Robustdetails Feedback from Robust Details Technical Advisors.

Slides:



Advertisements
Similar presentations
Robustdetails Sean Smith. robustdetails Part E Robust Details Contents Robust Details: A&AC Process New RDs New Candidates A&AC.
Advertisements

HOUSING SOUND INSULATION & SUSTAINABLE DEVELOPMENT Dr Sean Smith Building Performance Centre Napier University Scottish Executive – Victoria Quay BPC.
The builders experience – mere compliance to enhanced performance Sustainable new homes and sound insulation conference Dave Poole.
Robustdetails robustdetails The Inspectorate aims to provide a high level of confidence in the robust details scheme. It is effectively.
Timber Framed Structures
Webinar: How to handle PRP appeals Presented by Heather Mitchell, employment lawyer at Browne Jacobson.
Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Walls Ron Gatepain constructionsite.
© Stroma Development Ltd 2013 | Version 1.1 Stroma – insulation Insulation Wall insulation Cavity wall insulation / Solid wall insulation Roof insulation.
5. HEAVY TIMBER FRAME CONSTRUCTION
Building Drawings and Symbols
Concrete Pre Cast Panel By Peter Spence ID:
Variation Management of Key Characteristics
 In Slovakia according to the climate, weather and geographic conditions, plus energy house cannot be built because the only source of energy can be used.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Standard Grade Graphic Communications
Reinforced Concrete Design II
Technical boclair academy Building Drawings.
Gary C Akers Technical Manager. * No wall clutter. * Reduced risk of clashes. * Aesthetically pleasing. * Site benefits. * Environmental benefits. * Cooling.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Summary of Energy Star Site Inspection July 11, 2007
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Btec Construction Unit 5 Methods of construction for domestic buildings.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Approximation of legislation to the internal market acquis An EU funded project managed by European Agency for Reconstruction Directive 89/106/EEC on Construction.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Neil Cooper Fire Safety Residential Implementing the Changes.
Unit 6/P6 – Timber Frame Construction Name ________________
Lecture 15 - Timber Wall Framing Example
 Effective height of walls  The effective height of a loadbearing wall is assessed by allowing for the relative stiffness of the elements of structure.
Harwood Building Control Approved Inspectors Ltd
This document provides guidance and a framework for carrying out inspections to follow up on concerns identified at previous inspections, including when.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Stretch Code Informational Session March 16, 2011.
New Revised Specification In Construction For 1st teaching September 2009 For moderation 2011.
Aviation Ground Handling Trailblazer Assessment Activity consultation Aviation ground operative Aviation ground specialist Aviation operations manager.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Learning Outcome Lesson Objective
Network Services: RM1045 Procurement Process
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Gérard Vittek Head of section “index of the cost of construction and rent” 25 th May of 2015 Toward Short Term Statistics Business in construction Costs.
Community Infrastructure Levy The fundamentals. Response to questions.
Introduction to CE marking for construction products and how this relates to national construction regulations Dr. Adam Pinney, CPR expert Adam Pinney.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
Refer to slide robustdetails robustdetails.
Ryan Thurston | Duncan McLennan
EV DOMESTIC CHARGING UNIT
Sustainable new homes and sound insulation 2006
American Institutes for Research
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Regulation and compliance with performance standards
Refer to slide robustdetails robustdetails.
Implementing and reviewing additional admissions assessments
Common Structural Forms
Prepared by Frank Cooney B.Arch MRIA
Temporary Works Co-ordination
Writing the Methods Section
MATERIALS AND CONSTRUCTION I
Building Drawings.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
GRADUATION INFORMATION MEETING
Role of the Internal Verifier
Presentation transcript:

robustdetails Feedback from Robust Details Technical Advisors

robustdetails Part E Robust Details Contents Introduction Hints & Tips Follow the Published Details Frequently asked questions

robustdetails Part E Robust Details Introduction Robust Details Technical Team Phil RogersSimon BloodworthColin Potter

robustdetails Separating wall or floor design assessed and approved by RDL Capable of consistently exceeding ADE performance standards Practical to construct on site Reasonably tolerant to workmanship Can be used as an alternative to PCT to comply with Requirement E1 Part E Robust Details Introduction What is a Part E robust detail?

robustdetails Part E Robust Details Introduction What is required to build a Robust Detail? 3rd Edition

robustdetails Part E Robust Details Hints & Tips Keep your Handbook up to date Since the first edition was published in May 2004 we have updated the Handbook times Handbooks purchased during the subscription year receive complimentary subscription for remaining period All subscribers receive new robust details when they are published six

robustdetails Check the combinations permitted in Table 3 Part E Robust Details Hints & Tips

robustdetails Check the combinations permitted in Table 3 Part E Robust Details Hints & Tips E-WM-9 is not for use in Flats or Apartments. It can not be used with any separating floor

robustdetails Register part of the development If you can’t register the whole development you may wish to consider which elements could follow the robust details Part E Robust Details Hints & Tips

robustdetails What if Robust Details can’t be used? On some sites it may not be possible to adopt RD’s Seek the advice of a suitably qualified acoustic consultant Check your requirements for acoustic testing with the Building Control Body noise-consultants.co.uk Part E Robust Details Hints & Tips

robustdetails Requirement E1 of Building Regulations, England and Wales only - Annex E covers the use of Robust Details Separating wall and floor structures between new, attached dwellings Not suitable for conversions Cannot be used on rooms for residential purposes Register plots before work starts Current Scope of the Scheme Part E Robust Details Hints & Tips

robustdetails Circulation Areas Plan View Part E Robust Details Hints & Tips RD Separating Wall External Flanking Wall Internal Flanking Wall

robustdetails Flat over Garage (FOG) Section Part E Robust Details Hints & Tips RD Separating Wall Separating Floor

robustdetails Deviations from the published details can result in the wall or floor failing acoustically Following the published details FAIL Investigations following failed performance monitoring tests show that the detail had been built incorrectly

robustdetails Ground floor junction Cavity masonry separating wall can not be built off continuous slab or raft foundation x Following the published details

robustdetails External (flanking) wall junction Following the published details x Separating wall must continue through the inner leaf of flanking wall and cavities maintained x

robustdetails Roof junction Following the published details Masonry walls Timber walls

robustdetails Wall Ties to separating walls Always ensure that you use wall ties with the appropriate for the separating wall Not all Part E wall ties are ‘Type A’ Following the published details Dynamic Stiffness

robustdetails External (flanking) wall junction Ensure correct inner leaf construction to external (flanking) walls is specified Following the published details Inner leaf (min 100mm) dense aggregate concrete block ( kg/m 3 )

robustdetails Screeded Separating floors Ensure floating screeds are isolated from wall, wall linings and skirtings x Following the published details Image produced by Dr Sean Smith, Aldona Gosnell and Lynne Robertson of Napier University

robustdetails Following the published details CORRECT IsoRubber installed ready for screed

robustdetails Help yourself! Following the published details Meeting all four relevant items on the checklist should help to ensure that the critical flanking details are followed correctly

robustdetails Timber separating floor with masonry supporting walls RD timber separating floors are intended for use in timber frame constructions ONLY Cannot be registered for use supported on masonry x Following the published details

robustdetails Following the published details Proprietary Floor Products Always ensure that you use the correct products Regupol E48nr Cellecta YELOfon HD10+nr Thermal Economics IsoRubbernr

robustdetails Proprietary Wall Products Always ensure that you use the correct products Following the published details Besblock “Star Performer” Isover RD35

robustdetails Setting out for timber walls Following the published details 50mm 50mm between studs E-WT-1 50mm PLUS Sheathing 50mm between panels E-WT-2

robustdetails THE SCHEME WORKS! Following the published details PASS 97% of constructions subjected to performance monitoring tests achieve the Part E1 requirements 97%

robustdetails Yes….. Can we use rigid insulation in Room-in-Roof situations? Frequently asked questions

robustdetails And what about the lining requirements? Frequently asked questions

robustdetails How do internal partitions connect to concrete floors? Frequently asked questions

robustdetails Can cavity insulation be fitted where the separating wall becomes an external element? Frequently asked questions Yes

robustdetails Where can we find suppliers of the acoustic systems indicated in the Handbook? Frequently asked questions Proprietary details have supplier details included on the relevant RD Checklist Builders merchants may have contact details Trade bodies, such as Proprietary Acoustic System Manufacturers (PASM), may also be able to help

robustdetails Are you a builder or architect commonly specifying a form of construction that doesn’t currently appear in the Robust Details Part E Handbook? Or, are you a manufacturer who has a separating wall or floor that has not yet been considered by Robust Details Ltd? If you can answer yes to either of these questions then we would be interested to hear from you. Candidate Robust Details

robustdetails Some builders already building to RD+ standards? Candidate Robust Details

robustdetails Technical Technical Line Other Business Line RDL Contact Details Part E Robust Details

robustdetails