The Westampton Rolls How to Pack and Pull the Westampton Rolls Hose Load.

Slides:



Advertisements
Similar presentations
Hose Pulls Shoulder Load ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.
Advertisements

How To Pull A Pre-Connect
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Fire Hose and Appliances
Learning Objective 1 Describe the safety considerations taken when service testing a fire hose.
CVFD Training – Hose Practices
Wildland Progressive Hose Packs The Original made NEW !
FIREFIGHTER I LESSON 12A. FIRE HOSE TERMS Expansion-ring gasket Expansion-ring gasket — Gasket used at the end of hose where it is expanded into coupling.
The Cleveland Load.
Loading the SAC-METRO pack. Coil the hose with the male coupling to the inside. Using a winding table or a Gnass Hose Winder to simplify this operation.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
Ropes and Knots Skill Drills.
Getting Wet Stuff to the Red Stuff For 300 Years
Fire Hose Skills Firefighter II.
Hip Flexor Wrap.  Foot is turned straight ahead for this wrap.
FIRE HOSE AND APPLIANCES
Fire Hose and Appliances
ROSENBAUER REAR-MOUNT SPEED-LAYS
Blackwood Fire Company TL84 LDH Deployment/Restoration Training Module.
Tandem Pumping Video. INITIAL SIZE-UP When approaching the structure note the location of the FDC, Hydrant and Building Access.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Pulling working lines. Step up onto the tailboard. Step up onto the tailboard.
 Start with class room and cover terminology with PowerPoint provided (S 190)  Review the progressive hose lay in Bothell Fires Hose Manual.  Inventory.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Unit 5 Use of Water. Unit 5 Objectives b Explain different types of water use operations b Demonstrate laying a wet line with both simple and progressive.
March 2001 Training Hillcrest Fire Department. Before we get started Pair up with someone Take and record their vitals.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
How to construct the draw string bag Some things you’ll need to make a bag.
FIREFIGHTER II LESSON 12. TYPES OF VALVES Ball — Ball — Controls nozzle flow and pump discharge rates Gate — Gate — Controls hydrant flow Butterfly.
1402 Hybrid Firefighter II 6th Edition Chapter 15 — Fire Hose South Carolina Fire Academy.
Los Alamos Fire Department
FVCC Fire Rescue FIRE HOSE AND APPLIANCES. OBJECTIVES 2-7.1Identify the construction features of hose (3-3.7, 3-3.9) 2-7.2Identify the types of fire hose.
TODAYS GOALS -Hose inventory -Hose loads -Hose deployment -Hose “ hands on”
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
Programming a light sensor to follow a black line.
Search and Rescue Skill Drills.
Fire Hose, Nozzles, Streams, and Foam
Job Performance Requirement Modified Gasner Bar Pack.
Part C  Accordion load  Lay the first length of hose in the bed on edge against the partition with the coupling at the rear of the bed  At the front.
Ropes and Knots Skill Drills.
WELDING TIPS Start at one end of pattern. Lay darkest pieces onto pattern. Line up with black lines, then lightly hot-tack into place at corners. Leave.
CUTTING -Don’t fire pilot arc into air -Start cutting from edge of workpiece -Sparks should come out from bottom of piece. If they spray on the top,
HOSE ROLLS Straight roll ◦Lay the hose out straight and flat on a clean surface ◦Roll the male coupling over onto the hose to start the roll ◦Form a coil.
Step One Draw a square on your paper. Step Two Beginning in the top left corner of the square, measure to the right about a half inch and place a dot.
Team Scraps and The Five Finger Special Andrew Williams, Blake Day, Michael Raup, and Jordan Brown.
Ankle Wrap.  Use a 4 inch single wrap  Begin wrapping at the toes  Move up towards the heart  Pull wrap 1 ½ times its original length.
Search and Rescue Skill Drills.
 Fold each of the 6 pieces of paper in half, diagonally.  You can do them all at once  If the paper you're using doesn't make a perfect triangle,
Bumper Line of Engine/tanker ’ Pre-connect of 1-3/4”. 50’ flat racked with flaps and 50’ rolled. The nozzle is attached to the rolled section.
 Start with class room and cover terminology with PowerPoint provided. S 190  if you click on picture of fire a short video will play. Please try prior.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Fire Attack and Foam (Fire Fighter I)
Pipe Fittings.
Module A Fire Hose And Appliances (4-12)
Job Performance Requirement 10-16
Harwich Fire Department
Job Performance Requirement 10-19
High-rise Pack Loading
Fire Hose, Nozzles, Streams, and Foam
Fire Hose, Nozzles, Streams, and Foam
Fire Hose, Nozzles, Streams, and Foam
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Access: Queries I Participation Project
Job Performance Requirement 10-31
Loading the SAC-METRO pack
Job Performance Requirement 10-14
Job Performance Requirement 10-9
Job Performance Requirement 10-33
Presentation transcript:

The Westampton Rolls How to Pack and Pull the Westampton Rolls Hose Load

The Westampton Rolls  Easy 1 person pull and pack  150’ preconnected  Additional 50’ roll deadload  Deploys and Flakes in 25’ space  Less then 30 seconds to deploy

The Westampton Rolls  4 Single Donut Rolls  1 Nozzle  3 Rolls preconnected  1 Roll Dead Loaded

The Westampton Rolls HOW TO PACK THE LINE

The Westampton Rolls  Start roll by folding hose in half  Female coupling is on the bottom  Leave 3’ spacing between couplings

The Westampton Rolls  Begin roll  Make sure hose is straight and in line

The Westampton Rolls  Finished roll should appear as shown  About 1 to 1 ½ foot overlap in hose

The Westampton Rolls  First roll in the hose well all the way to the right  Connected to Gated Wye

The Westampton Rolls  Second Roll is added  Connect FEMALE to first length’s MALE  Leave some excess to form a loop

The Westampton Rolls  Add the third roll  Connect FEMALE to second length’s MALE coupling  Attach nozzle to MALE as shown

The Westampton Rolls  Fourth roll is dead load for extending line when needed  Add to hose well  DO NOT connect

The Westampton Rolls  Finished load should appear as shown

The Westampton Rolls HOW TO PULL THE LINE

The Westampton Rolls  Place arm through the two loops  Firmly grab the nozzle

The Westampton Rolls  Begin to walk away from the truck  Can make turns while deploying in as little as 15’

The Westampton Rolls  Line is fully deployed and flaked for charging in 25’  Line can deploy at running speeds  Once flaked, take nozzle and advance to seat of fire

The Westampton Rolls  Special Thanks to the Hubbardstown Massachusetts Fire Department for the basis of this idea  Thanks to LT Jeff Bowman, SGT Marques Fields, FF Chris Hylkema, and FF John Williams for their participation and input on perfecting this hose load