8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
1 MCHP-1 clamp and MC port opening metrology review ProE model: stb-mchp-1_vvsa1_pppl_best_fit.asm stb-fpa_mech_left_side.asm, Rep: mchp-1_clamp_metrol_pts.
Pre-Lehman Review Briefing Reiersen December 18, 2006.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
PASI OsC meeting 12th July 2012
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Preparations for working on Station 1 November 22, 2005.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
NCSX Vacuum Vessel Fabrication
GLAST Large Area Telescope:
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Verification and Validation Unit Testing
GLAST Large Area Telescope:
Cryomodule Assembly Plan
Presentation transcript:

8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager

8/15/2007Mike Viola2 FPA is Accomplished in Five Stages Station 1 - VV Prep Station 2 - MC Half Period Assembly Station 3 - MCHP installation over VV Period Station 4 - TF Half Period Assembly Station 5 - Final Assembly in NCSX Test Cell Station 6 - Machine Assembly Station 4 – TF alignment activities performed during Station 5 Four

8/15/2007Mike Viola3 “SAFELY SAFELY SAFELY” Documentation and Integrated Safety Management (ISM) Work Plans –Manufacturing Facility Operation Plan (MFOP) completed for overall facility conduct using ISM as its basis. –Job Hazards Analysis (JHA) developed for FPA activity Main hazard: components must be lifted by crane – many lifts will occur in several orientations. Lift procedures with individual lift data sheets are developed for each type of lift –Activities Certification Committee (ACC) independently reviews each station setup, operations, and plans before station is activated. Station 1 review complete and declared operational Station 2 trials review complete

8/15/2007Mike Viola4 FPA Process Definitions FPA Manufacturing, Inspection, Test, Quality Assurance Plan (MIT/QA) Complete –Input (Station specific): Dimensional Control Plan (Art Brooks) FPA Assembly Sequence Plan (Tom Brown) FPA Specification and Assembly Drawings (Mike Cole) –MIT/QA Plan provides basis for individual procedures to perform tasks then revised to include developed improvements. FPA Procedures –FPA station 1 procedure complete and active –FPA station 2 trials are providing input to procedure development ADDED DAILY ACTIVITY REVIEW MEETING Report day’s progress provide clear guidance for next day Obtain instant feedback from ORNL design team

8/15/2007Mike Viola5 FPA Cost and Schedule Drivers History of growth due to complexity Tolerance budget is divided throughout the fabrication Metrology (Nothing can be checked with a ruler) Design uncertainty and lack of timely drawings Concurrent Engineering We have changed the project structure and have put in place a schedule, system, and people that enable us to detect our problems in advance and develop resolutions and implement them in a timely manner. –Measure all modular coils in advance of assembly developed new alignment techniques –Complete designs earlier to minimize configuration changes not rely on concurrent engineering as much during assembly phase –Augmented metrology team and back office support two additional engineers each. –Augmented trials to discover problems BEFORE the critical path. Added stud tension, bushing, nose weld trials We have an active system in-place to deal with the problems that lie ahead. –Daily review of field progress and facilitation of needs (Viola) –Weekly review of project needs (Anderson) We have a re-vitalized system that has produced these results with clear evidence of this successful transition (next slide) Problems discovered in field without time to resolve

8/15/2007Mike Viola6 Evidence of this successful PROACTIVE transition Station 2 FPA trials enhanced and well in progress: –Gross fit individual mating coils found minor interferences that are all understood and straightforwardly resolved in a few days. –Joint design trials Stud tension, shim fit, bushing fit, nose weld Remaining trials for Station 2 (useful for Station 3 also): –Install and torque bolts – assess accessibility COMPLETE Incorporated into coil punchlist activity –Develop shim technique COMPLETE Incorporated into shim design –Install holes and studs for nose NEW WELDED DESIGN trials in process –Pillow shims TRIALS SUCCESSFUL –Install Alumina coated metal shims Shims on order –Install shims and bolt bushings in vertical orientation Preliminary design level for Station 3 and 5

8/15/2007Mike Viola7 FPA Activity and Risk Resolution – Station 1 Station 1 (Install vacuum vessel external components diagnostic coils, cooling tubes, thermocouples using Leica laser tracker) –All three VVSA’s were received by 9/21/06 –All work performed on station 1 fixture (2 “rotisserie” stations) with laser tracker & 2 men; augmented with 3 technicians when needed –Risks are identified – Installation Progressing Technique developed to locate diagnostic loop templates Technique developed to adjust interferences (cooling tube studs and thermocouples) Technique developed to install diagnostic templates Technique developed to wind diagnostic loops Technique to hold heating tapes in place on vertical ports. Technique to connect cooling hoses to vertical risers RISKS RESOLVED AND ACTIVITY AHEAD OF SCHEDULE

8/15/2007Mike Viola8 NCSX Vacuum Vessel Station 1 90% Complete VV #1 and VV #2 95% Completed VV #3 80% Complete Diagnostic loop termination, cooling tube testing and final scans remain VVSA with ports welded VV #1 VV #2 VV #3 completing diagnostic loops

8/15/2007Mike Viola9 Station 1 Activity nearly complete – Metrology all the way Much was learned from VVSA fabrication Laser tracker using Verisurf® Station 1 steps: Install VVSAs in Station 1 Rotating Fixture COMPLETE Best fit Scan performed – confirmed MTM scans!! COMPLETE Mark Flux Loop Templates COMPLETE Mark Heating Coolant Stud Locations COMPLETE Shoot studs – vacuum vessel #1&2 COMPLETE Vertical Port Component Installation –Install heating cooling manifolds COMPLETE –Install 29 thermocouple mounting plates on port 12’s and vacuum vessel. COMPLETE –Install heater tapes COMPLETE –Install risers 2 of 3 COMPLETE Install of Magnetic Flux Loop COMPLETE Install Thermocouples COMPLETE Install H/C lines 2 of 3 COMPLETE Final Loop Routing and Measurement 1 of 3 COMPLETE Perform final testing and scans Schedule to complete #1 May ’07 95% COMPLETE #2 Aug ’07 95% COMPLETE #3 Jan ’08 80% COMPLETE

8/15/2007Mike Viola10 Station 2 (3 coil preassembly – scan, align, shim, weld, and assembly using laser tracker) Activity has begun: –A1, B1, and C1 have all been gross fit to each other found minor interferences that are all understood and straightforwardly resolved in a few days. –Measurements started – new technique for reproducing original scans shows great promise. Discovered that coils deform from nominal shape by up to 0.020” Major Tool dogged coils onto a fixture and then performed machining PPPL takes that coil and fixes it into a winding ring and then performs scans referenced to newly installed conical seat fiducials After coils are wound they are removed from the ring which allows flexure Coils are mounted onto flat wedges and “racked” using adjustable wedges to reproduce conical seat alignments ” is required –Originally achieved ~0.014” RMS scan: unacceptable –New racking technique achieves 0.005” RMS scan FPA Station 2 Activity

8/15/2007Mike Viola11 FPA Station 2 Risk Management – Developed alignment technique Learned that positioning and leveling is simpler than expected –Simple corner plates with dial indicators Achieved –X-Y +/-0.002” –Z +/ ”

8/15/2007Mike Viola12 FPA Station 2 Risk Management – Gross fit-up finds problems in advance of critical path! B1 C1 Fitup A1 B1 Fitup Overcast

8/15/2007Mike Viola13 Shims need to fit properly to work in shear –Accurate thickness –Sufficient surface contact FPA Station 2 Risk Management – Developed shim fit requirements Effects of varied tension and film range Varied single shim by 0.001”

8/15/2007Mike Viola14 Utilize every opportunity Assembly techniques tried in parallel with interface design development trials New technique for reproducing original alignments shows great promise Alignment technique developed –Achieved X-Y +/-0.002” Z +/ ” Gross fit-ups identified potential interferences Bushing design and fit trials offered opportunity to save 7 of 10 days on critical path Ultrasonic tension meter accurately confirms tension –Can be checked over the life of the machine Assigned engineer to managing coil punchlist job and Station 2 preparation –Coils will arrive completely ready to assemble Joint task force lead by Phil Heitzenroeder is resolving the welded nose and joint issues. As part of the rebaseline we have changed our plan to allow design changes and interferences to be discovered in advance of the critical path! FPA Station 2 Risk Management – trials are invaluable

8/15/2007Mike Viola15 FPA Station 2 Issues Most Previous Concerns RETIRED Joint is still complex (welded nose shims and tight fitting bushings) but we have gained great confidence through trials. –Welded nose Trials Promising –Bushing OD custom fit in advance Critical path activity reduced to 3 days from 10! Rebaselined Schedule –As part of the rebaseline we went from ½ page of sequence steps to 7 pages incorporating new found respect for metrology and stringent sheer design requirements.

8/15/2007Mike Viola16 FPA Station 3 Activity Station 3 (install coils onto vacuum vessel using laser tracker) –Alignment and assembly trials are being developed at station 2 –Actuators received for 3 legged manipulation of coils over vacuum vessel Positioning demonstrated to be easily achievable using simple lasers with tracks Each leg capable of full load plus 3:1 design factor

8/15/2007Mike Viola17 FPA Station 3 Issues Station 3 (install coils onto vacuum vessel using laser tracker) Resolved Issues –Alignment and assembly trials are being developed at station 2 –Trial with 25,000 lb. block resolved main concern of installing coils onto vacuum vessel –Complex installation mechanism replaced with simple 3 legged actuator system Concerns (Although low risk) –Out of tolerance conditions may cause interferences between coil and vessel (We have learned that CAD space is not real world) Trials are included in the new schedule to discover potential problems –Potential problems associated with vertical alignment Again trials are included in the new schedule to discover potential problems

8/15/2007Mike Viola18 Station 5 FPA Activity – Job 1815 in NCSX test cell Station 5 (weld ports, install TF coils, leak check, final metrology) –final assembly in NCSX test cell –Leak check moved to final assembly –Now at Preliminary design level Design simplified but still strong dependency on metrology and alignment –Trials to be developed

8/15/2007Mike Viola19 FPA Station 5 Issues Resolved Issues –Port weld preps are acceptable Previous concerns are being mitigated –Previously concerned that there could be excessive distortion during to welding on ports Can be monitored and equalized in-situ –Previously concerned that the TF/PF Structure would be complex and hard to align. Preliminary design review of new design indicates a more reasonable design Station 5 design is much more mature and the sequence plan has been significantly enhanced with far more detail.

8/15/2007Mike Viola20 Risk Register 2 New “blue” lift beams designed and built.

8/15/2007Mike Viola21 Risk Register Ports will be individually tested as they are welded on.

8/15/2007Mike Viola22 Cost and Schedule Increased FPA increased 150% from 2 years ago. WHY? We have learned a great deal over the past two years. –We have learned from the Major Tool VVSA and Modular Coil contracts and PPPL Modular Coil winding experience that metrology and tight tolerances are a significant cost driver. Iterations between the field techs and the back office must be accounted for to understand the measurements and meet the tolerance requirements. –We have learned from Station 2 process development activities and have a better understanding of the steps required to handle, accurately position, and fasten the modular coils. –The design has matured, revealing complexities not previously appreciated. We have updated our estimates with input from field crews, design, and dimensional control to incorporate this understanding and include realistic allowances for problems. –The assembly detail significantly increased to allow for pre-measurements with laser trackers to accommodate the precision required and perform trials in advance of the actual assembly. For example, Station 2 alone went from ½ page of sequence steps to 7 pages. Station 3 and 5 have moved from a conceptual scheme to a detailed plan. –ALL done with metrology teams and back office support. Metrology accounts for $2.4M of the $9M for FPA. –Task durations account for impacts of complexity and tight positioning tolerances. –Measurements of as-built coils and rework of over-cast conditions are included in the estimate. We have realistically assessed the activities required to complete field period assembly. We now have “center of the error bar” estimates that account for the extra time and cost to assemble the machine including the engineering and metrology oversight to achieve a successfully managed project.

8/15/2007Mike Viola23 Rebaselined Schedule Station 1 is likely to complete ahead of schedule. Station 2 trials and Pre-measuring and fit-up checks have been revealing and provide a solid basis for realistic cost and schedule. Station 2 critical path activities have begun and are on track. Station 3 and 5 activities allow for early discovery.

8/15/2007Mike Viola24 Summary We have changed the project structure and have put in place a schedule, system, and the people necessary to enable us to detect our problems in advance and develop resolutions and implement them in a timely manner. Added daily activity review meeting and weekly planning meetings Station 1 risks have all been resolved and activity ahead of schedule. Station 2 risks are being actively managed, budgeted in the rebaselined schedule, and the resolutions are promising. Station 3 and 5 designs are much more mature and their sequence plans have been developed in detail including the necessary metrology and trial elements. The new rebaseline has taken a realistic look at the challenges and incorporated sufficient time and resources to detect and mitigate problems. I have great confidence in successfully meeting the rebaselined schedule.