AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Africa Region Procurement Reform Observatory AFTQK PROCUREMENT GROUP.
______________________
1 Joint WTO/WB Regional Workshop on Procurement Reforms Overview of Procurement Reforms in Africa Bernard Abeillé Regional Procurement Adviser at the.
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 9: Technical Cooperation and Capacity Building Capacity Building in Government.
Environment & national PRSs - directions and dilemmas EPD Seminar Series May 2002.
APPROACHES TO PUBLIC PROCUREMENT REFORM AND CAPACITY BUILDING
Workshop on the Strengthened Approach to Supporting PFM Reform PFM Performance Measurement Framework And Procurement Pamela Bigart World Bank.
World Bank Financial Management Sector September 2010.
World Health Organization
First Evaluation of Good Governance for Medicines Programme Brief Summary of Findings.
World Bank’s new methodology In Country procurement assessment World Bank’s Methodology for Procurement laws: back to country systems?
Introduction to Public Procurement: Basic Principles and Concepts
MEANS TO AN END: the OECD Approach for Effective Implementation of Public Procurement Systems Getting really strategic Paulo Magina Head of the Public.
BANGLADESH EXPERIENCE PUBLIC FINANCIAL MANAGEMENT AND PR OCUREMENT A presentation for Concurrent Session on Public Financial Management and Procurement.
Capacity Building Program for EAs/IAs on Successful Project Design and Implementation November 2013  ADB Headquarters, Manila, Philippines Improving.
ADB Support of Public Procurement Reform Presented By: Amr J. Qari, Procurement Specialist Seventh Regional Public Procurement Forum, May , 2011.
Simple, Effective, Transparent Regulation: Best Practices in OECD countries Cesar Cordova-Novion Deputy Head of Programme Regulatory Reform, OECD.
Poverty Reduction Strategy Papers (PRSPs) Overview and Next Steps Expert Group Meeting on MDGs and PRSPs Egypt, December 2004.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
LOCAL DEVELOPMENT PILOT PROJECT (LDP) The World Bank and Bosnia and Herzegovina.
Social Development Department The World Bank Poverty and Social Impact Analysis: Is it Working in the World Bank? February 8, 2008 United Nations Commission.
Enabling Environments for Successful Contract Farming Carlos Arthur B. da Silva, Ph.D. Rural Infrastructure and Agro-Industries Division FAO - Rome.
Piloting the Use of Country Systems in World Bank-supported operations Working for a world free of poverty.
1 Fostering Aid Effectiveness: Program-Based Approaches and What it means for Procurement? Presented by Jocelyn Comtois May International Conference.
Investment Lending Reform: M ODERNIZING AND C ONSOLIDATING O PERATIONAL P OLICIES AND P ROCEDURES.
COOPERATION AMONG EVALUATION UNITS IN MULTILATERAL IFIs Gregory K. Ingram Chair, Evaluation Cooperation Group Marrakech – February, 2004.
Ethiopian SACCO Supervision & Regulation
Strengthening Constituencies for Effective Competition Regimes in Select West African Countries (7Up4 Project) PROJECT OVERVIEW Presentation at NRG-I Meeting.
1 AN OVERVIEW OF POLICY AND LEGISLATIVE FRAMEWORK GOVERNING PUBLIC PROCUREMENT By Zitto Z. Kabwe, MP Chairperson, PAC - TANZANIA SADCOPAC/EAAPAC TRAINING.
Association of Energy Regulators for Eastern and Southern Africa EgyptEra Electricity Market and Regulators Status in COMESA General Assembly Meeting Lusaka,
IFPRI INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE IFPRI Capacity for Food Policy Research and Analysis Approaches and Lessons Learned Suresh Babu.
WHERE JUDICIAL REFORMS FITS THE BANK’S AGENDA LCR PERSPECTIVE David F. Varela, LCCVE.
Ray Holland, Manager EUEI/PDF. A flexible instrument to facilitate the dialogue between: –The European Union and partner countries, –Stakeholders at national.
Objectives and Strategies of RRSF The RRSF has been prepared with an overall objective and four specific objectives to overcome the identified problems.
1 EAST AFRICAN PUBLIC PROCUREMENT – FORUM JUNE 2008 – Procurement Context TOPIC Context of Public Procurement in East Africa and Objectives of this Forum.
WHO-Technical Briefing Seminar | October-November 2012 Dr Cécile Macé 1 |1 | Good Governance for Medicines Programme Dr Cécile Macé EMP/MPC.
OECD RECOMMENDATION on PUBLIC PROCUREMENT Implementing strategic procurement Matthieu CAHEN Policy Analyst Public Sector Integrity Division Kiev – 27 May.
PROCUREMENT IN PRSCs – Case of Uganda March 24-28, 2008 Playing a Key Role in achieving the Development Results Playing a Key Role in achieving the Development.
IFMIS RELATED ISSUES in AFRICAN COUNTRIES. List of Anglophone countries currently developing, implementing IFMIS, and/or those in pipeline. Uganda, Tanzania,
Skills Development in Sub-Saharan Africa By Richard K. Johanson And Arvil V. Adams.
A short introduction to the Strengthened Approach to supporting PFM reforms.
Governance Indicators at AfDB Stephen Bahemuka May, 2012 African Development Bank.
The World Bank PREM Public Sector Governance Page 1 Follow-up Actions by Donors and Countries ~ The case of PEFA ~ Session: “What Governments are Doing.
1 Use of Country Procurement System (UCS) HIGH LEVEL PROCUREMENT FORUM V. S. (Krish) Krishnakumar Regional Procurement Manager Africa Region - The World.
Procurement & Fiduciary services Department Development Bank African The 1 THE HIGH LEVEL FORUM ON PUBLIC PROCUREMENT REFORMS IN AFRICA Progress, Challenges,
GROUP 3 In the group, countries represented included Malawi, Ghana, Rwanda, South Africa, Tanzania, Uganda and Zambia.
April Why a New Instrument? Change in client demand: Clients want Bank support for government’s own programs and increased focus on results. This.
SEL1 Implementing an assessment – the Process Session IV Lusaka, January M. Gonzales de Asis and F. Recanatini, WBI
The MESICIC Experience & Civil Society Participation.
1 Benefits and Challenges of the Regulatory Reforms in Georgia Zaal Lomtadze, Deputy Minister of Environment 11 October 2007, Belgrade.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Baseline Indicators and Performance Measurement Framework for Procurement Regional Workshop on Procurement Capacity Development Lima, Peru April.
Upcoming Work on the Enabling Environment for Civic Engagement Initiative Jeff Thindwa Participation and Civic Engagement Group Social Development Department,
IL Reform Risk-Based Approach & GAC Agenda Dec
PRESENTATION OF MONTENEGRO
Country Level Programs
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
European External Investment Plan
Workshop on the Strengthened Approach to Supporting PFM Reform
Asha Ayoung Lead Procurement Specialist, OPCPR
FIGHTING CORRUPTION AND POVERTY: ARE WE GETTING IT RIGHT?
ZAMBIA PEFA EXPERIENCE
Ritva Reinikka, DECRG May 24, 2001
Business in Partnership Against Corruption
Lessons Learned and Recommendations
April 2011.
Review of Activities for Phase II of African Project on 2008 SNA
Seventh Regional Public Procurement Forum, May , 2011
Presentation transcript:

AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty

Overview  Background  Methodology  Outcomes Working for a world free of poverty

Background  Government progress with action plans is summarized in this AFR Observatory, indicating comparative progress for 38 countries with procurement reform activities;  Action plans and the reform programs arising from completed fiduciary assessment were integrated in Poverty Reduction Support Credits (PRSCs) and other lending instruments as part of the triggers for meeting the key fiduciary objectives and were carefully monitored;  The improvement of national procurement systems were monitored and measured on a quarterly basis, maintaining a constant pressure and dialogue on getting progress;  The AFR Observatory is also an input for Country Assistance Strategy (CAS) and PRSC preparation and a source of information for the Country Management Units; Working for a world free of poverty

Methodology Other relevant information has been provided: Donors’ involvement: IDA and other Donor support initiatives have been instrumental in promoting public procurement reforms in these countries; Capacity building initiatives: Governments are carrying out capacity building programs tailored to the needs of each country, which usually include disseminating and publicizing procurement laws to various stakeholders; Country Procurement Risk rating: actual performance of procurement system has been assessed based on Africa Procurement Team knowledge, which has allowed determining the procurement risk associated with performance Working for a world free of poverty

Outcomes  Based on all the collected information and knowledge, the assessment has been divided into the three following categories: Advanced Stage of the Reform. Criteria for the Maturity Stage are actively being pursued but have not yet been fully achieved. Some criteria (such as Independent Fiduciary Control and effective Anti- Corruption measures) still need further improvement;  Average Progress. The Reform Process is underway but sustained action by both the Government and the Bank is needed to maintain momentum or no actions has been undertaken since the last update;  Initial Progress in the Implementation of the Reform. Initial measures of procurement reform are being taken but progress is still weak. Pro-active Bank and other donors involvement is needed to get the reform process under way. Working for a world free of poverty AFR Countries outcomes Uganda

Outcomes by countries 1 Working for a world free of poverty  Out of 13 selected anglophone countries 1, the main outcomes are:  Pillar I: –77% have adopted a modern procurement law; –69% have news SBDs, manuals … ;  Pillar II: –62% have set up a regulatory body; –38% have integrated procurement into the budget chain; –46% have developed a capacity building strategy.  Pillar III: –62% have developed procurement training modules; –23% considered the private sector is efficient and that there are no major constraints in the bidding process; –46% have included dispute resolution mechanisms  Pillar IV: –23% considered that Audit and control mechanisms exist; –38% considered that appeal mechanisms through an independent body; –23% considered that access to information exists; –15% have developed an E-procurement framework; –69% have included anti-corruption and ethics measures. 1 Eritrea, Ethiopia, Ghana, Kenya, Lesotho, Liberia, Malawi, Nigeria, SL, Sudan,Tanzania, Uganda and Zambia

Lessons learned Working for a world free of poverty  Most of the selected countries have now a sound legal and regulatory and framework;  Building institutions is the next critical step;  Accountabilty, enforcement of sanctions, and information sharing in also critical to have a transparent, economic, efficient and competitive national procurement system.  In summary, the objective to be achieved is to have acceptable national procurement systems (which include not only procedures, regulations and institutions but also well functioning institutions and capacity to implement.