Ppt on sf6 gas circuit breaker

220 KV GRID SUB STATION MORAK,KOTA SUBMITTED TO:- SUBMITTED BY:- SHRI VIKAS BHALLA LAKHAN SINGH ASSISTENT PROFESSOR ROLL NO.-12ECTEE029 ELECRTICAL DEPARTMENT.

necessary to maintain high air pressure in the air receiver. VACUUM CIRCUIT BREAKERS Vacuum circuit breakers are circuit breakers which are used to protect medium and high voltage circuits from dangerous electrical situations SULPAR HEXAFLUORIDE CIRCUIT BREAKER (SF6) Sulpherhexa fluoride (SF6) gas is used as the arc quenching medium. The SF6 is an electronegative gas and has a strong tendency to absorb free electrons. Circuit breakers have been developed for voltage 115KV to 230KV, power rating10/


Jeudi 7 juillet 2016 ELECTRICAL. 2 INTRODUCTION: SINGLE PHASE INDUCTION MOTOR: TYPES OF SINGLE PHASE INDUCTION MOTOR: 1)Shaded Pole(Very Small Motors)

way, so that the gap between the contacts can again withstand the voltage in the circuit.arc *) Different circuit breakers use vacuum, air, insulating gas, or oil as the medium in which the arc forms. Different techniques are used/ features. Based on the Interrupting medium the Circuit Breakers are classified as 1.Vacuum Circuit breaker 2.Air Circuit Breaker 3.SF6 Circuit Breaker Vacuum circuit breaker—With rated current up to 3000 A, these breakers interrupt the current by creating and extinguishing the/


Launch Pad 2.0 - Spring 2016 SE and Distributor team Panorama Schneider Electric Partners Business Unit- New Product Launches for SE & Distributor teams.

vacuum interrupters or SF6 interrupters in a gas (SF6) insulated tank ●Easy integration of switchgear through connections that are all solid insulated. No gas-handling on site ●Sealed system provides a zero maintenance MV circuit ●Insulation helps eliminate/ & Contacts Tools: ●Brochure, Specifications, (availability online) ●HVL/cb Metal-Enclosed Vacuum Circuit Breaker ●Suggested Specs: HVL/cb w/ Circuit Breaker Additional Resources can be found at our website: http://www.schneider-electric.us/en/product-/


1. 2 Presentation to KIB-TEK Northern Cyprus (16/11/2005)

17 Sabre VRN2a Product Description Outdoor non-extensible ring main unit with 2 ring switches and tee-off vacuum circuit breaker in an SF6 filled enclosure with pressure relief facility 18 SABRE VRN2a 19 SABRE Comparison Improved Features Smaller and lighter Easier /-RTU) GX-S or Sectionaliser (under development) 43 Rapier GX Load Break Switch - Features Ratings up to 38kV SF6 gas utilised as both arc quenching and insulating medium Equipped with 3 current transformers and 6 VCT’s in the bushings Stainless/


ABB © PTMV - 1 ABB Medium Voltage Outdoor Apparatus Portfolio July 2004 Brian Johnson.

Interrupting Current 12 kV630 – 1,600 A18.4 – 26.3 kA ABB © PTMV - 9 ABB Type OHB Live Tank Circuit Breaker SF6 Interruption Spring Operated Mechanism IEC Manufactured ABB, India Voltage Rated Continuous Current Interrupting Current 24 – 36 kV2,500 A31.5 kA/ HCEP Insulation Material Superior life – rated for 10,000 operations 2nd Generation Magnetic Actuators Environmentally friendly – no oil or gas ANSI C37.60+90 – 1997 Manufactured ABB, USA OVR Single Phase Automated Recloser ABB © PTMV - 13 ABB OVS/


نام:مصطفی نام خانوادگی:نادری نام استاد : موضوع: رله ریکلوزر.

turning off the ignition mechanism of classification is as follows: 1 - breaker oil tank or oil: Bulk Oil Circuit Breaker 2 - breaker Low oil or half oil: Minimum Oil Circuit Breaker 3 - SF6 gas breaker : Sulphur- hexafluoride (sf6) CB 4 - breaker with vacuum chambers: Vacuum Circuit Breaker 5 - Air Breaker: Air Circuit Breaker 6 - Breaker compressed air: Air Blast Circuit Breaker * Brykrhay oil: Sparks, oil will degrade the dielectric and gases resulting from the analysis increased the pressure inside/


EAS Lessons Learned Summary Lessons Learned Published in May 2014.

Circuit Breaker Modification Leads to Inadvertent Trips SF6 gas circuit breaker controls were field modified to trip on low gas and air pressure Field modification resulted in the breakers tripping when DC power was removed and then re-applied to the SF6 Gas circuit breaker When/ to ensure work quality Generation facility experienced a trip due to an internal fault in a SF6 gas breaker Breaker trip interrupted power to the auxiliary transformer Fast bus transfer scheme isolates the auxiliary transformer and/


Multi-function apparatus for secondary distribution

maintenance on the panel. Audioscript_2: The lower shell presents a safety valve on the rear part, which releases SF6 gas in case of accidental overpressure opposite to the front of the panel. Audioscript_3: The combination of epoxy resin together/capacitive dividers © ABB Group Month DD, Year Multi-function apparatus HySec Multi-function apparatus Apparatus integrating: Vacuum circuit breaker SF6 Line disconnector SF6 Earthing switch on cable side Command able to do fast operation cycle: O-0.3s-CO-15s-CO /


EE4503 Electrical Systems Design

, Rated Operating Current, Rated Breaking Current, Rated Short Circuit Making Current MV Equipment SD Arc Suppression Operated by Spring Air Vacuum Gas (e.g. SF6) Operated by Spring http://www.accessscience.com/search.aspx?/Circuit Breaker: MVCB MVCB is able to break the circuit in the normal load and in the short circuit condition. MVCB take the order from specific relays to trip. MV Equipment MV Circuit Breaker: MVCB Need to suppress arcs: Vaccum SF6 Rating: Voltage, BIL, Nominal Current, Short Circuit/


Fundamentals of Bus Bar Protection

Middle bus sections covered by line or other equipment protection Ring bus Higher voltage levels High operating flexibility with minimum breakers Separate bus protection not required at line positions Bus components breakers Low Voltage circuit breakers SF6, EHV & HV - Synchropuff Disconnect switches & auxiliary contacts Current Transformers Gas (SF6) insulated current transformer Oil insulated current transformer (35kV up to 800kV) Bushing type (medium voltage switchgear) Protection Requirements High/


The University of British Columbia, Vancouver, B.C. Canada February 2015 INTRODUCTION TO DESIGN AND ENGINEERING OF ELECTRICAL INSULATION SYSTEMS FOR POWER.

are supported by post insulators, or suspension insulators or bushings at other high power apparatus such as transformers, circuit breakers or gas-insulated or air-insulated busbars at substations. The support insulators are a weak link in the insulation system. The/two such studies are described and the findings are discussed. 97 98 Re-striking process at opening of vacuum circuit breaker Applied voltage: 300kV, 0.4 MPa (SF6) (81kV/div, 20 ns/div FTO waveform measured by 1-GHz surge sensor Source: M.M. Rao/


ELECTRICAL DIAGRAMS.

Diesel Generator Building. A0, A1, B0, B1.C0 – 230 kV SF6 Circuit Breakers A2, A3, B2, B3, C2 – 34.5 kV Circuit Breakers. GILBS 1, GILBS 2 – SF6 Gas Insulated Load Break Switch Assembly. A4, A5, B4, B5 – 34.5 kV SF6 Load Break Switches A6, B6, C6 – 4.16 kV Vacuum Circuit Breakers. A6.1, B6.1 – 4.16kV Vacuum Circuit Breakers / Vacuum Contactors A7, A7.1, A7.2, B7, B7/


(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)

difference between a HV and an LV system occurs at the HV main switchboard. For HV, the circuit breaker types may be air-break, oil-break, gas-break using SF6 (sulphur hexafluoride) or vacuum-break. Of these types, the most popular and reliable are the vacuum/ the unit is governed by contact erosion but could be up to 20 years.  In the gas-type circuit breaker, the contacts are separated in an SF6 (sulphur hexafluoride) gas which is typically at a sealed pressure chamber at 500 kPa or 5 bar (when tested at /


T&D Support Community Insights Conference August 18-21,2015 Minneapolis, MN 2015 Electric T&D Benchmarking.

replace. If over 50% of the value, it gets replaced. 2727Doble Tests, Gas monitors, IR, First Trip Device 3131Health index rating and cost of maintenance vs. replacement. 3 We currently rely on diagnostic testing, equipment age, and system capacity upgrade needs and Sf6 Leak rate as a basis for our circuit breaker replacements. At this time we are in the process of moving to/


PRESENTED BY - M/s VISHVAS POWER ENGINEERING SERVICES PVT. LTD. NAGPUR

SF6 breakers Servicing of on load tap changers. Annual maintenance contracts for substation and control room maintenance. Testing of oil and bushings. RLA studies on power transformers. Installation services for power transformers, HT switchgears and substation equipments Retrofitting of LT air circuit breakers/Extraction of gases in dissolved oil. Separation identification and quantitative determination of gas Interpretation. Key gas and fault pattern C2H2 (Acetylene) :Arcing H2 (Hydrogen) :Partial /


1 Pre-Solicitation Conference: Ames Facilities Support Services (AFSS) August 6-7, 2014 RFP NNA14497087R RELIABILITY CENTERED MAINTENANCE (RCM) AMES FACILITIES.

SF6 Gas circuit breakers rated at 120KV, 15KV –Oil Circuit breakers rated at 120KV, 15KV, 8KV, and 5KV –Air Circuit breakers rated at 15KV, 8KV, 5KV –Vacuum Circuit breakers rated at 15KV, 8KV –Fused cutouts rated at 15KV, 8KV, and 5KV –Pad mounted SF6/ controlled environments functional Steam Traps – clogging/leaking from dirt/debris Variable Frequency Drives – dust/dirt on circuit control boards causing overheating leading to component failure Pumps – Bearings, shaft mis-alignment, debris Building Outages /


Maintenance philosophy of POWERGRID

current transformer and capacitive voltage transformer (CVT) Dynamic contact resistance measurement for circuit breakers Battery impedance testing Frequency response analysis for transformer Dissolved gas analysis for transformer oil Activity Condition Period The main activities for various equipments/ as per the following combinations: N/E, N/LV and LV/E. A. SF6 CIRCUIT BREAKERS Activity Condition Period Dew Point measurement of SF6 gas S/D 3Y* *At time of commissioning then after 6 months and one & /


AG.03: CIGRE SC A3 Green Book planning

HV equipment Transients phenomena in power systems Simulations for HV equipment Circuit breakers Disconnectors Earthing switches DC circuit breaker & DC switchgear Surge Arresters Capacitor banks  (equipment aspects) Series/Gas Insulated Switchgear; WG A3.06 TB 512  Reliability of High Voltage Equipment - Part 4: Instrument Transformers; WG A3.06 TB 511 Reliability of High Voltage Equipment - Part 3: DS & Earthing Switches; WG A3.06 TB 510  Reliability of High Voltage Equipment - Part 2: SF6 Circuit Breakers/


W.J (Bill) Bergman Power System Solutions

ALL TERMINAL EQUIPMENT IEEE Switchgear Condition Monitoring, November 11, 1999 Pittsburgh Combining of Signals (example) interrupter gas density gas leakage rate prediction of fill time interrupter gas density interrupter gas pressure interrupter gas temperature - example of combining signals for an SF6 circuit breaker - information about gas density can be derived from gas pressure and gastemperature i.e. interrupter temperature corrected pressure yields density - additional value derived by combining/


Introduction to Electrical Power Systems

Installed Capacity--- 1,95,000MW Sources Of Electrical Power Generation Conventional Sources Thermal (Coal) Nuclear Gas Water Non conventional Sources Wind Solar- PV Biomass Disadvantages Of Conventional Sources Fossil fuels shall be / Miniature circuit breakers (MCB) Earth leakage circuit breakers (ELCB) or Residual Current Circuit Breaker (RCCB) Molten Clad Circuit Breaker (MCCB) Motor Protection Circuit Breaker (MPCB) Air Circuit Breaker (ACB) Vacuum Circuit Breaker (VCB) SF6 Circuit Breaker Fuse The/


NTPC National Thermal Power Corporation

Half Breaker Scheme CIRCUIT BREAKER: It is an automatic device capable of making and breaking an Electrical Circuit under normal and abnormal conditions such as short circuits. SF6 is the arc quenching media for all the 400 KV and 220 KV breakers installed/ - Removing the particles from the collecting surface to the hopper Electrostatic precipitation removes particles from the exhaust gas stream of Boiler combustion process. Particle Removal - Conveying the particles from the hopper to a disposal point/


33/11 KV Sub Station Santosh S. Kamble J.E ALDC, Ambazari MSETCL, Nagpur.

and operates the circuit breaker to isolate the fault. In 33kv substation generally vacuum circuit breaker are used where are quenching medium is vacuum TYPES OF CIRCUIT BREAKER Low voltage air circuit breaker. Oil circuit breaker. Air blast circuit breaker. SF6 circuit breaker. Vacuum circuit breaker. VCB specification/ bolt insulation or poor electrical connection causing spark in the oil. These fault occurs the gas in the main tank rushes upwards and gets accumulated in the relay chamber. initially it /


Welcome PanAmerica Supply, Inc. (PASI) is a global electrical equipment supplier who provides quality products and support to companies all across the.

Line CardProductSales Contact Us Home PanAmerica Supply, Inc. Oil & Gas And More… Renewable Copyright © 2012 by PanAmerica Supply, Inc. Linecard Transformers Switchgears BUS Duct Systems Circuit Breakers Electrical Equipment Transformers Cables Saper Lock Solar Product Electric Conponent Termination /Lock Nut Switchgear Gas Insulated Switchgear (GIS) Up to 345KV Metal Clad Switchgear Up[to 35KV Catalog Ring Main Unit Medium voltage secondary distribution RMU (Ring Main Unit) Up to 24KV SF6 insulated Catalog /


24 kV GIS Switchgear for Secondary Distribution

safety SF6 prevents fires from spreading Overpressure valves are placed under the switchgear: allows the hot exhaust gas escape into cable conduit eliminates any risk for the operator Overpressure valves Applications Compact secondary substations Light industries Hotels, shopping centres, office buildings, business centres etc. Airports, hospitals, tunnels, light mining applications and railways Utilities (e.g. Iberdrola, ENEL, Endesa, EDP, Fortum, SEC) Circuit Breaker Function/


Medium Voltage Switchgear

Circuit-Breaker & Relay Secondary Distribution Circuit-Breaker & Relay The circuit breaker family for secondary distribution Mechanical actuator mechanism Fixed and withdrawable versions PR521 + current sensors on board the circuit breaker available on request VD4/R HD4/R Vacuum circuit-breaker VD4/R-S SF6 circuit-breaker HD4/R-S Multiple functions in one circuit-breaker/ Units Evolution – more functions, small dimensions ! Safe... Series (Gas Insulated Switchgear / RMU) Safelink ...12 kV, SD block unit /


A SEMINAR PRESENTATION ON 220 KV GSS UDAIPUR SUBMITTED TO:- SUBMITTED BY :-

of the breaker get energised & the moving contacts are pulled apart by some mechanism. CIRCUIT BREAKER & CLASSIFICATIONS  oil circuit breakers  Sulphur Hexa Fluoride circuit breakers  Air-Blast circuit breakers  vaccum circuit breakers Under training SF6 type, vaccum ckt breaker & Air-Blast ckt breakers were used/ Used for protective system Current transformer DIAGRAM OF CT’s Definition:- Buchholz relay is a gas actuated relay. It can only be fitted to the transformers equipped with conservator tanks as /


Retrofit Solutions Overview of Retrofit ABB Arab.

@ ABB Arab Go  Overview Retrofit Activities at ABB Arab involve rehabilitation of out-dated breakers into modern units satisfying client’s cubicle requirements through assembling ABB breakers on re-developed trucks ABB Breaker Types (fixed or withdraw able) Gas Insulated Breakers (SF6) Gas Insulated Breakers (SF6)  HB  HD4 Air Insulated Breakers (Vacuum) Air Insulated Breakers (Vacuum)  VD4 Go  Features & Benefits Robust designs  Tough & Dependable Guaranteed flexibility  Whatever the conditions/


Frankfurt (Germany), 6-9 June 2011 Session 1 – Roundtable C – Internal Arc Session 1 – Roundtable C: Internal Arc Classification – How to convert test.

room: their adaptation to two types of MV switchgear (air insulated and gas insulated) is described. Frankfurt (Germany), 6-9 June 2011 Introduction of Session/ acting protection by a 3-cycles (50 ms at 60 Hz) circuit-breaker. 1326: SIMPLIFIED INTERNAL ARC-STRUCTURAL SIMULATION In paper 1326 are reported /mostly because of ignition of indicators  Certification now considered in STL (Short-circuit Testing Liaison)  Replacing SF6 insulation by air in testing is still under discussion  CIGRE is working on/


Electrical Safety Program Baytown Site, Texas

Protective Equipment (PPE) when performing the following tasks on a 480 volt MCC: Operating a circuit breaker with the door closed. Operating a circuit breaker with the door open. Work on energized parts inside a 480 volt MCC “bucket”. Inserting /. Eliminate/Reduce the Potential Hazard Arc Resistant Switchgear (Note: not “Arc proof”) SF6 gas Switchgear High resistance grounding Current limiting devices (molded case breakers and fuses) Arc Flash Calculations <40 cal/cm^2 Protective device coordination (may /


1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

: –Speed test and External Inspection every 5 years –Oil dielectric test every year –Power factor bushings every 10 years –Test SF6 moisture for Gas Circuit Breakers every 5 years Substation Inspections –Visual inspection every month (Infrared, coronascope, SF 6 Gas detection camera, ultrasonic detector) Relay Maintenance –DC Operational Test & Panel Inspection every 4 years –Relay Calibration every 4 years Improve System Reliability Substation Equipment Maintenance/


ALICE planning meeting 24.12.2010. 24/12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.

part – transport needed) –Recirculation air –Add flowmeter (connect to ELMB: Frederick) EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker. –VIC 16/12 10:30 SPIE: cabling UX25-CR4 – 17/1 New magnet emergency buttons + flashing lights L3 and dipole Frederick/Cleaning rack filters (Philippe) Maintenance UPS EBS106/2X and EBS128/2X (transparent) PH-DT: new gas monitoring: Stop C2H2F4, Isobutane, CH4 and SF6 TPC FEC 24/12/10 ALICE planning meeting118 Activities in MNF - Week 2 - 12/1 Wednesday/


ALICE planning meeting 14.1.2011. 14/1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.

SG2) 12/1 (during the cooling stop): Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2) 13 Flowmeters 14/1/11 ALICE planning meeting10 Gas system status over Christmas Albin TPC: flush CO2 TRD: ON TOF: ON – /– transport needed –Recirculation air - SPIE –New air-flowmeter (connect to ELMB: Frederick) EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker. –VIC 16/12 10:30 – Intervention 11/1 whole day SPIE: cabling UX25-CR4 – 17/1 New magnet emergency buttons + flashing/


ALICE planning meeting 4.2.2011. 4/2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.

in SG2) 12/1 (during the cooling stop): Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2) 13 Flowmeters 4/2/11 ALICE planning meeting10 Gas system status over Christmas Albin TPC: flush CO2 TRD: ON TOF: ON – /– transport needed –Recirculation air - SPIE –New air-flowmeter (connect to ELMB: Frederick) EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker. –VIC 16/12 10:30 – Intervention 11/1 whole day SPIE: cabling UX25-CR4 – 17/1 New magnet emergency buttons + flashing/


A SEMINAR REPORT ON 400 KV GSS RAISER JAIPUR ROAD,BIKANER Presented by-:

bar  Power Transformer  Potential Transformer  Current Transformer  Auto transformer  Circuit Breaker  Buchholz relay  Power Line Carrier Communication (PLCC) EQUIPMENT OF SUB /breaker get energised & the moving contacts are pulled apart by some mechanism.  oil circuit breakers  Sulphur Hexa Fluoride circuit breakers  Air-Blast circuit breakers  vaccum circuit breakers Under training SF6 type, vaccum ckt breaker & Air-Blast ckt breakers were used in the GSS. Definition:- Buchholz relay is a gas/


Welcome to High Volt Power & Control System (02717) 645198 / 645199.

Electrical Control Panels Offered By High Volt Manufacturers In India. VCB Panel up to 11KV SF6 Panel up to 11KV HTMCC up to 11KV 33KV VCB Panel 33KV SF6 CB Panel Busduct (HT/LT) Outdoor CSS RMU Relay & Control Panel NGR Panels/single phase power supply. product RING MAIN UNIT Ring Main Unit is completely sealed, gas-insulated solid switchgear unit. primary switching devices are either switch disconnectors or circuit breakers. it is used for two inputs with machine-driven or electrical interconnect and one /


ALICE planning meeting 28.1.2011. 28/1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.

SG2) 12/1 (during the cooling stop): Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2) 13 Flowmeters 28/1/11 ALICE planning meeting10 Gas system status over Christmas Albin TPC: flush CO2 TRD: ON TOF: ON – /– transport needed –Recirculation air - SPIE –New air-flowmeter (connect to ELMB: Frederick) EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker. –VIC 16/12 10:30 – Intervention 11/1 whole day SPIE: cabling UX25-CR4 – 17/1 New magnet emergency buttons + flashing/


Rajdhani Institute of Technology & Management Rajasthan Technical University Submitted By:- Name:- Tapan Sharma RTU Roll no. :-09ERDEE057 Stream:- Electrical.

the voltage at the high tension lines by ammeter and voltmeter respectively. So we use CT’s (current transformer) & PT’s (potential transformer) for it. Circuit breaker (SF6): - Here we use circuit breakers for the protection purpose. These breakers filled by SF6 gas which is works as arc quenching medium. Bus bars: - In this plant two bus bars are connected. Bus A and Bus B. bus coupler is/


PHOENICS Based Arc Models as a Test Tool

B. CHAM USER MEETING 2006 AN EXAMPLE OF CIRCUIT BREAKER At high current, vapour from nozzle surface pumped into storage volume to form a high pressure reservoir (fig. on right). At current zero, fast gas flow into nozzle quenches the arc, thus interrupt /CHAM USER MEETING 2006 WHAT CAN BE DONE FURTHER On fundamental level, we need a more accurate radiation model for gas mixture of SF6 and PTFE. Convergence problem is not fully solved, especially with skewed grids (BFC). On PHOENICS side, parallel computation/


1 Lessons Learned 2011 Cold Snap Event System Operator Conference September 11-13 and September 25-27, 2012 Memphis, TN Steve Corbin Reliability Specialist.

devices should be checked to ensure: SF6 gas in breakers, current transformers and other electrical equipment is at the correct pressure and temperature to operate safely during extreme cold 2012 System Operator Conference 23 Transmission Facilities and Winter Weather Operations –Heaters (when so ‐ equipped) and associated support circuits are functioning correctly The minimum operating ambient temperature should be known on all transmission facilities. This/


Chapter 3 HV Insulating Materials: Gases Air is the most commonly used insulating material. Gases (incl. air) are normally good as electrical insulating.

by Lorentz force due to the E-field. Electron gains kinetic energy. Collide against gas atoms - kinetic energy converted to potential energy. Ionisation occurs if this energy exceeds the/gas Flashover voltage roughly 4 times higher than air. The following attachment processes occur in SF6: SF6+e  SF5+F+2e SF6+e  SF6SF6+e  SF5 – + F Electronegative gases SF 6 Substations (GIS) Colourless, odourless, non-toxic, chemically inactive. 5 times heavier than air. Also arc quenching medium in circuit breakers/


T&D Support Community Insights Conference August 20-22, 2014 Vail, CO 1 2014 Electric T&D Benchmarking.

% Substation switchgear testing and repairs/refurbishment40% Oil Circuit Breaker (OCB) repairs/refurbishment40% Air Circuit Breaker (ACB) repairs/refurbishment50% Relay testing and repairs/The algorithm considers current off - line test results, yearly dissolved gas analysis (Main Tank and LTC), transformer criticality, Manufacturer, LTC/Sampling on SF6 GCBs 21Reliability money is used to phase out oil breakers each year. 30Design, manufacturer, vintage 27Instead of overhauling OCB breakers we have/


REMCON Electrical Co. L.L.C. Remcon engineering l.l.c.

Contracts, Service, and overhaul of existing systems Innovative Solutions in Automation Engineering, Testing & Commissioning of Control Systems, SF6 gas monitoring. Retrofit of existing plants High Voltage Substation Activities Design, supply, installation, testing and commissioning of MV & HV/Up Transformer - Magnus (up to 2.5kV) 24 Primary Current Injection Kit - ODNE-AT with 2 unit 25 Circuit Breaker Timing Tester -EGIL 26 Clamp meter - Fluke 337 27 CT Polarity Tester 28 Meggar 5kV - MI-5500E 29/


COSTRUZIONI ELETTROTECNICHE CEAR s.r.l.

offer you a complete set of Industrial IT automation solutions to meet your entire plant automation needs (Oil & gas, Petrochemical, Chemical, Refining, Power Plant, Pharmaceutical and Food Industries). CEAR provides Customer-tailored solution to span /by prefabricated air insulated metal frames, provided with: on load or no load switch disconnector, automatic circuit breaker (Air, Vacuum or SF6 insulated) and measure devices. The ELECAB switchboards are used in secondary Medium Voltage power distribution. /


ULTRA-HIGH VOLTAGE GRID CHINA ULTRA-HIGH VOLTAGE GRID Liu Yunpeng

in China In China, the resources of hydro power and coal are available in abundance while oil, natural gas and uranium material are insufficient. The hydro power and coal resources are backbone in generation energy supply in China/ realized through cooperation. The type tests and certification will be finished before July, 2007. LW10-1100kv SF6 circuit -breakerPrototype of 800kv GIS circuit breaker ULTRA-HIGH VOLTAGE GRID UHV Equipment and Test Pinggao Electric UHV Switchgear Prototype of 800kv GIS bus-bar/


Premset : A New generation of MV Switchgear

switchgear is increasing ” “ maintenance-free is far more important than SF6-free” “ we want a switchgear with Easy Operation for our maintenance and operation teams” “ cost effective and compact Circuit Breakers are needed for small primary substations or loop management ” “ no/connections 4 - Core unit 5 - Bottom connections 6 - Bottom compartment 7 - Sensors (CTs and VTs) 8 - Gas exhaust duct 4 7 8 5 6 Premset Safety & Reliability - SSIS Totally Shielded Solid Insulation System design for optimized safety/


DIELECTRIC SYSTEMS Overview INTERNATIONAL SALES MEETING 2009

Cables Cable Joints and Splices Instrument Transformers Power Capacitors Motors Generators Bushings Insulators Switchgears ( Air, Gas, Oil insulated) Lightning Arrestors Circuit Breakers Insulation Materials ( Oil, Paper ) Protective Goods for Live Line Work (Gloves, Hoods, Hoses/Measuring Systems: Optional add-on to PD detector Extendable up to 500A Analog RIV Systems : SF6 Filled Standard Capacitors 15kV-800kV Outdoor Capacitors available upon request ACCESSORIES FOR DIELECTRIC TEST SYSTEMS (continued/


Substations August 19-21, 2015 Minneapolis, MN 2015 Transmission & Distribution Benchmarking Community Insights Conference.

has five Condition Based Maintenance Programs (CBM). 1. Predictive Maintenance Analysis (PMA), 2. Circuit Breaker Analysis (CBA), 3. Dissolved Gas Analysis (DGA), 4. Oil Circuit Breaker Analysis (OCBA), and 5. Oil Tap Changer Analysis (OTA). In addition to those /1 year for all other distribution transformers NEW: Annual partial discharge testing of transformer surge (lightning) arresters SF6 Breakers: Replaced Doble Testing with Hi-Pot Testing Power Factor (Doble) testing of bushings from 5 years 10/


T&D Shops T&D Support organizations T&D Asset Management 1.

includes: sundry maintenance, e.g. fence repairs, weed spraying, snow; rebuilds/ overhauls of major items, Gas circuit breaker overhauls, SF6 breakers and synchonous close breakers for capacitor banks practices in place that have been successful in improving substation shops (1) 25 Work Scheduling/the equipment to complete the task. 52--Having a contract with an outside vendor to handle our switchgear breaker repair and rehab. practices in place that have been successful in improving substation shops (3) 27 /


A Seminar On 220 KV GSS, SUJANGARH Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY (Rajasthan Technical University,

To:- Submitted By:- Mr. Contents 1.Introduction 2.Signal Line Diagram 3.Lighting Arrester 4.Isolator 5.Insulators 6.Circuit Breaker- SF6 CB 7.Protective Relay 8.Power Transformer 9.Current Transformer 10.Potential Transformer 11.Wave Trap 12.Control Room 13.Capacitor/fault or overloads and to minimize their effect. SF 6 circuit breakers are used at 220kV substation, Sujangarh. In SF 6 CBs the contacts are surrounded by low pressure SF 6 gas. Protective Relay Its primary purpose is to detect the fault /


COSTRUZIONI ELETTROTECNICHE CEAR s.r.l.. COMPANY INFORMATION Located in Carugate (Milan – Italy) Located in Carugate (Milan – Italy) Founded in 1980 Founded.

metal frames, provided with: on load or no load switch disconnector, automatic circuit breaker (Air, Vacuum or SF6 insulated) and measure devices. (Air, Vacuum or SF6 insulated) and measure devices. The ELECAB switchboards are used in secondary Medium Voltage/offer you a complete set of Industrial IT automation solutions to meet your entire plant automation needs (Oil & gas, Petrochemical, Chemical, Refining, Power Plant, Pharmaceutical and Food Industries). CEAR provides Customer-tailored solution to span /