Ppt on master production scheduling

DOM 301 : Operations Management Practice

promises Utilizing plant capacity effectively Attaining the firm’s strategic objectives as reflected in the production plan and Resolving trade-off between manufacturing and marketing Master Production schedule MPS INPUTS: Forecast Demand Production Costs Inventory Costs Customer Orders Inventory Levels Supply Lot Size Production Lead Time capacity Master Production schedule MPS OUTPUT (production plan): Amounts to be Produced Staffing Levels Quantity Available to Promise Projected Available Balance What/


Chapter 11 Aggregate Planning and Master Scheduling.

Period “frozen” (firm or fixed) “slushy” somewhat firm “liquid” (open) 123456789 11-32 The Master Scheduling Process Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master production schedule Uncommitted inventory Master Production Schedule Master Production Schedule 11-33 Master Scheduling Process  The master production schedule (MPS) is one of the primary outputs of the master scheduling process  Once a tentative MPS has been developed, it must be validated  Rough cut/


Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.

January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rights reserved.33 Material Master – work scheduling view Production scheduler ◦It specifies the production scheduler Production Scheduler Profile ◦It specifies production scheduler profile January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rights reserved.34 Material Master – plant data/storage view 1 General Data ◦Container Requirements  It defines the regulations that govern which type/


BW 2.x/3.0 Performance Alex Peter Product Management, SAP AG.

performance issues Collection and Extraction  SAP Content and Generic extractors Staging  PSA Loading  ODS  InfoCubes  Master Data Transformation  Transfer and update rules Other tuning aspects including..  Partitioning  Archiving  2002 SAP AG, / Load Application Create Production Orders Release Production Orders Schedule Production Accept Customer Order Confirm Delivery Build Products Explode Bill-of- Material Reserve Material Customer Service Rep Plant Personnel Production Order Customer Order /


Adeyl Khan, Faculty, BBA, NSU. Material requirements planning (MRP)  Computer-based information system that translates master schedule requirements for.

allowed or restricted. 14-31 Adeyl Khan, Faculty, BBA, NSU Capacity Planning 14-32 Develop a tentative master production schedule Use MRP to simulate material requirements Rough-cut capacity planning Firm up a portion of the MPS Is shop/ MRP is most appropriate.  Describe the inputs, outputs, and nature of MRP processing.  Explain how requirements in a master production schedule are translated into material requirements for lower-level items.  Discuss the benefits and requirements of MRP. 14-39 Adeyl Khan/


| Building the Effective Enterprise Realizing Operational Benefits With QAD Planning And Scheduling Workbenches Carianne Nieuwstraten – Sr. Product Manager,

Building the Effective Enterprise 36 Vision Realizing Operational Benefits with QAD Planning/Scheduling WBs | Building the Effective Enterprise Vision Master Schedule Material Plan Load-Leveling Constraint- Based Master Scheduler Master Scheduling Workbench Material Requirements Planning Production Scheduling Workbench Finite Capacity Production Scheduler 37 Realizing Operational Benefits with QAD Planning/Scheduling WBs | Building the Effective Enterprise 38 Summary Realizing Operational Benefits with QAD/


© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.30, May 2014 Authors Hans-Jürgen Scheruhn Bret Wagner Stefan Weidner.

Planning (SOP) 6-28 Demand Management: eEPC „Create Sales and Operations Plan“(3) Business Vocabulary PP and Data Model PPDemand ManagementBusiness Vocabulary PPData Model PP 6-33 Master Production Scheduling (MPS): eEPC „Run MPS with MRP“(3)Master Production Scheduling (MPS) 6-34 Material Requirement Planning (MRP): eEPC „ Run MPS with MRP“(3) and Business Vocabulary PPMaterial Requirement Planning (MRP)Business Vocabulary PP 6-38 Material/


Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 A Training, Leadership and Mentoring.

level Fourth level Fifth level 5 What do ALL projects have in common? Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 6 They produce specific products or “deliverables” (SCOPE) They have defined start and end dates (SCHEDULE) They consume certain resources; dollars, labor, equipment, material (COST) They have customers who have specific/


1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.

calculation technique for planning purchase and manufacturing orders according to what is needed to complete a high-level master production schedule (MPS) 3 MRP INTRODUCTION CONTINUED u For MRP to forecast future requirements accurately, other business and /–a specified number of units –in a specified period of time u Dependent demand drives MRP.... Aggregate production plan Master production schedule (MPS) Material Resource Planning System (MRP) Inventory record file Bill of material (BOM) file Reports /


© SAP AG Sales and Distribution (SD) SAP University Alliances Authors Hans-Jürgen Scheruhn Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP7 Global Bike.

Data Accounting Data Storage Data Quality Data SAP ERP Page 4-15 Sales Org. UW00 Sales Org. UE00 Material Master Client XXX General Information relevant for the entire organization: Name Weight Unit of Measure Sales specific information: Delivering Plant /: customer data, total cost of the order -Line Item(s) Information about the specific product: Ex: material and quantity, cost of an individual line -Schedule Line(s) Uniquely belongs to a Line Item, contains delivery quantities and dates for partial /


Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration Fall, 2015.

checks availability and generates requirements for materials planning January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rights reserved. 29 Material Master – Work Scheduling View Only for finished products and semi-finished materials Production scheduler ◦It specifies the production scheduler Production Scheduler Profile ◦It specifies production scheduler profile January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rights reserved. 30 Material/


Chapter 13 MRP and ERP.

of time intervals during which order changes are allowed or restricted. resource requirements MRP Planning Develop a tentative master production schedule Use MRP to simulate material requirements Convert material requirements to resource requirements Firm up a portion of the /Inputs (BOM), Processing, Outputs Benefits and requirements Capacity planning MRP-II and ERP Practice Questions 1. The master production schedule states which end items are to be produced both when and how many. Answer: True Page: 577 2/


Introduction to Management Accounting: The Master Budget

plan promotes coordination and communication helps managers evaluate performance motivates employees to achieve company goals Components of the Master Budget Inventory Budget ____ ____ Sales Budget ____ ____ Purchases Budget ____ ____ Cost of Goods Sold Budget/ a company. Sales Budget (Schedule A) Sales revenue is the key measure of business activity. The budgeted total sales revenue for each product is the sales price multiplied by the expected number of units sold. Sales Budget (Schedule A) Oct. Nov. Dec/


Overview Dependent demand Dependent demand Master production schedule Master production schedule Bill of materials Bill of materials MRP MRP Time-phased.

& Raw Materials Method of Estimating Demand Forecast & Booked Customer Orders Calculated Planning Method EOQ & POQMRP Dependent vs. Independent Demand Requirements for Effective Use of Dependent Demand Inventory Models master production schedule master production schedule specifications or bills-of-material specifications or bills-of-material inventory availability inventory availability purchase orders outstanding purchase orders outstanding lead times lead times Cooperstown Cars, Inc. Produces toy cars/


PRODUCTION PLANNING AND

and all other requisites of production. Scheduling means" fitting specific jobs into a general time table so that order may be manufactured in accordance with contracted liability or in mass production, so that each component may arrive at and enter into assembly in the order and as is required." -ALFORD AND BEATY Types of schedules Master scheduling: Scheduling starts with the master schedule. this schedule is prepared by keeping in/


Chapter 13 Production Planning. Chapter 13 Production Planning.

Planning and Control Systems Very-Short-Range (hours - days) Pond Draining Systems Push Systems Pull Systems Focusing on Bottlenecks Production Planning: Units of Measure Entire Product Line Long-Range Capacity Planning Aggregate Planning Product Family Specific Product Model Master Production Scheduling Production Planning and Control Systems Labor, Materials, Machines Pond Draining Systems Push Systems Pull Systems Focusing on Bottlenecks Aggregate Planning Why Aggregate Planning Is Necessary Fully/


Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.

Saddle River, N.J. 07458 13-10 Relationships of the Aggregate Plan Aggregate Plan for Production Demand Forecasts, orders Master Production Schedule, and MRP systems Detailed Work Schedules External Capacity Subcontractors Inventory On Hand Raw Materials Available Work Force Marketplace and Demand Research and Technology Product Decisions Process Planning & Capacity Decisions Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004/


Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.

customer demands. Market Environment Forecast and customer order Resource base and technology Capacity (facilities, material, labour and capital) Aggregate Production Plan Master Production Schedule Material Requirements Capacity Requirements Flowchart of Aggregate plan and Master Production Schedule Steps in Aggregate Capacity Planning Prepare the sales forecast for each product that indicates the quantities to be sold in each time period. Sum up the individual forecast into one aggregate demand/


Zanussi & Cybertec Meeting. CYBERTEC - The Planning and Scheduling Company Meeting Agenda About Cybertec The CyberPlan Planning & Scheduling Suite Cybertec.

SW Houses Universities Arthur Andersen Atos Consulting IBM JDE ORACLE SAP Orsi... CYBERTEC - The Planning and Scheduling Company The CyberPlan Planning & Scheduling Suite SCD Supply Chain Designer MPS Master Production Schedule MRP Material Requirements Planning CRP Capacity Requirements Planning FCP Finite Capacity Planning FCS Finite Capacity Scheduling CYBERTEC - The Planning and Scheduling Company Planning: designing for performances! To meet the market requested performance ( service level, lead times/


OH 9-1 Agenda Test 1 – Handout & questions Chapter 8 Controls in Beverage Purchasing, Receiving, Storing & Issuing Chapter 9 Controls in Beverage Production.

benefits Employee turnover Federal Insurance Contributions Act (FICA) Job description Labor contract OH 9-53 Key Term Review continued Labor cost Labor cost percent Master schedule Medicare Overtime Payroll dollars Person-hour Productivity standard Quality standard Return chart OH 9-54 Chapter Learning Objectives— What Did You Learn? Distinguish between fixed, variable, and semi- variable costs. Explain how payroll cost, FICA, Medicare, and/


Module 10 Setup for Production.

things like: When production orders are released for production (upon creation, for example). When production orders are scheduled (on release, for example). Production Scheduler Similar to the MRP Controller, a Production Scheduler must be defined in the SAP system to control detailed production scheduling for a material. A production scheduling profile is assigned to the Production Scheduler, and the Production Schedule is defined in the Work Scheduling view of the Material Master. Material Availability/


Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.

, which order can be moved? Labor / machine resources not available for 2 nd shift – what are you going to do about this? Common Planning & Scheduling Situation The QAD Solution QAD Planning and Scheduling Workbenches CRP Master Scheduling Master Scheduling Flow Discrete Scheduling Repetitive Scheduling Production Scheduling Flow Period - > Month - > Week - > Day - > Shift - > Interval - > hour Initial plan is created by MRP Demand Received Balance demand / supply /resources to ensure a feasible/


Manufacturing Product Strategy and Direction Bengt Johansson, CPIM Product Architect Nicole Groves, CPIM Business Analyst Manufacturing R & D.

Enterprise Manufacturing Product Strategy and Direction 6 Master Scheduling Workbench ( MSW ) -Aligns Demand and Supply throughout the Planning Horizon Highlights Supply Shortages Calculates Projected Inventory -Calculates and Monitors Workload Capacity Highlights Overloads -Provides Access to Processes and Information to Put Decisions into Action Shows Immediate Effects Making Better Planning / Scheduling Decisions Manufacturing Product Strategy and Direction 7 Production Scheduling Workbench ( PSW/


14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Master Production Schedule (MPS)  The MPS states what products are to be produced  Also.

report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software) 14 - 6 MRP benefits come from..  Forecasting of demand for parts is dependent on demand for final/


Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

” (firm or fixed) “slushy” somewhat firm “liquid” (open) 123456789 Instructor Slides 11-33 Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master production schedule Uncommitted inventory Master Production Schedule Master Production Schedule Instructor Slides 11-34 The master production schedule (MPS) is one of the primary outputs of the master scheduling process Once a tentative MPS has been developed, it must be validated Rough cut capacity planning (RCCP) is a tool used in/


Production Activity Control “The time comes when plans must be put into action”

on time Control detailed the flow of orders through –manufacturing –Carrying out the plan –Controlling the work as it progresses to completion Manage day-to-day activity and provide support Production Planning Master Production Scheduling Material Requirements Planning Production Activity Control Purchasing Input/ Output Control Operation Sequencing Planning Implement and Control Figure 6.1 Priority planning and/


1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.

to-order environments 4 DSCI 3123 MRP Inputs & Outputs Master Production Schedule Material Requirements Planning Planned Order Releases Work OrdersPurchase OrdersRescheduling Notices Product Structure File Inventory Master File 5 DSCI 3123 MRP Inputs Master production schedule Product structure file Inventory master file 6 DSCI 3123 Master Production Schedule Drives MRP process with a schedule of finished products Quantities represent production not demand Quantities may consist of a combination of customer/


Insert your company logo here (on slide master). Insert your company logo here (on slide master) Developed by the Department of Communications, Information.

lawyer – not driven by the developer. Cont/.. Insert your company logo here (on slide master) Building – Developing the website The development contract Description of the products/services to be delivered Maintenance and support Project management procedures Warranties Stages of the project, deliverables & exit clauses Penalty clauses Payment schedule, terms & conditions Insurance Variations to the agreement Dispute resolution Intellectual property Termination Issues that should/


Operational Excellence Demand Management and Master Scheduling.

we think they Want ? Vas Dem MPS - 28 © The Delos Partnership 2004 Master Production Scheduling MRP and CRP without a Master Schedule leads to Chaos at the speed of light Use Firm Planned Orders to control the plan Master Scheduling software identifies imbalance and recommends action Vas Dem MPS - 29 © The Delos Partnership 2004 Master Schedule Vas Dem MPS - 30 © The Delos Partnership 2004 12345 as MPS Item Vas/


© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart1 of 122 C HAPTER 12 The Production Cycle.

available levels to determine amounts to be purchased. © 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart23 of 122 PLANNING AND SCHEDULING Key documents and forms: –Master production scheduleProduction order Authorizes production of a specified quantity of a product. It lists: –Operations to be performed –Quantity to be produced –Location for delivery Also collects data about these activities, © 2008 Prentice Hall Business Publishing/


1 Material Requirements Planning or as we in the business like to call it - MRP Computer Based Production Planning and Inventory Control System Scientific.

Manufacturing 4 Basic Definitions MRP (Materials Requirements Planning). MRP is the basic process of translating a production schedule for an end product (MPS or Master Production Schedule) to a set of requirements for all of the subassemblies and parts needed to make that / capacity planning Time-phased Purchase orders The MRP System Customer orders planned-order releases 14 Input 1 - Master Production Schedule This is the forecast for the sales of the end item over the planning horizon. The data sources/


© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart1 of 122 C HAPTER 12 The Production Cycle.

available levels to determine amounts to be purchased. © 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart9 of 122 PLANNING AND SCHEDULING Key documents and forms: –Master production scheduleProduction order Authorizes production of a specified quantity of a product. It lists: –Operations to be performed –Quantity to be produced –Location for delivery Also collects data about these activities, © 2008 Prentice Hall Business Publishing/


1 January, 2006 February, 2006 New Product Platform Functional Decomposition: To Be State.

Members’ individual My Activities home pages. 85 January, 2006 February, 2006 5.14 Production Calendar Context Diagram Outputs ProcessInputs Production Calendar Process On Calendar change, recalculate Master Calendar On recalculation, alert Team Members whose Campaigns/Programs are altered by the change Production Calendar Datastore Production Schedule Display change On My Activities Display Production Calendar 86 January, 2006 February, 2006 5.15 Client Management News 5.15 Team/


COST MANAGEMENT BASICS COST PLANNING. Agenda Explanation of Cost & Cost Planning Computing Rates Measuring Performance Master Data Identifying Requirements.

performance measures for activities that require multiple tasks 2.Designing performance measures for activities done in teams Master Data 40 Master Data: Activity Types An Activity Type represents a group of resources within a Cost Center. These / which is based on the sales forecast Schedule 1 (in thousands) 98 Starting point for ‘Production’ budget Starting point for ‘Marketing Expense’ budget Goes to ‘Budgeted Income Statement’ Preparing the Operating Budget Schedule 2 (in thousands) 99 Starting point /


Page 7 Project AIS Online Production Cycle Information System & ERP System Team members in order of appearance: Rie Rios Alex Sanjur Hai Do Lili Azimi.

status reports Performan ce reports Productio n status reports Cost Analyses Instructions and schedules Sales Production Planning EngineeringCost Accounting Inventory Factory Workstations Production Cycle Databases Sales Production Planning Cost Accounting Factory Supervisor Online Production Cycle Information System Bill of material s Operations list Master Production schedule Inventory Production orders Work in Progres s Specifies the part number, description, and Quantity of each component used/


Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP: Distribution Requirements Planning MPS: Master Production Schedule MRP: Materials Requirements Planning PAC: Production Activity Control S&OP: Sales and Operations Planning The Big Picture Master Scheduling I Controls the timing and quantity of production for products or product families Primary interface point for actual customer orders Coordinates forecasted demand and actual orders with/


Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.

,9003,5002,800 To Produce4,6002,3004,6002,300 Planned order release4,6002,3004,6002,300 Safety Stock2,4001,8002,4001,8002,4001,800 Master Production Schedule Product:Heineken 60 clLeadtime:1 week Safety stock:3 days Order Quantity2,300 8 Master Production Schedule Planned Available week 1: 10,00 – 4,000 = 6,000 Safety stock should be 2,400, so no order Week 01234567 Gross requirement4/


1DSCI4743 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.

calculated should not be forecast 55DSCI4743 MRP Inputs & Outputs Master Production Schedule Material Requirements Planning Planned Order Releases Work OrdersPurchase OrdersRescheduling Notices Product Structure File Inventory Master File 66DSCI4743 MRP Inputs Master production schedule Product structure file Inventory master file 77DSCI4743 Master Production Schedule Drives MRP process with a schedule of finished products Quantities represent production not demand Quantities may consist of a combination of/


1 Introduction to Operations Management Aggregate Production Planning (APP) (Ch. 13) and Material Requirements Planning (MRP) (Ch. 14) Hansoo Kim ( 金翰秀.

plan? Is capacity plan being met? Is execution meeting the plan? 30 AP->MPS 1,2001,500 Aggregate Production Plan Aggregate Production Plan (shows the total quantity of amplifiers) 100300 75 watt amplifier 450 500 150 watt amplifier 100 240 watt amplifier Master Production Schedule Master Production Schedule (Shows the specific type and quantity of amplifier to be produced) 8 7654321Weeks FebruaryJanuaryMonths 31  제품을 만드는데 필요한 부품의 종류와 수량을 기 록한 자료구조  제품의 구조를 Tree 형식으로 나타낸다 Parents: 상위 레벨 제품들  Items/


I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.

) Integrated Master Schedule (IMS): An integrated networked schedule containing all detailed planning and work packages Describes the execution of the project; estimates completion Event-driven, but calendar-based – NOT calendar driven Assists in determining projected and actual cost estimates (Earned Value Management – EVM) Contains tasks to support development of products Contains interdependent tasks, events, and accomplishments to meet established criteria Directly traceable to the/


Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.

must be prepared or “produced” Based on “production runs” from a “production schedule” (menu) Menus can be scheduled by period (date) or event PRE-PREP Check can be used to analyze stock levels first PREPARE will deduct raw materials and create final products MenuWriter The Production Menus – Usage Design your Production Menu the same way as the Master Menu MenuWriter The Production Menus – Setup Analyze each ingredient to see/


1 MRP and ERP Chapter 14. 2 Transparency on aggregate to master plan.

plan Problems? Rough-cut capacity planning Rough-cut capacity planning Yes No Yes No Finance Marketing Manufacturing Adjust production plan Adjust production plan Master production schedule Master production schedule MRP Capacity planning Problems? Requirements schedules Requirements schedules Adjust master schedule MRP II 27 Enterprise resource planning (ERP): –Next step in an evolution that began with MPR and evolved into MRPII –Integration of financial, manufacturing, and human resources on a single/


I2 U Intelligent Supply Chain Management Course Module Eight: Master Supply Planning.

sends updated requirements to its suppliers © 2001 i2 Technologies Inc CONFIDENTIAL 6 7 The Problem: Planning Through DRP and MRP II in Sequential Steps Loops adjusting production plan Loops adjusting master schedule Yes No Market demand Master production schedule Requirements schedules Production plan Rough-cut capacity planning Problems ? MRP run Capacity planning Problems ? Yes No Top down MRP II planning process Week 2Week 4 Week 1Week 3Week 5/


1. Advances in Supply Chain Management Part 2 Chapter 8 : Master Planning 2.

the short-term planning modules because they need to be calculated under the consideration of an entire seasonal cycle. Production capacities are input to Production 25 Cont…. Planning and Scheduling. Seasonal stocks, at the end of each Master Planning bucket, provide minimum stock levels in detailed scheduling. Capacity extensions need to be decided during the frozen period as they often cannot be influenced in/


Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.

Production scheduler ◦Planner group ◦Person responsible (financially) Non-plant specific organizational units ◦ Capacity planner January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2007. All rights reserved. 8 BPI PP master data January 2008 © SAP AG - University Alliances and The Rushmore Group, LLC 2007. All rights reserved. 9 PP Master Data PP Master Data for Production Planning Material Bill of Materials (BOM) Work Center/


Music Production Agreement Rachel Lerner Sports and Entertainment Law August 2008.

Additional artists (rights) Use (commercial broadcast/CD) Use (commercial broadcast/CD) Management/Schedules/Budgets Management/Schedules/Budgets Internal communication of rights Internal communication of rights Music Production Agreement Production of original musical score and master recording Production of original musical score and master recording Toyco Ownership Toyco Ownership -©music composition -©master recording -all third party contributions Toyco Property Toyco’s trademarks, patents, copyrights/


© 2006 Prentice Hall Business Publishing Accounting Information Systems, 10/e Romney/Steinbart1 of 122 C HAPTER 12 The Production Cycle.

available levels to determine amounts to be purchased. © 2006 Prentice Hall Business Publishing Accounting Information Systems, 10/e Romney/Steinbart23 of 122 PLANNING AND SCHEDULING Key documents and forms: –Master production scheduleProduction order Authorizes production of a specified quantity of a product. It lists: –Operations to be performed –Quantity to be produced –Location for delivery Also collects data about these activities © 2006 Prentice Hall Business Publishing/


© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart1 of 122 L ECTURE 11 The Production Cycle.

available levels to determine amounts to be purchased. © 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart22 of 122 PLANNING AND SCHEDULING Key documents and forms: –Master production scheduleProduction order Authorizes production of a specified quantity of a product. It lists: –Operations to be performed –Quantity to be produced –Location for delivery Also collects data about these activities, © 2008 Prentice Hall Business Publishing/


© 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart1 of 122 C HAPTER 12 The Production Cycle.

available levels to determine amounts to be purchased. © 2008 Prentice Hall Business Publishing Accounting Information Systems, 11/e Romney/Steinbart23 of 122 PLANNING AND SCHEDULING Key documents and forms: –Master production scheduleProduction order Authorizes production of a specified quantity of a product. It lists: –Operations to be performed –Quantity to be produced –Location for delivery Also collects data about these activities, © 2008 Prentice Hall Business Publishing/


Production Planning Master Data EGS 5620 Enterprise Systems Configuration Spring, 2016.

Miscellaneous Assembly Packaging Inspection Assembly Packaging Inspection (Work Center Location) Organization Data Plant-specific organizational units ◦MRP controller ◦Production controller ◦Production scheduler ◦Planner group ◦Person responsible (financially) Non-plant specific organizational units ◦ Capacity planner 8 BPI PP master data 9 PP Master Data PP Master Data for Production Planning Material Bill of Materials (BOM) Work Center Routing 10 Material Data (Review) Definition ◦Physical objects to buy/