What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.

Slides:



Advertisements
Similar presentations
Q20: The X-band collider has much tighter requirements for the alignment of the beam orbit with the structure axis, yet the basic instrumental precision.
Advertisements

Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
The Siberian Snake Kai Hock Liverpool Group Meeting, 12 August 2008.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Proposed machine parameters Andrei Seryi July 23, 2010.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
RHIC pp 500 GeV development M. Bai C-A Department.
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Cold versus Warm, parameters impacting LC reliability and efficiency contribution to the discussion on risk factors Giorgio Bellettini, Seul ITRP meeting,
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Physics Questions Committee Status Report Brian Foster (Oxford & GDE) SB2009 Meeting DESY 2/12/09.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Target insertion matching and standard cell optics optimization
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Alternative/complementary Possibilities
Wake field limitations in a low gradient main linac of CLIC
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Energy calibration issues for FCC-ee I. Koop, BINP, Novosibirsk
CLIC Study Aim Conceptual design report in 2010
Field quality to achieve the required lifetime goals (single beam)
Pretzel scheme of CEPC H. Geng, G. Xu, Y. Zhang, Q. Qin, J. Gao, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai,
Accelerator Physics Technical System Group Review
Electron Polarization In MEIC
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
ILC Baseline Design: Physics with Polarized Positrons
ILC Cryogenics -- Technical Design Report Planning
Summary Thursday h21: Stable beams fill #1303.
Electron Rings Eduard Pozdeyev.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday h18: 228b fill lost just before start of ramp.
31/3/2010 Difficult day… but at the end stable beams.
Update on MEIC Ion Polarization Work
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments by Giorgio Bellettini ITRP meeting 5, CalTech, June 28, 2004

Cold at  s>300 GeV For  s >±0.5% the process will be the same for small as for large energy changes, as long as  s >300 GeV. Linac: --tune the lattice to the new energy --change the RF gradient (~instantaneous) --re-steer a low intensity beam to check and tune the orbit --ramp to full Linac specifications. “Setting the Linac to the new energy should take ~1h”. BDS: --rescale the magnetic fields of the BDS. However, magnets will have to be cycled to fix and hold the very precise tune. Despite extensive automatisation of the feedback system L will have to be optimized by continuous tuning. “Experience” indicates that this will take ~one day. Tuning Linac sounds easy, tuning BDS will be as for warm.

Cold at  s<300 GeV Below  s~300 GeV the luminosity will drop because of the reduced production efficiency of positrons by the e - beam+undulator system below beam energy of ~150 GeV. By using alternatively full energy pulses to produce positrons, and reduced energy pulses for physics the loss in L would be exactly a factor of 2. “For extended running at low energies one might decide to make some hardware modifications” to restore maximum L. At the Z the event rate is still very high and the factor of 2 loss would be acceptable. A scan at 200<  s<300 would suffer.

Warm, 1% steps scan Experience: a ±1% 2-step scan around the Z was made at SLC. It took ~8h to set stable operations and a few days to complete the scan. For the LC the estimate is also a few hours. Time is dictated by a) Linac: setting a new energy point in the energy feedback system which is currently used for energy stabilization in the Linac b) BDS: adjust and stabilize the new magnetic fields. This will require cycling the magnets several times. More, maximizing L at the BDS will be a delicate process, and “problems can be encountered”. “Experience shows that L should be maximized in a few shifts”. It is not as simple as feeding a new data table to an on-line computer and then adjusting a few knobs, but it looks feasible to me. Adjusting the BDS is the same problem as for cold.

Warm, large steps scan. Same as for small steps, except that: a) If beams are polarized, the spin rotators at the exit of the damping rings would have to be re-optimized to correct for the different spin precession in the beam delivery system. b)The positron capture efficiency downstream of an undulator depends on energy, but it would remain optimized if the undulator is at 150 GeV and if collision energies below  s = 300 GeV are obtained by decelerating the beams in the second part of the Linac. c)Adjustment of collimators in the final focus might be required. These operations would be needed only at a mature stage of the LC, when one will have learned a lot on how to optimize it. Therefore I would not worry too much now. Operations a) and c) would also be needed for cold.

Conclusion The difference between cold and warm boils down to the energy stabilization problem in the Linac, which seems more delicate for warm.