GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.

Slides:



Advertisements
Similar presentations
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Advertisements

NRAO Receivers Richard Prestage
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Integrated Receivers.
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
Receiver Systems Suzy Jackson – based on previous talks by Alex Dunning & Graeme Carrad.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
PAF Status Meeting June 2015 B. Shillue. February Slide Phased Array Feeds The Jan 2015 GBT test was successful, demonstrating: – Seven low-noise beams.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
KFPA LO Modifications (from single pixel results) Critical Design Review January 30, 2009 G. Anderson.
Glen Langston: OSU 08 1 Improved Tools for Astrochemistry Glen Langston Methods for detection of families of molecules Example: HC 7 N collaboration with.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
1 Jennifer Takaki CfAO Akamai Observatory Internship Program Project Supervisor: Lucio Ramos Subaru Telescope, NAOJ Home Institution: Hawaii Community.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
GBT Focal Plane Array Development Program Steven White Program Manager.
An Integrated Program for GBT Focal Plane Array Development Steven White Based on discussions with: Rick Fisher, John Ford, Matt Morgan, Roger Norrod,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Phased Array Feed Development.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
K-Band Focal Plane Array: Integrated Downconverter Module #1 Matt Morgan and Tod Boyd National Radio Astronomy Observatory 8/7/2008.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Centimeter Receiver Design Considerations with a look to the future Steven White National Radio Astronomy Observatory Green Bank, WV.
Australia Telescope Users Committee Technologies Report - Oct 2008.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
FourStar Status Eric Persson (OCIW) Presented By.
Extended Detector Cutoff Considerations WFIRST Project Office May
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
K-Band Focal Plane Array Steven White Program Manager.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Engineering Opportunities.
Focal Plane Arrays and Focal Plane Electronics for Large Scientific Telescopes The HAWAII-2RG (H2RG) is the leading IR focal plane array (FPA) in ground-
Camera PDR/CD1 Planning 19 September 2008
SA1: overview, first results
NOVA submm R&D program A. Baryshev, R. Hesper, A. Khudchenko, J. Barkhof, M. Bekema, P. Dmitriev, K. Rudakov, V. Koshelets, F.P. Mena, R. Finger // SRON/RuG/NOVA/IREE/TUD/UCHILE.
Matt Morgan National Radio Astronomy Observatory
LSST Commissioning: FY18 Planning
Terry Cotter LO/IF Group Leader
EVLA M/C Software PDR, 14 May 2002
05/08/09.
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting System Status
Mark McKinnon EVLA Project Manager
Observatory Science Operations
Observatory Science Operations
SDP Interface Identification
KFPA CDR R. Norrod Feb 27, 2008.
System Specifications Lab Tests
Molecular Imager: Focal Plane Array
Molecular Imager: Focal Plane Array
Presentation transcript:

GBT Focal Plane Array K band 7 Pixel Steven White Program Manager

Personnel Jay Lockman, Project Scientist Jay Lockman, Project Scientist Glen Langston, Scientist Glen Langston, Scientist Steve White, Project Manager Steve White, Project Manager Matt Morgan, Project Engineer Matt Morgan, Project Engineer Roger Norrod, System Specifications Roger Norrod, System Specifications Sivasankaran Srikanth, EM component Sivasankaran Srikanth, EM component Bob Simon, Mechanical Design Bob Simon, Mechanical Design Eric Bryerton, Noise Calibration Eric Bryerton, Noise Calibration Gary Anderson, Lo Design Gary Anderson, Lo Design Bob Garwood and Amy Shelton, Data Pipeline Software Bob Garwood and Amy Shelton, Data Pipeline Software Mark Whitehead, Software Mark Whitehead, Software Dennis Egan, Component Construction Dennis Egan, Component Construction John Ford and Galen Watts, M&C Hardware Design John Ford and Galen Watts, M&C Hardware Design Patrick Brandt, M&C Software Design Patrick Brandt, M&C Software Design

K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds for the receiver only, so the project was de-scoped to seven pixels that meets science objectives as specified in the science case. Only enough funds for the receiver only, so the project was de-scoped to seven pixels that meets science objectives as specified in the science case. $1.2 M Total $1.2 M Total $0.19 M Parts $0.19 M Parts $0.2 M Contingency $0.2 M Contingency $0.83 M Labor $0.83 M Labor The K band seven pixel focal plane array is the path finder instrument: a necessary first step and feasible considering time frame. The K band seven pixel focal plane array is the path finder instrument: a necessary first step and feasible considering time frame. Seven pixel array construction complete December, 2009 Seven pixel array construction complete December, 2009 Production use by November, Production use by November, 2010.

Purpose of Review Given the K-band Focal Plane Array system specifications are derived for a specific scientific case, did the single K-band pixel demonstrate satisfactory performance as the prototype for the seven pixel instrument? Given the K-band Focal Plane Array system specifications are derived for a specific scientific case, did the single K-band pixel demonstrate satisfactory performance as the prototype for the seven pixel instrument? Is the final design of each component in compliance with the system specification? Is there any component that may compromise the instrument’s scientific objectives? Is the final design of each component in compliance with the system specification? Is there any component that may compromise the instrument’s scientific objectives? Are the compromises for expansion and decisions to simplify the design justified given the schedule and GBT turret constraints? Are the compromises for expansion and decisions to simplify the design justified given the schedule and GBT turret constraints? Is the schedule achievable, budget and spending reasonable, and are there any obvious critical path items that will compromise the program? Is the schedule achievable, budget and spending reasonable, and are there any obvious critical path items that will compromise the program? As defined by the observing-mode document, is the pipeline development ad data analysis reasonable in its approach? Are there any other modes to be considered? As defined by the observing-mode document, is the pipeline development ad data analysis reasonable in its approach? Are there any other modes to be considered?

K-band FPA Deliverables Frontend Frontend Cryogenic Package for Seven Pixel Instrument Cryogenic Package for Seven Pixel Instrument Seven Dual Circular Polarization K band Pixels Seven Dual Circular Polarization K band Pixels Modular Noise Calibration for each Pixel Modular Noise Calibration for each Pixel Modular Downconverter for each Channel (14) Modular Downconverter for each Channel (14) Monitor and Control Electronics Monitor and Control Electronics LO Distribution with Doubler for LO1A LO Distribution with Doubler for LO1A Software Software Package for Engineering M&C Package for Engineering M&C Observing Software Manager Observing Software Manager Data Analysis Pipeline Data Analysis Pipeline Cost per Pixel not including NRE. Cost per Pixel not including NRE. $46,000 Parts (Dewar,EM parts, Isolator, HEMT Amp, WG parts, Noise Mod, IDM) $46,000 Parts (Dewar,EM parts, Isolator, HEMT Amp, WG parts, Noise Mod, IDM) $2500 Labor Construction. $2500 Labor Construction. $2500 Software upgrades. $2500 Software upgrades.

Milestones 02/28/08 Conceptual Design Review acceptance. 02/28/08 Conceptual Design Review acceptance. 05/08/08 Single Pixel Construction Complete 05/08/08 Single Pixel Construction Complete 08/13/08 M&C Hardware Module with support software complete. 08/13/08 M&C Hardware Module with support software complete. 08/22/08 Single Pixel Construction Complete 08/22/08 Single Pixel Construction Complete 08/31/09 Initial cool down and measurement. 08/31/09 Initial cool down and measurement. 12/31/09 GBT Tests Complete. 12/31/09 GBT Tests Complete. 1/31/09 Critical Design Review 1/31/09 Critical Design Review 12/01/09 Observing Support software complete. 12/01/09 Observing Support software complete. 12/01/09 Multi-pixel Testing Construction complete. 12/01/09 Multi-pixel Testing Construction complete. 01/01/10 System Integrate & LAB Test complete. 01/01/10 System Integrate & LAB Test complete. 02/18/10 Data Analysis software complete 02/18/10 Data Analysis software complete 04/06/10 Telescope Testing complete. 04/06/10 Telescope Testing complete. 11/08/10 Commissioning complete. 11/08/10 Commissioning complete.

CDR Topics GBT Observation Results GBT Observation Results System Specification and Laboratory Tests System Specification and Laboratory Tests EM Component Results EM Component Results Noise Module Noise Module Integrated Down Converter Integrated Down Converter Mechanical Design Mechanical Design LO Design LO Design Monitor and Control Hardware Monitor and Control Hardware Monitor and Control Software Monitor and Control Software Data Pipeline Data Pipeline

Budget and Expenses Thru 2010 All Big Ticket Items

Compromises Smaller Dewar Smaller Dewar Reduces cryogenic load Reduces cryogenic load Smaller refrigerator Smaller refrigerator Shared compressor Shared compressor Reduced weight Reduced weight Reduction in Mechanical Complexity Reduction in Mechanical Complexity Individual thermal transitions Individual thermal transitions Individual waveguide output transitions Individual waveguide output transitions

Future FPA Developments Wish List Significantly enhanced spectrometer with this new array and existing IF system. Significantly enhanced spectrometer with this new array and existing IF system. New digital I.F. distribution system. (Spectrometer and technology dependent). New digital I.F. distribution system. (Spectrometer and technology dependent). Expanded focal plane array (perhaps at a different frequency: W band) Expanded focal plane array (perhaps at a different frequency: W band)