Ppt on railway reservation system project

ICT for Efficient Railway Infrastructure R K Bahuguna Director/RailTel 08/01/2010 IRSE Seminar on Role of Modern Signalling, Telecom & ICT Systems in Making.

System PA SYSTEM Information at Railway Stations Display Boards Coolie Enquiry -> Reliable Passenger Information? Uncertainties in train operation – Large and Widely Spread Railway Network – Different Type and Class of Trains to Varied Destinations – Local and social problems Different class of people Scarcity of reserved/ Train Information System Technology Mission for Railway Safety (TMRS)” one of the project selected was “Satellite Imaging for Rail Navigation (SIMRAN)”. Purpose of the project is to /


Jordan Hejaz Railway Reality & Aspiration Dr.A.MALKAWI Deputy General Director Jordan Hejaz Railway 1 Eskisehir,17-21 June 2013.

a modern rail system with international standards. Although I will talk to you today about the oldest railway line from history/ first 1317 AH) has started work on a project to establish a railway up to the Hejaz, during the celebration of/railway property located within the territory of the Hashemite Kingdom of Jordan from the Jordanian-Syrian border in the north up to Al-Mudawara station in the south of Jordan. 14 -Transporting in a comfortable and safe conditions. -Investment of the assets of JHR. -Reserve/


The success stories of participants in the Skolkovo project March 2013.

of business in 2013 In Tatarstan, the system of the company Avtodoria began working in pilot mode. The Russian project “DO-RA” found partners for production and distribution in Japan JSC Russian Railways received two “TEM14” innovative locomotives from the/sum of $30 million by the end of 2013. Market Ltd. “Emertra" The Ostrovok.ru service for online hotel reservations attracted $25 million in its latest round of investment. A consortium of investors gave funds ( the venture funds General Catalyst/


MEGAPROJECT Case Study Basic Project Information Case compiled by: João de Abreu e Silva and Marisa Pedro............................... Contact details:

to ensuring, continuously, the effective implementation of each supplier’s Quality Management System in the preparation of the studies. The criteria used for monitoring and /several pieces of legislation where put forward to implement preventive measures (reservation of corridors from incompatible land uses). 2008: Public Contract Code (Código dos/Vigo were included in the 30 prioritary projects of TEN-T 2006: The Strategic Guidelines for the Railway Sector were presented 2007: change of /


IEEE 802.15-12-0053-01-0ptc Submission January 2012 Ibrahim Muftic, Parsons BrinckerhoffSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal.

is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The /… IEEE 802.15-12-0053-01-0ptc Submission Train Control over GSM-R ETCS project started in 1992 by UIC/ERRI Specifications for a new digital train control to satisfy/–Only where ETCS L2 is deployed also GSM-R is used for as train control system bearer –Overall European railway network ~220,000 km –Planned to be equipped with GSM-R ~150,000 km/


The story behind NTV, or Nuovo Trasporto Viaggiatori Completion of Italy’s high-speed railway network, together with the liberalization of passenger railway.

distance of no more than 600 metres from stations, with the possibility of reserving on-line or over the phone. Car rental with flexible terms of use /engineers and involving real-time diagnosis of defects, breakdowns and accidents. The TrainTracer System With TrainTracer, operators are immediately notified of all major malfunctions, meaning that / “Moving screen” project is based on the brilliant idea of the Film-Car, which, in and of itself, hearkens back to the trains and railways that have always /


UNIVERSITY OF NAIROBI DEPARTMENT OF GEOSPATIAL AND SPACE TECHNOLOGY FINAL PROJECT PRESENTATION 3 rd April 2014

PROJECT BACKGROUND The human population in Nairobi county is increasing at a very fast pace. This is leading to a strain of the available infrastructure e.g. water and transport The traffic congestion on many roads within the county is a clear indication of lack of an efficient transport system/ order to set up a new railway line MRTs running on the road reserves is the solution. 20 joewachiye@gmail.com PROPOSED MRTs CORRIDORS 21 joewachiye@gmail.com CONCLUSION A suitable railway line could not be set up due/


«Shaping the Railway of the 21st Century» IRICEN FOUNDATION DAY 21st March 2005 High Speed Rail Transport Challenges for Civil Engineers Vipin Sharma Director.

Entreprises Ferroviaires (EF) Department Technologie System Department World Filiales UIC P atrimoine ETF Railway Technical Publications LT Technical Language Services «Shaping the Railway of the 21st Century» World Activities Important projects International rail freight corridors –Rail / development will produce similar data Impact on oil reserves is reflected by the fact that 21st century will be consuming 5 times that of 20th century «Shaping the Railway of the 21st Century» While fuel efficient cars/


Railway Marketing Center Solution (Technical Presentation) EBG Transport Solution SDT.

based on the onsite requirements and use the updated document for project communication. Directly use this document for overall solution communication with /DRS DPM FusionStorage distributed storage platform FusionManager Cloud management system FusionSphere Railway marketing services Virtualization platform HPC HA DR 20 High-/ ms or less. Copyright © 2014 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, /


PROJECT BLACK SEA TRADENET DOING BUSINESS WITH ROMANIA RODICA BELTEU – CONSTANTA CHAMBER OF COMMERCE, INDUSTRY, SHIPPING AND AGRICULTURE WORKSHOP DOBRICH,

second-largest source of oil and natural gas along with its rich proven reserves of minerals and metals. Also, it is becoming Europes major transport and/ the Romania legislation : 1. Permanent buildings, such as residential or business buildings, logistical projects, roads, utilities, bridges, etc. Building permits for permanent buildings are obtained if the/are in the poorest condition. Highways are very limited, 113 km. The railway system is of 10,981 km length. The water transport is divided into maritime/


Senior Vice-President for Innovation Development - Chief Engineer, JSC “Russian Railways” VALENTIN GAPANOVICH USING INTERNATIONAL STANDARDS BY RUSSIAN.

X - mean time to failure (for repairable items) f r - reserve use frequency K d – downtime ratio Т r – mean time to /SYSTEM Project of the United Transport and Logistics Company of the Common Economic Space Shared use of the rolling stock Common forwarding technology Traffic diagram optimization mechanism Single payment system Infrastructure development optimization Meeting the requirements of international clients EFFECTIVE OPERATION WILL BE ENSURED DUE TO MODERN REGULATORY FRAMEWORK 11 © Russian Railways/


Need for Accounting Reforms In Indian Railways & Transitioning from Cash to Accrual Accts on IR & implications A.Venkateshwar, IRAS ’79 Consultant, Railway.

to moving from a single entry to double entry system, which will not encompass issues such as cash-/, Arbitrations ) Accounting Reforms in Indian Rlys8 Weaknesses and Limitations of Railway Accounts … (4) Limitations and errors/omissions in the P &/users. Will bring clarity to profitability/feasibility of PPP projects. Dependence on general budgetary support will reduce. Segment/– 56255 ; DF – 30006 RSF – 11435 ; SRSF – 15756 Rev & Misc – 2382 Reserves 6873 DRF – 1777; DF – 2013 PF – 1360; CF – 1389 RSF – 97 ;/


BSR INTERREG III B Joint Secretariat,

and guidance systems for tourism and railway traffic Multimodal transport solutions for easy and safe travelling Sustainable management and development of tourism attractions Information and planning systems, and methodologies for GIS/Internet systems Approximate total project budget: EUR/ managing authorities of natural reserves (national, landscape parks) Transnational survey for studying the use of nature as a resource as the state of spatial planning in the project areas Concepts/models for interactive/


© ETSI All rights reserved

reserved And ETSIs work includes… Mobile GSM, UMTS, Railway communications… private/professional land mobile radio systems Cordless (DECT) Spectrum matters & electromagnetic compatibility Radio technologies Wireless Local Area Networks TETRA & other public safety systems/hosting © ETSI 2012. All rights reserved The ETSI structure General Assembly ETSI Board Special Committees Industry Specification Groups Technical Committees ETSI Projects ETSI Partnership Projects “Technical Organization” Working Groups The/


16 December 2011CER The Voice of European Railways HitRail - Helping European Railways Transition to the Digital Future through Cooperation.

projects implementation) 56 December 2011CER The Voice of European Railways Hasn’t rail been in the digital world for quite some time, already? Help railways transition to the digital future? 66 December 2011CER The Voice of European Railways Contrary to common belief, historically, railways/The real-time monitoring of the freight trains  The marshalling and allocation (train composition) systems  The reservation of train path for freight trains  The management of connections with other modes of transport/


RAIL CRC 1 A/Prof Alex Remennikov University of Wollongong, NSW Australia International Concrete Crosstie & Fastening System Symposium Research on Railway.

turnouts Field Trials Sleeper/bearer pads Composite bearers RAIL CRC 13 Concrete Sleepers Projects Innovative/Automated Track Maintenance and Upgrading Technologies Dynamic analysis of track and / RAIL CRC 16  There is a widespread perception in the railway industry that concrete sleepers have unused reserves of strength.  E.g., sleepers are generally replaced only/; severe cracks at the rail seat causing the ‘anchor’ of the fastening system to move and spread the gauge; severe cracks at the midspan of the /


MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED Welcome Presentation on MSRDC Projects.

TIME, FUEL & MONEY Reduced waiting period at crossings savings in fuel and thereby money ROBs ELIMINATES ACCIDENTS Railway and road traffic on separate levels eliminates accidents Uninterrupted flow of traffic – increasing throughput. Boost to national/ lanes reserved for buses Total length : 15 km Interchanges for smooth dispersal of traffic at Worli, Haji Ali, Bhulabhai Desai &Nariman Point Modern traffic monitoring, control & surveillance system State of art toll collection sytems proposed Project cost /


McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 8-1 BUSINESS DRIVEN TECHNOLOGY Business Plug-In B8 Emerging Trends and Technologies.

important in a specific community, industry, or sector are carefully monitored, watched, and reported to key decision makers Trend projection – when numerical data is available a trend can be plotted on graph paper to display changes through time and into/” McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 8-40 Closing Case One Autonomic Railways Canadian Pacific Railway (CPR) is one of the largest railway systems in North America with more than 14,000 miles of rail line in Canada/


CER - 2005 The Voice of European Railways CER view on South East Europe: Balanced investment and financial stability Zagreb, 17 June 2005 Ad Toet Advisor.

European Railways Planned infrastructure bottlenecks by 2015 (NORMAL SCENARIO) > 100% 85-100% 70-84% < 70% Degree of use Source: Study on “Infrastructure Capacity Reserves / Railways European rail infrastructure Enormous backlog in investment in both rail Infrastructure and Rolling stock Trans-European Networks TEN Priority Projects: 30 projects,/ Voice of European Railways Example: South East Europe Routes Corridor X Upgrading of infrastructure stagnant. Deterioration of transport systems and extra costs /


Enabling digital evolution Teleste Proprietary. All rights reserved.Unclassified TELESTE CORPORATION S-VMX Integrated VMS Solution Rail & Metro Applications.

reserved.Unclassified Providing HW & SW solutions for Passenger Information Systems Teleste Passenger Information & Display Solutions On-Board Solutions Railway Solutions Display Solutions Teleste Proprietary. All rights reserved./reserved.Unclassified Case Presentation : CTA (Chicago Transit Authority) Teleste Proprietary. All rights reserved.Unclassified Case Presentation : CTA (Chicago Transit Authority) “Teleste was selected for the project based on technology, integration of third party systems/


Page 1 Ing. Alena Loudová DEKRA CZ a.s. + Partners of the project 2nd Dissemination Conference - Halle, 19th March 2014 Evaluation of Pilot Projects (CZE)

suggestion to use the data system in consignment notes!!! Pilot Project ImplementationPage 20 Transport document Consigment notes: International consigment notes are a part of international contracts: CMR – road transport CIM – railway transport River transpot document – /DATE OF LOADING OF THE GOODS EINLADESTELLE DES GUTES UND DATUM PLACE / ORT COUNTRY/ LAND18 CARRIER´S RESERVATIONS AND COMMENTS VORBEHALTE UND BEMERKERUNGEN DES FRACHTFÜHRERS 5 ATTACHED DOCUMENTS BEILEGENDE DOKUMENTE 6 SIGNO AND NUMBER 7 /


The Russian Federation (53)

and other ancillary (tourist) services via CRTS “SPutnik“ on EMD stock ATSS agencies performing reservation and sales of rail services on the basis of Internet technologies and with the use of Electronic MCO (in cooperation with “Russian Railways“ and Automated Control System “Express-3“) – PSSRS project ATSS agencies performing Internet reservation and sales of scheduled bus services on EMD Issuance and settlement performed in three/


© LANCO Group, All Rights Reserved POWEREPC INFRASTRUCTURE SOLAR RESOURCES Fuel Supply Issues: An overview.

Above figures are in Million Tonnes No increase in production over previous year! Expansion fear for Project developers. © LANCO Group, All Rights Reserved INDIAN COAL: Production Vs Dispatch 15 COAL PRODUCTION IN 2010-11 PRODUCER (COAL CO.) / sector Growth in Logistics remains a constraint for coal transportation – Railways need to gear up for improving rolling stock availability. Port capacity requires augmentation with matching evacuation system Demand side management for efficient coal use is also to be/


© 2014 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.

initiatives (Contact Center, PBX replacement for 213 legacy PBXs). “ AT&T was able to consolidate multiple technology projects into a cohesive program to integrate our Microsoft Office 365, Lync and Genesys Contact Center initiatives. BNSF and /systems, network size and complexity. AT&T Success Story 4 © 2014 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. BNSF Railway/


Current Information / Projections for Moore County Presented by: Tim Lea Moore County Commissioner September 2011.

6,435,235 1/31/2011Transfer from GF to Cap Reserve 15% over$6,629,011$13,064,246 1/31/ District Phase 3 3,871,816 __________________________________________________ TOTAL $5,693,516 Current Sewer System Capital Improvement Projects  Old Town Sewer Rehab $5,450,000  2 Lift Station Permanent Generators/ of Wilmington = 3 hrs. Port of Wilmington = 3 hrs.  Rail - Aberdeen Carolina and Western Railway Connects to CSX and Norfolk Southern  Airports Montgomery County Airport = 3 miles Moore County Airport = 33 /


Visit of the Slovenian Railways March 14 th 2006 Content Maintenance contract and input versus output By Jan Swier, ProRail, The Netherlands, tel. +31.

Visit of the Slovenian Railways March 14 th 2006 Content Maintenance contract and input versus output By Jan Swier, ProRail, The Netherlands, tel. +31 30 235 5315, email: jan.swier@prorail.nl © ProRail. All rights reserved 2 100% outsourcing /needed. 3.Form the beginning (some) experienced project managers, planners and controllers are needed. 4.Regulate the ownership of drawings, plans, calculations, rights, etc. during seperation. 5.System acceptance documentation of new rail infrastructure should be /


Helping European Railways Transition to the Digital Future through Cooperation 6 December 2011 European Parliament, Brussels Prepared.

railway environment.  has always been at the heart of a very active Community of Railway companies which constitutes a solid base.  has developed an international prestige in building and coordinating complex pan European projects/. Brussels, 6 December 20114 Railways@crossover Hermes Open System Architecture (HOSA)  Hermes Open System Architecture:  The common way/ Functional Blocks 21 Railways@crossover Brussels, 6 December 2011 Hit Rail Web Service: Support to the Railways Reservation requests (UIC 918/


© Siemens AG 2015 – All rights reserved. Signalling: Convergence of needs Suburban Railways / Metro Networks.

Implementation: The former inductive loop- based system has now been replaced by a radio-based system (wireless communications). August 2015 © Siemens AG 2015 – All rights reserved. Page 5Mobility Division / Mobility Management Benefits/ All rights reserved. Mass transit meets mainline Example projects August 2015 © Siemens AG 2015 – All rights reserved. Page 14Mobility Division / Mobility Management Crossrail Project characteristics 15 billion GBP project, the largest infrastructure project in Europe /


N° 1 Possible co-operation between rail and buses in the area of Telematics Applications for Passengers Presented by European Railway Agency (ERA) 16-10-20096th.

data exchange of timetables, tariffs, reservations, train running information, etc which must be respected from 2010 by the European rail sector (railways, infrastructure managers, ticket vendors / structures that can be used to build public transport timetable information system (including buses and rail). Fares, operational management, real time data,/Kortrijk N° 17 Thank you for your kind attention: Mickael Varga Project officer for Telematic Applications European Railway Agency Tel: + 33-3- 27 09 65 08 Fax:/


Bigbrother.com The positive Side of Investing in Egypt Sample Report Data driven business and marketing decisions support Copyrights Reserved. MediaSci.

core retail activities. Majid Al Futtaim expands into Egyptian mixed-use projects MEDIA EXPOSURE Copyrights Reserved. MediaSci 201617 6,0321,019 159 64 State-run National Investment/) for the Egyptian National Railways (ENR). National Investment Bank studies $157.6 mln loan for Egypt railway authority MEDIA EXPOSURE Copyrights Reserved. MediaSci 201618 5,8341,809/ of 13 trains for the new line of Cairo’s underground metro system. What do market makers say about investing in Egypt German company Siemens/


Infrastructure Projects in Russia

Power Plants Russia plans to construct high speed railway between Moscow and St. Peterbourg Russia invests in/projects, Project archives are kept and stored as required. Organizing data These requirements are set on the Program level and are mandatory for all program participants. Templates, reference-books, coding systems/project baseline. But baseline schedule does not exist! Buffers We recommend to use optimistic schedule for setting tasks for project implementers and manage project reserves. Project/


October 2014 RAILWAY SAFETY 2013/14 FINANCIAL YEAR PRESENTATION TO PORTFOLIO COMMITTEE 1.

Heavy Haul Line expansion projects STRATEGY TO REGULATE SUPPLIERS OF SAFETY CRITICAL SYSTEMS, COMPONENTS & SERVICES The development of a regulatory arrangement that is able to recognise the capability and competence of suppliers of railway safety critical systems and services A.2013/ trains Lack of management of the rail reserve Security at / around stations SARPS recovered R 1 041 846.50 worth stolen cables SARPS arrested 14 903 persons for crossing a railway track without authorization C.2013/14 STATE OF/


1 06/12/2011 Josema Cavanillas December 6 th, Brussels Advancing towards a unified European Railway Operation Josema Cavanillas Research.

safety to staff. 28/08/2015 Our projects iCargo and SITME 14 06/12/2011 Josema Cavanillas The iCargo project aims at advancing and extending the use of/06/12/2011 Josema Cavanillas No. 16© Logica 2010. All rights reserved Real-time automated event management Interoperable cargo, vehicle and infrastructure Dynamic multi-/ and Tramway) in the real-time information management system. SITME – going further 21 06/12/2011 Josema Cavanillas Railway Operation Integration ▶ The Operation integration is a great/


PRIVATE AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. TrackSafe An Ontario based story of successful collaboration Mark.

AND CONFIDENTIAL © Bombardier Inc. or its subsidiaries. All rights reserved. TrackSafe - Introduction Railway Industry - conservative, risk averse, very expensive & slow to innovate TrackSafe - Railway track worker safety system, designed and developed in Ontario in an agile, affordable and /approach towards team and willingness to engage students in all aspects of the project so they are invested in the success of the project. Care for development of students and their critical skills and as such work/


Empowering Through Knowledge and Skill Development – Initiatives by IRISET C.K. Prasad, IRSSE (SAG/NF) Professor IRISET INDIAN RAILWAYS INSTITUTE OF SIGNAL.

NF) Professor IRISET INDIAN RAILWAYS INSTITUTE OF SIGNAL ENGINEERING & TELECOMMUNICATIONS If money is your hope for independence you will never have it. The only real security that a man will have in this world is a reserve of knowledge, experience and/portal. New facility has a seating capacity for 80 trainees ( Clients on twin sharing) and augmented with advance projection system and interactive panel with podcasting functionality. The centre also provides facility to conduct on-line examination. 17 E-/


SEM02-16 What is ETSI ? ETSI Seminar © ETSI 2010. All rights reserved.

© ETSI 2010. All rights reserved ETSI ? We are the…/ Standards Group (MSG) Multimedia Content Distribution (MCD) Powerline Telecommunications (PLT) Railway Telecommunications (RT) Reconfigurable Radio Systems (RRS) Safety Satellite Earth Stations & Systems (SES) Smart Card Platform (SCP) Speech Processing, Transmission & Quality (STQ/ technology Has a limited duration 25 26 ETSI Partnership Projects 3rd Generation Partnership Project specifying a W-CDMA system based on an evolution of the GSM core network /


SEM02-16 What is ETSI ? ETSI Seminar © ETSI 2010. All rights reserved.

ETSI 2010. All rights reserved ETSI ? We are/Telecommunications Over 800 million terminals in more than 110 countries DVB system specifications Based on DVB Project proposals Services available on every continent TETRA Contracts in 117 countries/ Group (MSG) Multimedia Content Distribution (MCD) Powerline Telecommunications (PLT) Railway Telecommunications (RT) Reconfigurable Radio Systems (RRS) Safety Satellite Earth Stations & Systems (SES) Smart Card Platform (SCP) Speech Processing, Transmission & Quality/


International Concrete Crosstie and Fastening System Symposium

and the Yeh Student Center Meeting Room 1310 Conference Room 3350 [Reserve at registration desk] Wireless Internet Access (orange sheets inside folder) /the WILD System Advancing the State of the Art Federal Railway Administration’s Broad Agency Announcement Mechanistic Design of Concrete Crossties and Fastening Systems Advanced Concrete /owners, and maintainers Industry-wide awareness of latest research projects Strengthened relationships between industry and academic community Comprehensive list of /


High-available SIMATIC S7-400H Резервированный Simatic

due to Ruggedness and Stability Architecture High-available automation system SIMATIC S7-400H Properties Goals Simple project planning Programming same as standard system All S7 programming languages can be used  Existing / Energas GmbH Shipbuilding Kawasaki Heavy Industry Turbine control Data Systems & Solutions UK (formerly Rolls Royce) Passenger transport La Vanoise Express aerial railway Saalbach-Hinterglemm aerial railway Semiconductors (utilities) Samsung, SSMC Singapore Exhaust gas incineration/


2010 – Railway Overview Heike Saadatpour CE & SEE Territory 22 Years of Excellence.

IE-MiniMc -35°C to +70°C) DIN-rail mount Ticketing Systems, AccessPoints * Symbole Pictures Industrial Ethernet Conversion Different Power Connection Options: / & Flicker) iMediaChassis/6 with SNMP Card IMC Networks subjected to Railway Environment - like tests and PASSED ! Radiated Immunity EN 61000-4/ between ports Per port buffers will be reserved for high priority frames Specifications (cont..) /998 and 997 Open Discussion > Questions? >Current projects >Current favorite Products >Wishes? Except SFPs – /


Welcome to Hungary.

Detailed tailor-made information package about economy, politics, financial incentives, business environment, tax system, sectors incl. electronics, etc. Site visits, meeting with local, regional and government/ and warehouse buildings • Fuel filling and repair facilities • Public road and railway links • Separate civil aviation sector and passenger terminal • Suitable for the/airports POLUS KINCS ZRT. offers to investors: Project Rudabánya The mine(s) and its reserve are ready to be introduced to the Chicago/


NSB The FARGIS Conference, March 2000 Information Networks for Multimodal Transport Jan Christiansen NSB (Norwegian State Railways)

-friendly, Internet-based, multimodal information system. EU-SPIRIT provides door-to-door public transport and travel information across Europe by integrating long-distance railway, local transport systems and travel-related, non-transport information/ their own time table data.  The project will develop a networking architecture, allowing public transport information and reservation systems to communicate without major modifications of existing systems. Competence and maintenance of data and information /


Copyright © 2011 by K&L Gates LLP. All rights reserved. UK and Global Real Estate Trends – Opportunities for 2011/2012 20 September 2011, London.

for all sorts of stakeholders, such as:  makers of transit system equipment  architects/designers/engineering services, building/construction material providers / efficient/’green’ projects (again, ties back to policy aims) Copyright © 2011 by K&L Gates LLP. All rights reserved. Real Estate /parking zone and infrastructure to accommodate 75,000 visitors  Other infrastructure: including airport, three railway lines, recycling facilities, hotels  Mountain cluster  Biathlon and ski complexes, a bobsled /


Environmental Management Plan for Pachmarhi Biosphere Reserve ENVIRONMENTAL PLANNING & COORDINATION ORGANISATION (EPCO), BHOPAL.

of Indian forest started in 1862 by demarcating Bori Reserve forest resulting in establishment of forest Deptt in India  The system of fire line to control fire first time /Project Tiger) Area 1427.00 sq km Zonation  Core zone524.37 sq km  Buffer zone4525.93 sq km Altitude320-1352 above msl Objectives Preparation of Environmental Management Plan for Pachmarhi Biosphere Reserve/Base Map River/ water bodies, railway lines, major roads, administrative boundaries, names of major settlements and other landmarks /


DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

RAILWAY,SECUNDERABAD What is dedicated freight corridor? A dedicated freight corridor is expected to be  the proposed new track exclusively reserved/rakes increased from 6,000 to 7,500 Km. Railway Budget 2006-07 Dedicated Freight Corridor Project Following dedicated freight corridor project included in the budget:  Western Corridor: JNPT /.  P.Way Material – Part of the Contract.  Laying and Linking – Mechanized system.  Welding of rail joints – Mobile Flash Butt Plant. Maintenance of freight corridor  /


Copyright ©2012, ©2008 by Pearson Education, Inc. All rights reserved. The American Nation: A History of the United States, Fourteenth Edition Mark C.

improved its public transportation system and obtained passage of the tenement house law of 1901  Cleveland forced a fare cut to 3 cents on the street railways Copyright ©2012, ©2008 by Pearson Education, Inc. All rights reserved. The American Nation:/ (contd) Obtained New Laws  1902: New Lands Act funneled proceeds from land sales in West into federal irrigation projects  Department of Commerce and Labor, which was to include a Bureau of Corporations, with authority to investigate industrial combines/


NAVI MUMBAI – LARGEST PLANNED CITY IN THE WORLD. INDEX o About Navi Mumbai o Developments in Mumbai  Railways  Road  Water  Airport o Micro Markets.

of Mumbai and is the worlds largest planned city o 45% of Land is reserved for green zones and open to sky activity. o Navi Mumbai has well- / & Thane-Panvel Rail Route at Khandeshwar Stations & Targhar Station from Nerul-Uran Railway corridor. NAVI MUMBAI AIRPORT – IN PROCESS NAVI MUMBAI INTERNATIONAL AIRPORT NORTH NAVI MUMBAI/and other MMRDA projects in the area. Palava city is aligned with the government’s development plan to ensure integration with local land use and transportation systems. Palava is/


EPRC Berlin November 8-9, 2010 Swiss Federal Railways SBB-CFF-FFS John M Walker Chief Procurement + Supply Chain Officer Purchasing ¦ Supply Chain ¦ Production.

Chain An integrated approach... 3© SBB Infrastruktur I-ESP Konzerneinkauf 09.11.2010 SBB Swiss Railways - Purchasing ¦ Supply Chain ¦ Production Organisation Supervisory Board CEO Andreas Meyer Finance Human Resources HSEQ/ Employees -Engineering Support -Project Analysis -Product + System Testing -Other Services © SBB Infrastruktur I-ESP Konzerneinkauf 09.11.201017  Vast majority of sites were not connected into our ERP-system Situation Then Storage and Reserves - Scattered and very /


Rev:03 Induction Rail Health, Safety & Environmental “Name of Project” 1.

Sheets (TBS) When working on or near the railway line your COSS will brief you on the safe systems of work that have been set up to protect / Briefing Sheet It also provides you with the key contact details for the project Rev:0344 SITE HAZARDS – WHITEBOARDS The following hazards are applicable to site/name of site) protected site. This site is a (delete as appropriate) : Local/National Nature Reserve SSSI (Site of Special Scientific Interest) SAC (Special Area of Conservation) Don’t undertake the following /


© 2009 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.

Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys or its subsidiaries. All third party trademarks and service marks are the proprietary marks of their respective owners. Flexible, Modular Interlocking Systems for a modern railway/ between all parties Open architectures and interfaces – to allow multiple suppliers to work on projects What will happen in the future? Addition of ETCS functionality –ETCS Level 2 requires Eurobalise/


Ads by Google