PROFILE 1. 2 To be the “model and nature centric JV of highest value” by metamorphosing vagaries of weather and dependence on Railways in to strengths.

Slides:



Advertisements
Similar presentations
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
Advertisements

PROFILE. Board of Directors  Dr. Rajkumar Khatri IAS Secretary to GoK – IDD Chairman  Mr.K.Jothiramalingam IAS Principal Secretary to GoK – Director.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
Companies: Share Capital and the Statement of Financial Position Chapter 14 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
profit prior to incorporation
INCLUSIVE FLEXIBLE REMUNERATION PACKAGE SYSTEM (DISPENSATION) FOR MEMBERS OF THE SENIOR MANAGEMENT SERVICE(SMS) ON LEVELS 13 TO 15 Presenter’s Name : D.
Main Features: 1. Provides for a Basic Allowance of $25,600 and, 2. Provides for a second Basic Allowance of $19, Effectively exempts from Income.
Copyright © 2010 Pearson Prentice Hall. All rights reserved. Chapter 12 Forecasting and Short-Term Financial Planning.
Unit 2 – Finance Topic 1 - Accounting
Unit 4: Utilizing Financial Documents
Corporations: Paid-in Capital and the Balance Sheet
Income Statement and Balance Sheet
1 Freight Operations Information System COM/CCM’s Conference
This week its Accounting Theory
GOVERNMENT ACCOUNTS AND BUDGET- AN OUTLINE
FINANCIAL STRUCTRE OF INDIAN RAILWAYS.
© 2008 TAB Boards International, Inc Understanding Financial Statements.
Classification of PP&E
Section 1: Financing Through Bonds
OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) For Apr’ %
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Report of the Comptroller and Auditor General Of India For the year ended 31 March 2000 Removal of Garbage and Sanitation Work Government of National Capital.
CA Madhuri Thete 1.IAS 23 Borrowing Cost 2.IFRS 5 Non-current assets Held For Sale and Discontinued Operations.
COST CONCEPTS SANJAY UPRETI PAM. Some important cost concepts Fixed Cost Fixed costs are such costs which will still have to be incurred even if the production.
PROFILE. Hassan Mangalore Rail Development Company Limited was incorporated in July 2003 under the Companies Act of 1956 as a joint venture of the Government.
The 3 main financial statements How they give us different kinds of information about organisational performance.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved Chapter Thirteen: Statement of Cash Flows.
Connolly – International Financial Accounting and Reporting – 4 th Edition CHAPTER 13 INCOME TAXES.
Bisk Chapter 8 – Leases.
OPERATIONAL PERFORMANCE MAY’12 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2011 – 12) For May %
Serving the Cause of Public Interest Indian Actuarial Profession 23rd India Fellowship Seminar Management of expenses and Relevance of 17D rules post Product.
OPERATIONAL PERFORMANCE JUNE’12 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2011 – 12) For June %
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Financial Accounting, Seventh Edition
BUDGET ON DIRECT TAXES 2014 (Private & Confidential) VINOD K.MEHTA & CO. B-5 SATYAM SHOPPING CENTRE, M.G.ROAD,GHATKOPAR(E), MUMBAI TEL:
©The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin Chapter Four The Double-Entry Accounting System.
Earning Enhancing Schemes Sanjay Upreti PAM. Rolling Stock Assets Locomotives Diesel Electric Steam Total Wagons Coaches
1 Chapter 6: Revenue Analysis. 2 Revenue Recognition Criteria Both the criteria should be satisfied: Good and service has been delivered Cash is collected.
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
5.3.3 Income Statements 1. Learning Outcomes To understand the main features of an income statement To be able to use simple income statements in decision.
HOMEWORK Review Questions Bank Accounting
Credit Risk. Possibility of loss from the failure of loan or debt instrument repayments. Change in the repayment capacity of borrowers or debt instruments.
Entrepreneurship Business Plan Utilizing Financial Documents.
Oct Project Fund- An Instrument to Finance Infrastructure Projects Two Case Studies.
HASSAN MANGALORE RAIL DEVELOPMENT COMPANY LIMITED
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
ADB Grant No.0133-CAM/Component 1: PFMRD ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Day 1: June 07,
1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/11 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/11 ( R.
Finance I Everything you wanted to know about finance but were afraid to ask!
Copyright © 2010 Pearson Prentice Hall. All rights reserved. Chapter 12 Forecasting and Short-Term Financial Planning.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Financial Planning December 2013 Today Incorporation Assessment Bookkeeping Tax and VAT Finances Risk Social Currency.
Business in a Changing World McGraw-Hill/Irwin Copyright © 2009 by the McGraw-Hill Companies, Inc. All rights reserved. Chapter 14 Accounting and Financial.
ANALYZING START-UP RESOURCES
Unit 4: Utilizing Financial Documents
BUDGET AS PLANNING & CONTROLLING TOOL
Distributing Dividends & Preparing Work Sheet
University of 6th of October, Egypt
© 2014 Cengage Learning. All Rights Reserved.
Unit 5.1 Utilizing Financial Documents
Statement of Cash Flow Analysis MBA Kathmandu University School of Management (KUSOM)
Dr.S.S.Jadhav Head, Dept of Commerce mrs.k.s.k. college beed
Unit 4: Utilizing Financial Documents
Concepts and Objectives of Cost Accounting
Ch. 8 Utilizing Financial Documents
Keyman Insurance (for companies) 1.
Gary A. Porter and Curtis L. Norton
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

PROFILE 1

2 To be the “model and nature centric JV of highest value” by metamorphosing vagaries of weather and dependence on Railways in to strengths duly leveraging staff, ghat beauty, technology and spiritual and by espousing team work, honesty and creativity as core values so that the interests of the shareholders and customers are served best. ****** Vision

3 MISSION To become Rs. 500 Crores net worth company by 2025 by:  Augmenting Line Capacity.  Vigorous marketing (along with SWR, NMPT and MEL).  Tapping the commercial/tourist potential of the section.  Creative use of technology.  Taking up non-safety related works.  Identifying efficient methods/processes to reduce operational cost.

Board of Directors  Mrs. Vandita Sharma IAS Principal Secretary to GoK – IDDChairman  Smt. K Ratna Prabha IAS Addl Chief Secretary to GoK – C&IDirector  Mr. Manoj Kumar Srivastava IRTS Executive Director Perspective Planning Railway Board Director  Mr. P Ganeshwara Rao IRTS Chief Operations Manager, S W RlyDirector  Mr. Rajkumar Lal IRTS Divisional Rly Manager, MysoreDirector  Mr. P C Parida Chairman New Mangalore Port TrustDirector  Mr. Anil. B. Shenoy CFO & Company Secretary, Infrastructure Dev Co. Karnataka Ltd Director  Mr. Ashwin Paul Head Commercial, MELDirector  Mr. S Gagarin IRTS From RailwaysDirector & CEO 4

5

Hassan Mangalore Rail Development Company Limited was incorporated in July 2003 under the Companies Act of 1956 as a joint venture of the Government of Karnataka & the Ministry of Railways. Objective: HMRDC to take over the gauge conversion of the Hassan Mangalore railway line and ensure its early completion through appropriate and timely funding. The company was to raise the required resources through debt and equity. The Beginning 6

Project Implementation The gauge conversion of the line has been completed under a set of agreements signed by the Company with the Ministry of Railways and the South Western Railway. Concession Agreement Construction Agreement Operations and Maintenance Agreement The line was commissioned for goods traffic on 5 th May 2006 and for passenger services on 8 th December Company is enjoying Tax Holiday under section 80-IA of the Income Tax Act for 10 years from COD. 7

Framework of operation of SPV Key features of the framework are: Cost of construction financed by HMRDC Line capacity to be used primarily for goods services Assured passenger services to the extent operated on the meter gauge. Running & operating costs of passenger services to be borne by Railways Cost of freight operations and maintenance of the line to be met by HMRDC. Revenues to Company to accrue from freight only Revenues from passenger trains to accrue to IR 8

Capital Structure Authorized share capital `. 125 Cr. (Equity share of Rs.10/- each) Paid up capital `. 112 Cr. The shareholding pattern is as follows  Government of Karnataka `.28 Cr  Mysore Sales International Ltd. `. 7 Cr40%  Vishveshwarya Ind Trade Center `. 10 Cr  Ministry of Railways `. 45 Cr40%  New Mangalore Port Trust `. 10 Cr 9%  Mineral Enterprises Limited `. 10 Cr 9%  K-RIDE `. 2 Cr 2% 9

O & M Agreement Under the Operations and Maintenance Agreement HMRDC has contracted with SWR for operation of goods train services on the line and its maintenance till the termination of the concession period. Construction Agreement Under the Construction Agreement signed between HMRDC and South Western Railway (SWR) the later has been appointed as the Engineering, Procurement and Construction (EPC) Agency for the line and entrusted with the construction work. 10

Project Financing Initial Project Cost `. 293 cr Construction Cost `. 275 cr RMV Equipment `. 4 cr Pre-operative exp & IDC `. 14 cr Revised Project Cost `. 367 cr Construction Cost `. 349 cr RMV Equipment `. 4 cr Pre-operative exp & IDC `. 14 cr Funding through Subordinate debt from IR `. 141 cr Equity `. 112 cr Term loans from banks `. 90 cr Revised construction cost is under examination for mutual acceptance. 11

Concession Agreement Under the Concession Agreement, the Ministry of Railways has granted HMRDC a concession for 32 years during which the company would convert the MG line between Hassan and Mangalore into a BG line and thereafter undertake its operation and maintenance during the concession period. To enable construction of the new line, the existing assets including land, station buildings, formation, bridges etc. (assets forming part of the rail network and necessary for gauge conversion) have been leased to the company. 12

Construction of the line Detailed estimate sanctioned by Rly Board in Dec 2002 forms the basis of the construction agreement. The 183 Km long MG line from Hassan to Kankanadi has been converted to BG. Four new crossing stations were planned of which three have been commissioned so far. Arebetta station is yet to be opened. The cost of construction as per the Construction Agreement is ` Cr. In addition, HMRDC has also paid for rail mounted vehicles to be used for inspection & maintenance of the line. The completion cost of the project is presently being worked out. It is expected to be around `. 340 cr. 13

Operations & Maintenance of the line The Operations and Maintenance of the line from Commercial Operations Date (COD) i.e. 5 th May 2006 is being done by SWR under the terms of the O & M agreement. 100% inflation of distance is allowed for the Ghat section of 55Km between SKLR-SBHR, thus making chargeable distance to Km from the actual distance of KM between HAS-MAQ (Rate circular No. 32 of 2006) Freight due to HMRDC from traffic carried on the line is calculated as per the inter zonal railway rules of apportionment. O & M ( Fixed & Variable) costs payable by HMRDC are calculated on the basis of the formula prescribed in the O & M agreement. Fixed costs covering cost of manpower, cost of consumables etc. are payable irrespective of the traffic moved. Variable costs including fuel, cost of crew, loco and wagon usage etc. vary according to the tonnage carried on the line. Apportioned freight minus the O&M costs constitutes HMRDC’s share of revenue. 14

Traffic Forecast The Hassan Mangalore line is expected to carry up to seven million tonnes of freight per annum that includes Towards Mangalore Area: Export iron ore to Port from Chitradurga – Tumkur and Hospet –Bellary sectors. Presently Banned in Karnataka. Iron ore for KIOCL pellet plant at Mangalore – Presently not moving in Karnataka Cement, Food grains and other general goods to Mangalore/ South Kerala area From Mangalore Area: Imported Coal/ Iron ore Fertilizer imports Limestone, Iron Ore Pellet – Presently not moving from Last 2 years. Fertilizer from MCF Mangalore, Ernakulum Kerala area, Trombay Bombay area. Food Grains from North India to Karnataka and Kerala. POL and LPG from Mangalore Refinery, Thokkur to Bangalore. 15

Salient Physical Features of Hassan - Mangalore Section Sl.No. Section Elevation (MSL)DistanceGradient 1Hassan – 900m 42 kms. 1 in 100 plateau 2 Sakleshpur – 967m 3 55 kms. 1 in 50 Ghat 4Subramanya Rd. – 113m 5 86 kms.1 in 100 plain 6Mangalore – 9.5m 16

A. Rails Hassan to Mangalore – 183 Kms Main line track class I - 52 Kg rails Loop line class II - 52 Kg rails B. Sleepers Hassan to Sakleshpur60 Kg PSC sleepers - M+ 4 density Sakleshpur to Mangalore 60 Kg PSC sleepers - M+ 7 density Loop lines52 Kg PSC sleepers - M+ 4 density C. Fittings Class - I fittings - ERC Clips, GR pads, metal liners in mid section and GFN liners in yards D. Ballast mm cushion. 17

3. Bridges - Total Major Bridges – 91 Minor Bridges – 549 Road over bridges – 16 Road under bridges – 12 FOB – 2 4. Tunnels - Total Nos. 57 Total length kms. Longest tunnel mts No Level Crossings - Total - 65 Manned – 31 Unmanned Curves - Total – Nos to Nos 7. Catch Sidings Donigal station – Shrivagilu Yedakumeri - Proposed 8. Slip Sidings Donigal, Shrivagulu 18

Details of Block Stations and Halts in Hassan-Mangalore S.NoName of StationJurisdictionLocation at (kms)Inter Dist 1Hassan (HAS)S W R Alur (ALUR) HMRDCHMRDC Balupete (BLLT) Sakleshpur (SKLR) Donigal (DOGL) Kadagaravalli (KVGL) Yedakumeri (YDK) Arrebetta (TO BE COMMISSIONED) Shrivagulu (SVGL) Subramanya Road (SBHR) Bajakare (BAJE) – Halt Kodimbala (KDBA) – Halt Yedamangala (YDM) Kaniuri (KNYR) – Halt Narimogaru (NRJ) Kabakaputtur (KBPR) Neralekatte (NEHL) Kalladaka (KLKD) – Halt Bantwal (BNTL) Faringapeta (FRG) – Halt Padil (PDL) S R Mangalore Jn

Line Capacity  The maximum number of trains that can be run in a day is Line Capacity which is decided by the time required to complete the journey by the slowest moving train in a critical block section.  The maximum permissible speed for all trains in the section between SBHR-SKLR is 30 KMPH  The Critical Block Section of HMRDC Line is DOGL-SBHR in the ghat section of SKLR-SBHR section, with the distance KM the running time for DOGL-SBHR section is 95 minutes (47.7/30*60)  All the down trains are required to stop and start at reception signal to check the brake power  There are three stations, each requires 2 mins i.e total 6 mins  Total time required for the journey is 100 min (95+5 min) (since Up Trains not required to stop)  The total number of trains that can be run (Line capacity) =14.40*30=432 trains (1440/100)  Total number of passenger trains in a month that are running in the section is 85 i.e 1 daily train and 3 days a week [60+((6/7)*30=25)]=85  Total number of paths available in a month for all other services is 347 (432-85) i.s 11.57/day  Time required for maintenance works is provided to the extent of 1 train paths (100Mins)  Total number of paths available for goods train/ MT/LE/CLE in a day  Total number of paths available for goods train/ MT/LE/CLE in a month 317 (10.57*30)  Total Trains per year=317*12=3804  Empty Train/CLE/LE/MT movement around 35% i.e 1331  Balance is considered as loaded trains i.e 65% of the capacity utilization i.e =2473 per year  Running of loaded trains is 65% of the capacity i.e 206 trains (2473/12) in a month.  Average load per train is 2950T  Total traffic that can be handled per annum 2473*2950=7.30MT on HMRDC Section 20

Operational Performance 18 Particulars (05/06- 03/07) Carried Tonnage (MT) Earnings O&M costs * (Inclusive of Defrd OH ) Income from Operations Deferred OH `. - Crores * Note: O&M Costs not yet finalized by SWR for the years up to the year

Commodity wise Earnings (I) 19 Commodity Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Iron Ore Export Domestic Pellets Total % 2% % % 5% % % 1% % % 3% 1% 61% Limestone % % % % Cement % % % % Coal % % % % F Grains/ Fertilizer % % % % LPG/POL % % % % Gypsum/ Others `. - Crores

Commodity wise Earnings (II) 19-A Commodity Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Carr Tonn (MT) Reve% to tot Rev Iron Ore Export Domestic Pellets Total % 27% % % 15% 0% 15% % % Limestone %0.00 0%0.00 0% % Cement % % % % Coal % % % % F Grains/ Fertilizer % % % % LPG/POL % % % % Gypsum0.00 0% % % % Others % % % % `. - Crores

Stock wise/Train Load Earnings Type of Wagon/ Commodity Total No of Trains Total Load (Million T) Total Revenue (Cr) Load per Train (Tonnes) Revenue per Train (In Lakhs) BOXN – Iron Ore Gypsum Coal BCN – Cement * Fert/ Food Gr BTPG - LPG BTPN - POL BLC/BFKN – Cont

Components of Fixed & Variable Costs Fixed CostsVariable Costs Man PowerCost of Fuel Other than Man powerCost of Crew Direct Supervision ChargesCost of Loco & Wagon Usage Indirect Over HeadsCost of Running Repairs of Wagons Misc.Documentation Compensation Claim Indirect Over Heads 21

Detailed Note on Components of Fixed Cost 22 Fixed costs: Manpower costs : The actual salary paid to the staff deployed on the section except crew. Other than Manpower cost : The cost of material/ stores required to keep the line fit for operations including contractors agreement entered for the same. Direct supervision charges : The cost not covered in the Manpower cost directly. Indirect Overheads : The costs which cannot be allocated to any known heads such as Medical, RPF, Pension etc. and paid on a percentage basis as per Yearly Summary of End Results published by Railway Board. This charge is deferred for ten years from the date of CoD. Misc. : E-460 Special Repair Breaches on actuals and B-700 Special Repair Accidents calculated on prorata GTKM basis.

Details of Man Power Cost since April 2009 Till March 2014 Month Jan DA –22% July DA –27% Jan DA–35% July DA–45% Jan DA–51% July DA –58% Jan DA-65% July DA –72% Jan DA-80% Jul DA –90% April May June July August September October November December January February March Total

Note on Manpower Cost 24  Revised pay scales implemented and also 40% of the arrears w.e.f was released. Rates of National Holiday, OT, Night Duty allowance etc also increased due to Pay Commission.  % of the PC arrears was released.  Though increase in DA is announced in January and June but the amount is released in April and September respectively.  Bonus is released in October.  Annual increment is in July.  Staff strength in Engineering Department has been increased by 109 in June’12 hence total strength in the section as on is 577 which is less by 78 with the agreement. S.NoName of the Department Staff as per Agreement As per Actual May 2012 Effective Strength from June’12 Actual Strength June’12 Strength as on June’13 Strength as on June’14 1S&T Accounts Mechanical Engineering Electrical Operating Total

Detailed Note on Components of Variable Cost 25 Variable Cost 1)Cost of fuel : (GTKM/1000)x(SFC)x(Rate per litre) 2)Cost of crew : GTKM basis (expenses of (MYS div/GTKM of MYS div) x (SPV GTKM) 3)Loco and wagon usage : (Time spent by locos in hrs and wagons in days) x (respective rates notified by RB from time to time) 4)Running repairs of wagons : Pro-rata basis of (Total zonal expenses of Running Repairs)x (SPV Wagon days)/(Zonal Wagon Days) 5)Documentation : Stationery cost 6)Compensation claims: claim settlement and prevention organization (K210) and other claims under K230, K240 and K260 7)Indirect Overhead : The costs which cannot be allocated to any known heads such as Medical, RPF, Pension etc. and paid on a percentage basis as per Yearly Summary of End Results published by Railway Board. This charge is deferred for ten years from the date of Commercial operations. i.e. 05/05/2006. NOTE: GTKM – Gross Tonne Kilometer [Gross Load of the Train (both Load+Empty)+Loco Weight]

Review of O&M Costs 26 Particulars Carried Tonnage (MT) Fixed Costs (FC – `.- Cr) FC/Tonne (`.) FC/Tonne/Km (`.) Variable Cost (VC – `. - Cr) VC/Tonne (`.) VC/Tonne/Km (`.)

Income and Expenditure 27 Income: Particulars From Freight Operations Others Total Expenses: O&M Railway Fixed Costs Variable Costs Indirect OH – FC Indirect OH – VC Maintenance Exp Expenses:Administration OfficeFinancial Expenses Depreciation Total P B I T(14.28) (12.78) Tax Paid MAT Cr. (current/Previous Yr) --- (14.27) Deferred Tax--- (25.55) P A T(14.28) (12.78) `. - Crores

Earnings Particulars Tonnage (Million Tonne) Gross Earnings (`. Crores) Gross Earnings/Ton/ KM (`.) O&M Cost (`. Crores) O&M Cost/Ton/ Km- (`.) Net Earnings (`. Crores) Net Earnings/Ton/ Km (`.) Profit/ Loss (`. Crores) (Inc. of all Expenses) (14.28) (12.78) Profit/Loss/ Ton/ Km (`.)(0.49) (0.21)

Performance of the Company 29 Particulars Total Income Total Expenses P B I T(14.28) (12.78) P A T(14.28) (12.78) E P S (Rs.)(1.28) (1.13) ` - Crores

30

Fixed Assets 31 Particula rs GAVNAVGAVNAVGAVNAVGAVNAVGAVNAVGAVNAVGAVNAVGAVNAV Railways Bridges Formatio n P Way Station & Building Plant & Machiner y Total Office G Total ` - Crores GAV – Gross Asset ValueNAV – Net Asset Value

Capital Structure 32 Particulars Share Capital Paid Up Reserve & Surplus (Cumulative) Secured Loans Canara Bank SBH Unsecured Loans Sub debt from S W R Deferred Indirect Over Heads of SWR ` - Crores

Section Staff Position in HMRDC S.NoDepartmentNo of Staff as per Agmt No. of Staff on Roll New Staff Recruited in Engg (June’12) No of staff on Roll as per SWR As on No of staff on Roll as per SWR As on Mechanical (SKLR-SBHR) Electrical (TLD) Traffic (SKLR-BNTL) S&T (SKLR-BNTL) SE/P-Way (HAS-SKLR) at HAS SE/P-Way (SKLR-SBHR) at SKLR ADEN (SKLR) + 1 MYS BRI (SKLR)7766 9SE/Works (SKLR) at SKLR SE/P-Way (KBPR) Accounts33333 Total SWR has recruited New Staff for Engg in the month of May 2012 and effective from June

Information and Communication Technology (ICT) 34 The Company has implemented need based ICT.  For Accounts, Tally software is used.  For Commercial & Operational transaction, FOIS & an in house developed program (backend/data base in MYSQL and Frontend in Dot Net) “FAITH” Freight Accounting Information Tool of HMRDC is in place.  The website of the Company is a dynamic one and all relevant information are made available therein.  Regular back-up of data is done in an external Hard Drive Disk.  All the Personal Computers are connected through LAN (Local Area Network) and antivirus software loaded.

INSURANCE PROJECT LENGTH COVERED : 97 Kms out of 183 Kms from (SKLR to KBPR) ASSETS INSURED : Permanent way, Station Buildings, Signaling, and Telecom, Mechanical & Electrical Equipments RISKS COVERED: Force Majeure occurrence such as fire, root, flood, breaches, lightning, earthquake and other natural disaster – mainly on account of landslides/ rockslides during monsoon. LOSSES COVERED: i) Restoration cost of tracks and assets damaged ii) Loss of Profit/ Revenue on account of stoppage of operation on account of Force majeure events. POLICY PERIOD : 13 th January 2014 to 12 th January 2015 PREMIUM PAID : 2008 ` Lakhs 2009 ` Lakhs 2010 ` Lakhs 2011 ` Lakhs 2012 ` Lakhs 2013 ` Lakhs 2014 ` Lakhs CLAIMS SETTLED : 2008 : Restoration Cost : ` 61 Lakhs Loss of Profit : ` 163 Lakhs (Received on ) 2009 : Restoration Cost : ` Lakhs Loss of profit : ` Lakhs (Received on ) 2012 Restoration Cost : ` Lakhs (Received on ) Company has put up the Claim for Rs Lakhs for the year to the National Insurance Company as their were Landslides in the months of July’13 and August’13. 35

Income Tax Holiday and Payment of MAT  INCOME TAX HOLIDAY : Nature of exemption : Eligibility U/s 80IA being Infrastructure facility Quantum of Exemption : 100% of Profit/ Income of the Company Period of Exemption : For 10 Consecutive years from the Initial year Exemption Availed : From FY Exemption Available : upto FY 2016 – 17  PAYMENT OF MAT : The Company is required to Pay minimum Alternative Tax (MAT) on Book Profits u/s 115JB of Income Tax Act. The Book Profit and MAT/Income Tax paid are : FIN YEARBook Profit Rate% including Surcharge ` In Crores Amt of and Education Cess MAT/Income Tax Paid (10%+10%+3%) (10%+10%+3%) (15%+10%+3%) (18%+7.5%+3%) (12.78) (18.5%+5%+3%) (30%+5%+3%) (30%+10%+3%)

Looking to Future 37 SWOT Analysis : Strengths :  The Only Railway Line passing through Western Ghats connecting the major port of Karnataka with Hinterland.  Has got Line Capacity to transport 7 Million Tonnes of Traffic per annum.  Stabilized Rail Link.  Entire Loan of `. 90 Cr. availed from Nationalized Banks Completely Amortized within 3 years of CoD

Looking to Future 38 Weaknesses :  Dependence on a single Commodity (Iron-Ore/Export) which is the Cash Cow.  Oligopolistic customers.  Capacity and Operational constraints due to steep gradient ( 1 in 50) and more number of 8 degree Curves. Multiple locos with AEBs used for hauling up Trains Empty running of Locos and Rakes Speed restrictions – 30 KMPH in Ghat Section. Detention due to a variety of reasons.  Outstanding sub-debt ( ` Cr) and deferred OH ( ` Cr) along with interest, if any.  The Cash Reserves of ` 235 Cr represent only DRF.

Looking to Future 39 Opportunities :  Steady Traffic with KIOCL expansion plans (Iron Ore Domestic)  Iron-Ore for Export market may commence upon lifting the ban.  Import of high grade non-coking Coal for proposed Steel Plants and Coal for Power Plants, which will be moved from NMPT through Hassan Mangalore Rail Line.  Diversification into development of Property Time Shares (with the Land available) for heritage Tours and Trek to boost non-traditional income.  Going for “Doubling” of the Line, avoiding Ghat Section (118 Kms as against 55Kms of Ghat Section) with minimum impact on Environment.

Looking to Future 40 Threats :  Higher Expenditure on Maintenance costs, Protection works and for retaining walls etc to prevent landslides.  Huge Capital Expenditure for strengthening of bridges to permit running of 25T Axle Load Trains.  Dwindling traffic movements.  Premature replacement of Assets due to denudation.

41