13/Nov/2013 1 40mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.

Slides:



Advertisements
Similar presentations
WP-M3 Superconducting Materials PArametric COnverter Detector INFN_Genoa Renzo Parodi.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Superconducting rf test facility STF Mechanical grinding development Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Cavity BPM for Spectromety: progress and plans A. Lyapin.
Lorentz force detuning measurements on the CEA cavity
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
94 GHz Switching Circulator Tracy Shain Ryan Nichols Daniel Komisar Andrew Gadbois Advisor: Prof. Paul Siqueira.
3.9 GHz Deflecting Mode Cavity Timothy W. Koeth July 12, 2005.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
Coupler without copper coating S. Kazakov 11/13/2013.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Measurement of Integrated PA-to-LNA Isolation on Si CMOS Chip Ryo Minami , JeeYoung Hong , Kenichi Okada , and Akira Matsuzawa Tokyo Institute of Technology,
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
SPL Seminar 2012 BE-RF-LRF HOM couplers for SPL cavities Kai Papke 1 Comparison of different design approaches.
Study of absorber effectiveness in ILC cavities K. Bane, C. Nantista, C. Adolphsen 12 October 2010.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
RRR and thickness measurements of Cu plating
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
1.3GHz Input Coupler for ILC
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Nov. 28, 2003RF System Overview, K. Akai1 RF System Overview Contents: ◆ High beam current and measures ◆ Construction ◆ Damping ring RF system ◆ Crab.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
Mechanical Analysis Thermal Analysis Ø78 mm Ø106 mm L CLASSE facilities are operated by the Cornell Laboratory for Elementary Particle Physics (LEPP) and.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
R&D for Fundamental Power Coupler in SRF Mass-Production
T5.2: Harmonization - Material and Component Reference
MICE RF Cavity Simulations and Multipactor
CLIC Main Linac Cavity BPM Snapshot of the work in progress
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
KNU IP-BPM and Reference cavity
EM characterization of SiC
FPC Coupler RF Dipole Kick
Cost reduction activities in cavity fabrication at MHI
Update on PS Longitudinal Impedance Model
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
800 MHz 2-Cavity module simulations
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
Multipacting Simulations of TTF-III Coupler Components*#
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Numerical Calculations of Field Enhancements due to Small Grooves
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Test RF gun cavity Takuya Natsui.
SPS-DQW HOM Measurements
HBP impedance calculations
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future Plan This report is made by help from Kako-san and Sakai-san. Kirk

superconducting rf test facility Motivation 13/Nov/ mm 60mm DESY/FNAL Cavity PackageKEK Cavity Package TTF3 CouplerSTF2 Coupler In view of “Plug compatibility”, the use of STF2 coupler should be evaluated for 40mm diameter. What is the most simple way for this change?

superconducting rf test facility Design of 40mm STF2 Coupler 13/Nov/ Only this part should be modified for minimum change! I used HFSS for this calculation.

superconducting rf test facility HFSS modeling for each step 13/Nov/ Step 1: only cold part Step 2: full modelStep 3: bellows Bellows are Not included!

superconducting rf test facility Step 1: Only cold part without bellows 13/Nov/ mm40 mm 1.3 GHz S 11 The both types has S 11 with <-25 dB! Same structure

superconducting rf test facility Step 2: Full model without bellows 13/Nov/ mm40 mm 1.3 GHz S 11 Same structure The both types has S 11 with <-20 dB!

superconducting rf test facility Step 2: Full model without bellows 13/Nov/ mm40 mm

superconducting rf test facility Step 3: Evaluation of bellows 13/Nov/ mm40 mm 1.3 GHz (-22 dB) 1.3 GHz (-18 dB) S 11 We have to develop the smaller bellows. Same structure

superconducting rf test facility It’s no problem in RF performance for 40mm STF2 coupler! 13/Nov/ “Tentative” Conclusion at least

superconducting rf test facility 13/Nov/ Future Plan  Mechanical Design for 40mm STF2 Coupler  More important than RF calculation  Especially, inner conductor in cold part  Tuning range (1-10 x 10 6 ) to be estimated  Lower cost  If the cost is higher, it’s no meaning!

superconducting rf test facility 13/Nov/ To Do List (Simulation)  Cavity-to-Coupler coupling should be fixed  Simulated by HFSS or CST Studio  Full model simulation with Doorknob  Simulated by HFSS or CST Studio  Test bench simulation with Waveguide  Simulated by HFSS or CST Studio  Multipactoring  Simulated by CST Studio or TRACK-3P or OMEGA-3P  Others (?)

superconducting rf test facility 13/Nov/ To Do List (Mechanical Design)  Inner Conductor  Inner Conductor Bellows in cold part  Doorknob

superconducting rf test facility Thank you for your attention! 13/Nov/