Solenoid Status Paul Brindza Dec. 12, 2003. Status of work at IUCF Solenoid R&R is based on a MOU between JLAB and IUCF The MOU divides the work into.

Slides:



Advertisements
Similar presentations
G2P Target installation and Beyond. Schedule Pivot before.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Vacuum Vessel Production Readiness Review
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
SPECTRAP - GSI progress report and status overview.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
HD target.
Hall D Cryostat Heat load and Flow calculations What are we doing ? 1. Measuring the heat leak into the magnet for all the 4 coils 2. Determining of number.
Lesson 9: Discovering electricity. What happened?
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
AIR CONDITIONING (COOLING)
1 MICE Hydrogen system Working group mtg – 01/09/14.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
TROUBLESHOOTING ELECTRIC MOTORS
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – March 2008.
Integration of the Spectrometer Solenoid Magnets
Chapter 30 Inductance, Electromagnetic Oscillations, and AC Circuits
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 18th April 2017
LARP Vertical Test Facility
Cryostat design Mechanical design: Thermal screens: Specifications:
MICE Coupling Coil Update
Physics 122B Electricity and Magnetism
Magnetism.
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
HRS at small angles for e+/ e- pair for APEX
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Thermal Shield & MLI
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Solenoid Status Paul Brindza Dec. 12, 2003

Status of work at IUCF Solenoid R&R is based on a MOU between JLAB and IUCF The MOU divides the work into three Phases and a pause. Phase zero is measurement and investigation. This includes electrical measurements on each coil, instrumentation checkout, leak testing and pressure testing and mechanical measurements of the shields in coils 1 and 4.

Status of work at IUCF Phase one includes the rework of all four coils and final testing and evacuation. This includes replacement of the LN2 shields, repair of instrumentation and other internal work The pause is to allow time for getting the Model 2800 Helium refrigerator operational Phase two includes the replacement of "puffing billy" and the reassembly of the solenoid, new controls and instrumentaion and mating with the new power supply. At present Phase zero is near completion.

Phase zero measurements and results Coil electrical measurements Coil # Across Coil LH Lead - Ground RH Lead - Ground 14.9 O2.2 O6.4 O 23.2 OOPEN 32.7 O2.6 O0.2 O 45.2 OOPEN

Coil Inductances Coil 1 Coil 2 Coil 3 Coil mH 244 mH 172 mH 763 mH

Internal instrumentation and voltage taps Each coil has voltage taps (VT) and Carbon Resistance Thermometers (CRT) in the Helium vessel and Thermalcouples (TC) on the N2 shield and strain gauges (SG) on the support posts. Coil 1 Coil 2 Coil 3 Coil 4 VT OK OK OK OK CRT 7 of 8 OK OK OK 4 of 7 OK TC OK OK OK OK SG 3 of 6 OK 2 of 6 OK OK 3 of 6 OK Note: coil 4 has some extra CRT’s in unknown locations.

Leak testing and pressure testing N2 Shield He Vessel External Pressure tests Coil one 5 x 10 ^ -5 OK 12 inch bellows OK Coil two OK 2 x 10 ^ -6 OK OK Coil three 4 x 10 ^ -5 OK 12 inch bellows OK Coil four 4 x 10 ^ -6 OK OK OK Leak rates in torr-liter per second

Ongoing work for Phase zero Coils 1, 3 and 4 have been evacuated, backfilled dry and sealed. A search is on for the Helium leak in coil 2 The N2 shield has been removed to provide access The He vessel has been pumped to reduce background The He vessel will also be pressurized and "sniffed" The leak will be repaired by welding when found During the leak investigation further tests to locate the probblems with the strain gauges have been performed

Ongoing work for Phase zero All four coils have had conflat flanges added to all internal connections to permit high quality leak testing and to permit future connections without "cut and weld". The two damaged and leaky 12 inch bellows will be replaced. Attempts to repair have proven to be temporary The model 2800 helium refrigerator is indoors and is being prepped for shipment to JLAB The JLAB cryo group will perofrm a thorough checkout, some updating and a dry run To test the turbines. The new N2 shield design based on field measurements of coils 1 and 4 and original drawings is being finalized at JLAB in consultation with the manufacturer. The N2 coolant flow for the new shields has been evaluated. Potential modification to the "cake pan" coil covers is being evaluated with IUCF to provide better clearance for assembly and insulation

Cake Pan Modifications Cross section of coil 2,3,4

Status of Phase one A Scope of Work (SOW) and Purchase Requisition (PR) have been prepared The SOW and PR have been circulated at JLAB for signature Final approval is awaiting CD-0 The SOW has been sent to IUCF for comment. The Scope of Work includes the complete R&R of all four coils. This includes replacement of the LN2 shields, repair of any leaks, repair (if possible) of instrumentation, final evacuation and leak test, pressure test and dry storage until Phase two

Magnetic simulations of the upstream hole and an iron plug with varying gaps.

Bmod over a patch (-5 < Z < 80, 10 < R < 80 inches) 4 inch gap, max field.208 T, Integral B.dA = 132 Tesla inch^2

Bmod max on patch upstream

Integral Bmod over patch upstream

Bmod on patch with big hole

Bmod on upstream patch 4 inch gap with thin plug