1 Cable Functional Specification March-21-2014 Conductor Working Group Arup K. Ghosh (BNL)

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
QXF Cable, 1 st generation Giorgio Ambrosio, Paolo Ferracin Fermilab CERN QXF Video-meeting June 18, 2013 The HiLumi LHC Design Study is included in the.
HT-C22 and C23 LARP Video-Mtg Arup K. Ghosh Arup Ghosh
Fred Nobrega October 3,  Cable is mechanically unstable, 40 x 0.7 mm dia. strand, mm wide.  PC01 had >5 popped strands on each layer, roped.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
Arup Ghosh Workshop on Accelerator Magnet Superconductors ARCHAMPS March Cable Design for Fast Ramped SC Magnets (Cos-  Design) Arup Ghosh.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
DOE Review of LARP – February 17-18, 2014 QXF Design, Fabrication and Irradiation Study Giorgio Ambrosio 2/17/14 1.
Niels Pyka, FAIR Synchrotrons SIS300 Preconsortium Protvino, March 19th 2009 SIS300 lattice and main required parameters of the magnets.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
LARP Collaboration Meeting Racetrack Coil Fabrication
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
MQXF cable with RRP wires for Q2
MQXF Design and Conductor Requirements
Winding tests on Roebel cables
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
Development of the Canted Cosine Theta Superconducting Magnet
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
CERN Conductor and Cable Development for the 11T Dipole
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
the MDP High Field Dipole Demonstrator
EuCARD2 WP 10.2 HTS Conductor
MQXF cable with RRP wires for Q2
Vincent Roger, Siarhei Yurevich, Cecilia G. Maiano, Mario Sapinski
Daniel Chávez A NbTi Cable-in-Conduit conductor for the
Assessment of stability of fully-excited Nb3Sn Rutherford cable with modified ICR at 4.2 K and 12 T using a superconducting transformer and solenoidal.
Presentation transcript:

1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)

2 Cable Functional Specification CableLARPCERN ( RRP)Tolerance Agree 1 Width, mm18.15 ± Mid-Thickness, mm1.525 ± Keystone angle, Deg0.55 ± 0.1 4Pitch Length, mm109 ± 3 5Core MaterialSS 316L SS tape is annealed 6 Core Size Width, mm Converge on the width ? 7Core Size Thickness, mm Cabling Damage< 5% From extracted strands, Ic 9RRR Extracted Strand> 100 Minor edge Measurement

3 Cable Functional Specification “no-decision” CableLARPCERN ( RRP)Tolerance Agree 10Core Location Biased towards Major Edge ? 11Cabling Spool tension4-6 Kg 12CMM meas at Mpa17 13Lubricant4BR Quantify how much 14 Strand state for Cabling (annealed or fully cold- worked) Annealed at 170C/16-24h LARP specs 15Cable Residual Twist< 150 deg Spec ? 16 Winding Stability How to Quantify: With or W/O Insl. 17Sub-element damage Assessment of cabling damage using cable x-section: Quantify 18 Quench Current in VI at (6) 5 T, 1.9 K, A (> 1200) Being defined VH meas. At 4.2 K not important