07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 21st January & night
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Sunday
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
31/3/2010 Difficult day… but at the end stable beams.
Presentation transcript:

07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the storage of the reference for the orbit feedback. 14:53 Stable beam #2479. (84 on 84 bunches): Initial luminosity: 3.2x10 32 cm -2 s -1 19:00-00:00 Fills (2480 and 2481) with 264 bunches/beam and bunch intensity close to 1.5x10 11 p/b. – Losses during the squeeze, Instability observed when going in collision, Issues with the skew scheme in LHCb 02:00 Fill #2482 STABLE BEAMS (1.3x10 11 p/b) and 264 bunches with initial luminosity of >0.9x10 33 cm -2 s :30 End of fill # :00 Again problem with OFB. Beams dumped at the end of the squeeze Fri 6/4

Parameters for the decay correction have been corrected (Mike+N. Aquilina). Chromaticity correction now OK at flat-bottom. Snap-back to be revisited Chromaticity decay correction (FIDEL)

Beam dump #2478 Vertical reference in the OFC zeroed in V-planes for both beams. Origin not known (expert analyzing). Occurred already on 21/3 at 00:59 at that time the reference was zeroed in the horizontal plane

Beam dump #2478 Orbit feedback suppressed the crossing angle in point 1 and 2 in approximately 170 s. BLM caught the event and dumped properly.

Test without beam of the squeeze sequence for the orbit feedback  no problem Following fill (#2479): closely monitoring of the status of the reference orbit Implementation of a SW interlock dumping the beam if a reference orbit with zero positions is loaded. Deployed and tested by Joerg. OK from rMPP to go to 264 bunches Problem occurred again at 8 AM this morning. Well caught by the SW interlock  expert called to diagnose the problem. Actions

Fill with N b ~1.5x10 11 p Low lifetime in the squeeze (~2m  *) for Beam 2. Observed trims by TFB HB2 in correspondence of the losses Fills with 264 bunches (2480)

Instability observed when going in collision (mostly vertical) but still far from head-on Fills with 264 bunches (2480)

Squeeze without tune feedback. Significant reduction of the losses. Adjust: – Reduction of chromaticity before going in collision (2 to 1 unit) – Increase of the damper gain in the vertical plane Still instability observed (mostly in the H-plane) Observed also head-on collisions during the “rotation” of the LHCb crossing plane Fills with 264 bunches (2481)

Found out that the sign of the horizontal separation in LHCb not correct  inverted sign Increased the gain of the transverse feedback Decreased bunch intensity to 1.3x10 11 p/b Finally managed to go in STABLE BEAMS#2482 with >0.9x10 33 cm -2 s -1 Need to verify whether dominant contribution is the reduced bunch intensity Fills with 264 bunches (2482)

Sudden losses observed in some bunches. Patterns being verified (colliding in IP8) Fills with 264 bunches (2482)

Application for luminosity optimization crashing and slowing down communication with FGC (acquisition of the PC currents)  CO+OP follow-up. For the moment minimize the number of applications open VdM scan application: cannot enter integration time  CO+OP follow- up Damper post-mortem (update required). Fixed display for injection oscillations (HB1) Orbit feedback loading zero reference Issues

Plan Investigations on the issue of the OFB Revisit LHCb crossing-angle tilt with small number of bunches to understand better the observed behaviour Stable beams 268 on 268 after having understood the various issues. No additional step in number of bunches today

2-3 fills and 4-6 hours with 48b, 84b, 264b and 624b (cycle validation) 3 fills and 20 hours with 840b, 1092b, 1380b (intensity/lumi related problems) MP checklists after 84b, 624b, 840b, 1092 bunches Regular MP checklists every two weeks when operating with 1380b Intensity ramp-up BunchesMax number of bunches injectedAlice 31Main-main 4812Main-satellite 8436Main-satellite 26436Main-satellite 62472Main-satellite Main-satellite Main-satellite Main-satellite