA pre-tuning New MC installation SA post-tuning Total Tower closed: Few days 1 -2 days 1 week ? more ? 1-2 days 1 week Few days 2 weeks min 5 … 6 weeks end April 08

21/5/2007Thomas S. Bauer - Nikhef14 End mirror Action : Finalize tooling design: few measures need to be fixed, no work ; Approve and produce it. Decide about Marionetta: Options: - modifying the existing one, will take precious time when tower is open; - produce a new one (can be done at Nikhef) will save time (and surprises)

21/5/2007Thomas S. Bauer - Nikhef15 DiHedron… Problems: a)Present DiHedron "jumps"; b)IMC transmission about ~ % -due to too small aperture? -or rather to poor quality *) mirrors? *) - could be "dirty"

21/5/2007Thomas S. Bauer - Nikhef16 Present DiHedron Injection Bench

21/5/2007Thomas S. Bauer - Nikhef17 Present DiHedron

21/5/2007Thomas S. Bauer - Nikhef18 Options DiHedron Clamp existing DiH on Bench, or suspend it: solves only jumping, not losses Clean mirrors: not easy - chance for success… ? Replace DiH by 2 suspended mirrors (GEO600) quite involved, crowded IB, commissioning? new DiH with larger apertures: solves only part of problems Other ???

21/5/2007Thomas S. Bauer - Nikhef19 Present DiHedron Mirror Beam Channel for alignment

21/5/2007Thomas S. Bauer - Nikhef20 inverted DiHedron (?) Mirror Beam

21/5/2007Thomas S. Bauer - Nikhef21 FEA inverted DiHedron L = 55 D = 54 S =20 R1 =10 R2 =17.5 R3 =40 T =30 H1 =90 H2 =70 H3 = 5 L H1H1 H2H2

21/5/2007Thomas S. Bauer - Nikhef22 Oscillation in X-Y plane Oscillation in X-Z plane 3D-Torsional mode 4250 Hz 7500 Hz4600 Hz

21/5/2007Thomas S. Bauer - Nikhef23

21/5/2007Thomas S. Bauer - Nikhef24 Advantages vs. Problems 2 "minitowers" for independent mirrors complicated: - very crowded area, - commissioning needs quite considerable time Inverted DiHedron: need to get good idea on whether it is possible; prelim. FEA indicates: lower frequency Seems to be a nice idea, but is it a viable option??

21/5/2007Thomas S. Bauer - Nikhef25 Summary End mirror: Design tooling, Gearbox, started need to finalize and approve it start production Marionetta: produce a new one? or modify existing one? DiHedron: available information collected, no decision yet. Independent mirror suspension looks quite complicated. New Dihedron with larger aperture ? inverted?