PGDTF Update to ROS November 5, 2015 Michael Juricek PGDTF Chairman 111/5/2015 ROS Meeting.

Slides:



Advertisements
Similar presentations
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
Advertisements

NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
Presented to PGDTF February 11, 2015
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
1. RCC Action Plan Item: Financial Protection for Produce Sellers Webinar presentation December 2013 Agriculture and Agri-Food Canada (AAFC)
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Homeland Security Conference Symposium on Homeland Security & Defense Christopher Newport University May 18,
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
October 27, 2005 Contra Costa Operational Area Homeland Security Strategic and Tactical Planning and Hazardous Materials Response Assessment Project Overview.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Internal Audit of Procurement Organisation Review TIMELINE TOPIC GROUP 17 th February 2009.
1 THE NATIONAL SPACE WEATHER PROGRAM Sixth Symposium on Space Weather Session 1: Space Weather Agency Updates AMS Annual Meeting January 12, 2009 Mr. Samuel.
1 QUALTITY ASSURANCE The Ministry of higher education in Syria THE ROUNDTABLE MEETING OF QUALTITY ASSURANCE AGENCIES OF THE ORGANIZATION OF ISAMIC CONFERENCE.
Department of Finance BUREAU OF LOCAL GOVERNMENT FINANCE
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Market Operations Standing Committee of the IMO Market Operations Standing Committee September 22, 2003.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Standards Review Subcommittee Update August 17, 2010.
Statistics related to the Excessive Deficit Procedure (EDP) - Main facts and recent relevant events Luca Ascoli Head of Unit C3 Public Finance.
Cultural Resources Subcommittee Update to Coordination Group John Knoerl, Chair Program Manager, Cultural Resource GIS Facility, National Park Service.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Material for 10/23/2015 PGDTF Meeting Michael Juricek.
NCHER Legislative Conference Washington, DC Federal Update February 2, 2016 Annmarie Weisman, Office of Postsecondary Education.
1 Briefing on the Draft Call for Projects and Schedule for the Air Quality Conformity Assessment for the 2011 CLRP and FY TIP Technical Committee.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Data Requirements For Calculating Geomagnetically Induced Currents ROS Meeting March 3, 2016 Michael Juricek PGDTF Chairman 1.
Data Requirements For Calculating Geomagnetically Induced Currents PGDTF Meeting March 21, 2016 Michael Juricek PGDTF Chairman 1.
U.S. National Space Weather Strategy Coordination Group for Meteorological Satellites 5 June 2016 Bill Murtagh Assistant Director for Space Weather Office.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
The Tripartite Working Arrangement (TWA) of EFCA, EMSA and Frontex
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
Setting Performance Expectations
Agenda Control systems defined
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
Office of Nuclear Materials Safety and Safeguards
Merrill Brimhall – Engineer, Staff
College of Alameda Integrated Planning and Budgeting Process
Rates & Regulatory Updates
LLW Forum Meeting October 17, 2017 Alexandria, Virginia
RPPP Policy and Procedures Update
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Workshop Session 1: Overview
Reliability Standards Development Plan
2019 Local School District Charter Application Process
Workshop Session 1: Overview
CIPC Executive Committee Update
Strategic Planning Timeline Overview
Crisis Response Task Force (CRTF) Proposal
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
2015 January February March April May June July August September
DSC ChMC Switching Programme Update 10th July 2019
Presentation transcript:

PGDTF Update to ROS November 5, 2015 Michael Juricek PGDTF Chairman 111/5/2015 ROS Meeting

Regulatory Activity On January 21, 2015, NERC filed a Petition for Approval of TPL with FERC. On February 26, 2015, Foundation for Resilient Societies, Inc. Initiated a Level 2 Appeal which NERC is Processing. On May 14, 2015, FERC Issued NOPR Proposing to Approve NERC TPL and Directing NERC as Follows. Modify the Benchmark GMD Event Definition and Transformer Thermal Impact Study Requirements. Require Installation of Monitoring Equipment. Establish Specific Deadlines for the Development of Corrective Action Plans and the Completion of Plan Activities. Study GMD Topics and Make Informational Filings to FERC. Mike Juricek – 11/5/2015 ROS Meeting2

Regulatory Activity Comments on FERC NOPR Due Before July 27,2015. Numerous Comments Filed. Comments Ranged from Adopt as Filed to Start Over. On August 17, 2015, NERC Notified the Foundation for Resilient Societies, Inc. the Level 2 Appeal Panel Had Decided the Foundation Was Afforded Fair and Equitable Treatment During the Development of the Proposed Standard. FERC Extended Deadline for Comments Until September 10, More Comments Were Filed. No Published Deadline For Completion of FERC Review. Mike Juricek – 11/5/2015 ROS Meeting3

National Space Weather Strategy Space Weather Operations, Research and Mitigation (SWORM) Task Force was Chartered in November 2014 to Develop a National Strategy and a National Action Plan to Enhance National Preparedness for Space-Weather Events. A Press Briefing was held on October 29, 2015 to Release the Strategy and Action Plan with the Following Strategic Goals. 1.Establish Benchmarks for Space-Weather Events 2.Enhance Response and Recovery Capabilities 3.Improve Protection and Mitigation Efforts 4.Improve Assessment, Modeling and Prediction of Impacts on Critical Infrastructure 5.Improve Space-Weather Services through Advancing Understanding and Forecasting 6.Increase International Cooperation Action Plan Details the Activities, Outcomes and Timelines that Will be Undertaken by Federal Departments and Agencies for the Nation to Make Progress Toward the Strategy’s Goals. Mike Juricek – 11/5/2015 ROS Meeting4

Recent PGDTF Activity PGDTF Met on October 23, 2015 Majority of Meeting Was Dedicated to Discussion of the Substation and Transformer Data Needed for the Model. Model Recommendations Model Should Include 69 kV, 138 kV, and 345 kV Systems. Actual Data Should be Used for 138 kV and 345 kV Systems. Default Data Where Possible Can be Used for 69 kV Systems. Procedure Manual Development is Progressing. Mike Juricek – 11/5/2015 ROS Meeting5

Next Activities for PGDTF Continue Development of Procedure Manual. Develop Plan for Documenting GMD Planning Activities. Create Model for GMD Vulnerability Assessment. Standard Requires Model be Completed 18 Months After Approval of Standard. Mike Juricek – 11/5/2015 ROS Meeting6

Questions and Answers 7Mike Juricek – 11/5/2015 ROS Meeting