Ppt on mars one program

Presented By: Shaun Dolk PMO-5 Workshop 20-24 July, 2015 Viña Del Mar, Chile Deployment of Oceanographic Instruments - Barometer Upgrade & VOS Donation.

Promote Awareness Con Unreliable Routes Logistic Restraints Drifting Buoys PMO-5 Workshop 20-24 July, 2015 Viña Del Mar, Chile Instrumentation The Global Drifter Program (GDP) is the principle component of the Global Surface Drifting Buoy Array, a branch of NOAAs Global Ocean/ Barometer Upgrade Program PMO-5 Workshop 20-24 July, 2015 Viña Del Mar, Chile Since the beginning of the DBCP, it has tried to combine the sensors on drifting buoys to be useful for meteorology and oceanography. One way to do this is /


MArS - AHEAD Webinar Reimbursement of Innovative Medical Devices in Germany Agency for Health Economic Assessment and Dissemination.

for examination or treatment can be discussed in the Federal Joint Committee (G-BA), an application must be made by one of the G-BA members Such an application may be made by the neutral members of the G-BA, the / potential in a patient population with a high unmet medical need in order to be eligible for reimbursement under the Experimental Coverage program. MArS - AHEAD 24 There are several opportunities to obtain reimbursement for an innovative medical device in Germany but there are great difference/


Intraprocedural Dataflow Analysis for Software Product Lines

in-sensitive (A1) vs feature sensitive (A2, A3, A4) Results: A1 vs A2 vs A3 vs A4 (in theory and practice) Related Work Conclusion Introduction Traditional Software Development: Product Line: One program = One product Product Line: A ”family” of products (of N ”similar” products): 1x CAR = 1x CELL PHONE = 1x APPLICATION = CARS CELL PHONES APPLICATIONS customize SPL: (Family of/


Mars Climate Orbiter Team Magna Corp: Tim Toba Mohamed Sahil Nyema Johnson Abner Yemaneab University of Minnesota.

launched. Perform daily recording of the sound and images of Mars for one Martian year (687 days). The Purpose of the mission is to gather atmospheric data of each of the seasons on Mars. The missions projected end date is December 1, 2004. Scope Time Management of the Mars Climate Orbiter Feb 7, 1994: Program Started. May 1, 1995: Project Manager Named.  JPL names John/


Normalized Difference Vegetation Index (NDVI) 1. Today’s Goal Rancher’s in New Mexico need an insurance program for their grazing and haying perils RMA.

New Mexico, and Utah NO CHANGES ARE MADE TO THE PROGRAM AFTER THE CONTRACT CHANGE DATE (CCD) (6/30) 17 18 VI – Program Overview Index Intervals Crop Year divided into 10, 3-month index intervals Must select at least one interval Currently can select up to 4 intervals Crop Practice /69 2010 Aug/Sep RI 2010 Sep/Oct 70 2010 Oct/Nov RI 2010 Nov/Dec 71 RI 2011 Jan/Feb 73 2011 Feb/Mar RI 2011 Mar/Apr 74 2011 Apr/May RI 2011 May/Jun 75 2011 Jun/Jul RI January, February, March Interval -Results Released February, /


After School Programs Welcome Staff!

28-Oct 13 Risks & Consequences Oct 16-Dec 8 Dollars & Sense Dec 11-Feb 9 From Mystery to Medicine Feb 13-Mar 23 Surviving Mar 26-May 18 Changing America May 21-Jun 7 Communication 5th Grade Themes Dates Theme Aug 28-Oct 6 Cooperation &Competition Oct /plan ready for days missed Tardy Policy Call Site Lead prior to program- regardless of how late you are Loss of pay for missed time Staff Quotes (from our interviews)… What “teamwork” means to us: Be One…Work together to reach a goal that you are all working /


Mars Technology Program 6/3/20151 FINDINGS OF THE Moon  Mars SCIENCE LINKAGES SCIENCE STEERING GROUP (MMSL- SSG) Chip Shearer and David Beaty (co-chairs),

a Unique Vantage Point for Solar System Exploration Cornerstone for Early Planetary Processes Preserves the remnants of one style of planetary differentiation: Magma Ocean. Illustrates a style of early planetary asymmetry that is related / to our ability to correctly plan and successfully implement the future Mars exploration program. 2. Timing: Importance that these measurements/demonstrations be carried out by the lunar robotic program prior to 2020. 3. Cost: General affordability of these measurements/


Mar. 2007Computer Architecture, Input/Output and InterfacingSlide 1 Part VI Input/Output and Interfacing.

Systems Figure 21.13 The structure of a closed-loop computer-based control system. Mar. 2007Computer Architecture, Input/Output and InterfacingSlide 30 22 Input/Output Programming Like everything else, I/O is controlled by machine instructions I/O addressing (memory/interrupts. 3. Save minimal information about the interrupt on the stack. 4. Enable interrupts (or at least higher priority ones). 5. Identify cause of interrupt and attend to the underlying request. 6. Restore CPU state to what existed before /


Spring 07, Mar 1, 6 ELEC 7770: Advanced VLSI Design (Agrawal) 1 ELEC 7770 Advanced VLSI Design Spring 2007 Timing Simulation and STA Vishwani D. Agrawal.

each gate PI transitions assumed to occur without time skew Spring 07, Mar 1, 6ELEC 7770: Advanced VLSI Design (Agrawal)13 Circuit Outputs  Each path can potentially produce one signal transition at the output.  The location of an output transition/. 17, no. 1, pp. 25-35, August 1994.  Find worst-case delays from an input to all outputs.  Linear programming methods. Spring 07, Mar 1, 6ELEC 7770: Advanced VLSI Design (Agrawal)30 References  Delay modeling, simulation and testing:  M. L. Bushnell and V. /


Mar. 2007Computer Architecture, Memory System DesignSlide 1 Part V Memory System Design.

want a memory unit that: Can keep up with the CPU’s processing speed Has enough capacity for programs and data Is inexpensive, reliable, and energy-efficient Mar. 2007Computer Architecture, Memory System DesignSlide 4 17 Main Memory Concepts Technologies & organizations for computer’s main memory/10s or even 100s of ns Memory bandwidth limits the instruction execution rate Each instruction executed involves at least one memory access Hence, a few to 100s of MIPS is the best that can be achieved A fast buffer/


Spr 2015, Mar 13... ELEC 5200-001/6200-001 Lecture 8 1 ELEC 5200-001/6200-001 Computer Architecture and Design Spring 2015 Microprogramming (Appendix D)

... ELEC 5200-001/6200-001 Lecture 8 28 Microprogram for jump Instruction LabelALUSRC1SRC2Reg.Mem.PCWriteSeq. ctrl.ctrl.ctrl. JUMP1 Jump addressFetch Microprogram consists of one microinstruction. Spr 2015, Mar 13... ELEC 5200-001/6200-001 Lecture 8 29 μProgram for Multi-Cycle CU LabelALUSRC1SRC2Reg. Mem.PCWriteSeq. ctrl.ctrl.ctrl. FetchAddPC4 Read PCALUSeq Decode1AddPCExtShftRead Disp. 1 LWSW1AddAExtend Disp. 2 LW2 Read ALUSeq RegWr Write/


GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, 2003 5BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.

Multi-Chip Modules (MCMs) and other devices as required –Life Testing if Quality Conformance Inspection (QCI) data within one year of the lot being procured is not available –No pure tin, cadmium, and zinc plating is allowed –Vendor surveillance where/ class 3. Coupons shall be submitted to GSFC for evaluation. GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, 2003 5BNick Virmani 18 Electronic Packaging Program PWB Coupon will be analyzed by GSFC prior to flight assembly. Particular attention will be paid to /


HMI/AIA Operations; Page 1JSOC Peer Review – Mar 17, 2005 HMI & AIA JSOC Operations Health Monitoring and Control J. Drake, LMSAL R. Chevalier, LMSAL R.

Mar 17, 2005 MOC Interface: Loads (2 of 3) Frequency –Kernel and object files are not expected to be reloaded Can be reloaded if a change is necessary –Scripts and tables Changed infrequently (maybe one per week as needed for science observations) Tools –One program/change should be considered HMI/AIA Operations; Page 40JSOC Peer Review – Mar 17, 2005 HMI Operations: Anomalous Conditions Notify immediately –FOT –Program management Place instrument in safe mode Document the emergency Call for whatever /


1 Surviving in space: the challenges of a manned mission to Mars Lecture 3 Modeling the Interaction of the Space Radiation in Spacecraft & Humans, and.

to Mars President Bush has committed the US Space Program to going to Mars… The first step will be a return to the Moon to develop and test the techniques needed eventually to go to Mars… Crew radiation exposure has been identified as one of /. Pinsky Modeling the Interaction of the Space Radiation in Spacecraft & Humans, and Assessing the Risks on a Mission to Mars 11 From NASA 1996 Strategic Program Plan CERN Course – Lecture 3 October 28, 2005 – L. Pinsky Modeling the Interaction of the Space Radiation in/


Exploration Systems Mission Directorate NASA Update 2004 MAPLD International Conference Jim Nehman Deputy Associate Administrator Development Programs.

& Technology Jupiter Icy Moons Orbiter Capability Development Research &Technology Development 9 Constellation Program Acquisition Strategy Overview (Baseline) 2015 (Objective) 2020 (Threshold) Target Moon OSP NGLT Mars Prometheus MS C Crewed CEV Flight 2014 MS B Program Initiation FY06 System Development & Integration Down Select Design Readiness Review /Demo 2008 / and leadership – recent successes and demonstrated management reforms – We have the passion and commitment to succeed - One Step at a Time


Hershey’s vs. Mars Irini Bua Stephanie Deodat Sawhill Busre Charlie DiMaggio Piji Chen Karina Moscoso MGT 250.

. Strengths Large global presence Named one of best companies to work for Diverse products High brand preference to consumers (M&M) Big community involvement Mars Inc. Weaknesses Lack of innovation to create new candy bars Too many products Milky Way’s has low sales percentage on U.S Private-owned Company Management – Hershey’s Invest in programs and education that enable employees to/


2 Table of Contents  Executive Summary  Consumer Insights and Trends  Program Details  Merchandising Recommendations  POS Materials  Marketing Support.

Qualitative Executive Summary PerformanceLast OrderFirst DeliveryLast Delivery 12/23/12-2/10/131/11/1312/3/121/18/13 Program Highlights: Mars Chocolate official Super Bowl sponsorship translates easily into strong retail executions that enhance in-store presence and maximize off/IC Program Details To help stimulate consumer purchase of their favorite Mars brands, all IC displays in the program will be shipped with coupon tear pads pre-assembled on the display. Tear pad offers will be ‘Buy Two Get One Free’!/


Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.

on the Hill August 6 – One Year Anniversary of Curiosity Landing on Mars September 6 – LADEE launch from Wallops Flight Facility, VA October 1 – Close approach of Comet ISON to Mars October 30 – Mars2020 enters Phase-A/Mars Late Summer - Curiosity arrives at Mt. Sharp September 21 - MAVEN inserted in Mars orbit October 19 – Comet Siding Spring encounters Mars Fall – Discussion with Indian Space Research Organization (ISRO) on next steps in their Mars program after successful MOM insertion/operations at Mars/


September 12, 2014 MARS: EMERGING TECHNOLOGIES IN REFERENCE SECTION NEW CHAIRS ORIENTATION & EXCOMM MEETING.

@usf.edu  Chanitra Bishop (with Cathy Larson), MARS-L Moderator  Joelle Thomas/Members at Large, Web Coordinator WELCOME MARS Committee Chairs  Best Free Web SitesAshley Rosener & Janice Wilson, Co-Chair  Conference Program PlanningBeth Boatright, Chair  Hot Topics in E-Reference/Pages are listed at: http://www.ala.org/rusa/sections/mars/marssection/marscomm/committees. http://www.ala.org/rusa/sections/mars/marssection/marscomm/committees  It is one of the roles of the committee to keep your committee /


March 27, 2002 LEGO LEGO K-12 Math/Science Projects of Linda Hamilton From Here to Mars and Back with.

pages/vi while they looked through the pictures and descriptions of the scenarios. Others wrote or changed programs using the RoboLab they had. In one room they also watched and operated the CITY with Red Rover soft ware. See instructions to try/opposite side. Red Rover Teleoperation Install software for earth site or buy and use Mars site CONNECT to Lego.marshall.edu Use direction buttons to operate Run programs Programming over the Internet LEGO CITY SENSORS CITY SENS RS Science and Engineering NASA Site /


Infor Confidential Template V.24, 1-Mar-2007 Bruce Gheesling – Sr. V.P GAS March 20, 2007 David Berger; Contributing Editor, Plant Services magazine –

Challenges in Working with Metrics  Too few or incorrect metrics that don’t trade off  Improvement in one may result in deterioration of another  Too many measurements  No focus across the organization  Expensive to collect/Maintain and Change Capital Infrastructure  < Energy Intensity & CO 2  GAS Programs It is envisioned that this is a continuous improvement process to ensure long term sustainability. Template V.24, 1-Mar-2007 22Copyright © 2001-2007 Infor Global Solutions … to improve a company’s /


Program Management Review Dr. William F. Denig, Chief Solar (and) Terrestrial Physics Division NOAA/NESDIS 303 497-6323 03 April.

constructed area grid cover about a third of the USA was obtained from the USGS. This was aggregated to a one km grid and a statistically significant relationship was found for predicting constructed area using radiance calibrated nighttime lights. EOG is now/.noaa.gov/stp/IONO/ionohome.html http://www.ngdc.noaa.gov/stp/IONO/ionohome.html Cognizant Person: Rob Redmon Program: Space Weather Updated: 28 Mar 06 64 STP PMR – 03 Apr 2006 Accomplishments Space Environment Group SPIDR 4.0 Testing on-going, planned/


Programming Models Cloud Computing Garth Gibson Greg Ganger Majd Sakr Raja Sambasivan G. Gibson, Mar 3, 20141.

one server o No interaction between customers (unless inventory near exhaustion) Parallelism is more cores running identical copy of web server Load balancing, maybe in name service, is parallel programming o Elasticity needs template service, load monitoring, cluster allocation o These need not require user programming, just configuration G. Gibson, Mar/over other updates because these communicate more information more quickly G. Gibson, Mar 3, 201421 One way to think about scheduling 22 1 1 1 1 Thread 1 /


Computer Architecture Lecture 2: Processor, program cycle, interrupts, system bus Piotr Bilski.

7 – range of bits of the memory word or registry, used in the operation For instance: MAR  PC MBR  M(MAR) Instruction fetching cycle Program counter (PC) stores address of the next instruction to acquire (at the beginning it is so called/. Saving argument Instruction executed, fetch the next one Many arguments Many results No interrupts Return to data Interrupts Mechanism allowing to disturb the original execution order by the other system components Programmed –For example, overflow, divide by zero Clock/


Sheri Lynn Lemon - 30 Mar 2010 - Logan Utah Regional Family History Center Programs That Sync with New FamilySearch Ancestral Quest Family Insight Legacy.

updated regularly and all updates for the same version number are free. Sheri Lynn Lemon - 30 Mar 2010 - Logan Utah Regional Family History Center Which Is Right For Me? Each program has online “Getting Started with NFS” tutorials. View each one to see which fits your needs the best.  New FamilySearch - https://new.familysearch.orghttps://new.familysearch.org Select Help Center, Training & Resources/


Outreach Workshop (Mar. 1, 2002)Paul Avery1 University of Florida Global Data Grids for 21 st Century.

Event is ~1 MByte in size Physicists work on analysis “channels”. Each institute has ~10 physicists working on one or more channels Physics data cache ~PBytes/sec 2.5 Gbits/sec Tier2 Center ~622 Mbits/sec Tier 0/application to other sciences via “Virtual Data Toolkit”  Strong outreach program è Multi-year project  R&D for grid architecture (funded at $11.9M +$1.6M)  Integrate Grid infrastructure into experiments through VDT Outreach Workshop (Mar. 1, 2002)Paul Avery27 GriPhyN Institutions  U Florida  U /


The Australian Outback as a Testing Ground for Future Mars Missions Visions in the Desert.

Based in Fremantle, Western Australia Project Manager - Dr Graham Mann Project one of 3 to secure seed funding in 2000 Mars Society design competition Sponsored by Starchaser Industries Design Approach Analogue of a pressurised/- August 1-28, 2004 - 1 month, comprising 4 different week long phases - analysis of results also continuing Research Program Geology – Field survey mapping of surrounding Biology – Microbiology & Extremephile studies Engineering – Dataloggers, Suits, MarsOz site selection Psychology/


Computing & Information Sciences Kansas State University Wednesday, 12 Mar 2008CIS 560: Database System Concepts Lecture 21 of 42 Wednesday, 12 March 2008.

et al., 5 th edition More on Online Databases Discussion: Server-Side Programming in JSP Computing & Information Sciences Kansas State University Wednesday, 12 Mar 2008CIS 560: Database System Concepts Server-Side Scripting Server-side scripting simplifies the/ cust-loan Computing & Information Sciences Kansas State University Wednesday, 12 Mar 2008CIS 560: Database System Concepts Granting of Privileges The passage of authorization from one user to another may be represented by an authorization graph. The/


Workshop to Support Mars Human Precursor Radiation Measurements on the Surface of Mars Dr. Ron Turner October, 2005.

LaRC (4) –NASA JSC (4) –NASA MSFC (2) –Los Alamos National Lab (2) Program Coordination –Mars Program Office (1-2) –Radiation Program (1-2) –Science and Exploration Directorates (2-3) Key Questions, Major Objectives After accounting for differences/ and H 2 O Ice Mars Atmosphere –Composition –Altitude variations –Temporal variations Diurnal, Seasonal –Dust loading, water vapor Overview of Radiation Transport Techniques and Applications to Mars Surface Day One Afternoon Mars Surface Models – Assumptions and /


New Directions in Oceans Management An overview of current thinking Bob O’Boyle Bedford Institute of Oceanography Dartmouth, Nova Scotia SUMBER: www2.mar.dfo-mpo.gc.ca/.../rap/.../oboyle....‎Fisheries.

& Control Act – New state legislation (Oceans Acts) in California & under development in Massachusetts, Oregon & New Jersey SUMBER: www2.mar.dfo-mpo.gc.ca/.../rap/.../oboyle....‎Fisheries and Oceans Canada Overarching Policy Canada – 2002 Oceans Strategy EU – 6th Environmental Action Program has seven Thematic Strategies, one of which is EU Marine Thematic Strategy (EMS) for Protection & Conservation of European Marine Environment (under development) – Integrates/


MEPAG Goal IV Update 20101 A reevaluation of the robotic precursor objectives and priorities related to preparation for the human exploration of Mars March.

–Deanne RogersStony Brook –Teresa SeguraNorthrop Grumman Ex-officio –Dave BeatyMars Program Office –Charles BudneyMars Program Office Goal IV Revision: Informed by Mars DRA 5.0 and MEP Results 3 Mars Design Reference Architecture 5.0 (2009) ESMD SMD SOMD ARMD Non/ program (including analysis of returned samples), and to what degree of accuracy and precision, in order to realize this benefit? Map the distribution of naturally occurring surface special regions as defined by COSPAR (see note below). One /


REC 2910 Periodization & Program Design. General Adaptation Syndrome 3 Responses to Training Stress *Shock or Alarm Phase *Resistance Phase *Exhaustion.

, assisted/upper & lower body push & pull/supesets & compound set Program Design *Various Training Loads one rep max/predicted one rep max loads based on training goals (hypertrophy/power/endurance/strength) */PROGRAM SPORT SCHEDULE MACROCYCLE MICROCYCLE MESOCYCLE Feb 21 Feb 22 Feb 23 Feb 24 Feb 25 Feb 26 Feb 27 Feb 28 Feb 29 Mar 1 Mar 2 Mar 3 Mar 4 Mar 5 Mar 6 Mar 7 Mar 8 Mar 9 Mar 10 Mar 11 Mar 12 Mar 13 Mar 1 4 Mar 15 Mar 16 Mar 17 Mar 18 Mar 19 Mar 20 Mar 21 Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 27 Mar/


1 Channel Access Concepts – EPICS Training – K.Furukawa – Mar.2004. EPICS Channel Access Concepts Kazuro Furukawa, KEK, (2000-2004) (Bob Dalesio, LANL,

() u Use a monitor. u Use fetch with callback. u Use a synch protocol with a remote program. 14 Channel Access Concepts – EPICS Training – K.Furukawa – Mar.2004. EPICS Event Propagation u In any process control system, an application program must be prepared to respond to any one of a number of asynchronous events. u Events include hardware or software state changes (limit switches/


1 Surviving in space: the challenges of a manned mission to Mars Lecture 3 Modeling the Interaction of the Space Radiation in Spacecraft & Humans, and.

to Mars President Bush has committed the US Space Program to going to Mars… The first step will be a return to the Moon to develop and test the techniques needed eventually to go to Mars… Crew radiation exposure has been identified as one of /. Pinsky Modeling the Interaction of the Space Radiation in Spacecraft & Humans, and Assessing the Risks on a Mission to Mars 12 From NASA 1996 Strategic Program Plan CERN Course – Lecture 3 October 28, 2005 – L. Pinsky Modeling the Interaction of the Space Radiation in/


“Implementing the NASA Vision” Presentation to the AIAA/NSC/JPL Orlando Figueroa Director, Mars Exploration Program NASA Office of Space Science April.

system and life: What is the future habitability of Earth and other planets? The Solar System Exploration Program How do planets form? Why are planets different from one another? Where did the makings of life come from? Did life arise elsewhere in the Solar System? Mars Exploration Program Launch Year What Powered the Big Bang? Are There Hidden Space-time Dimensions? What is the/


Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Managing for Development Results Results-Oriented Monitoring.

Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand For impact monitoring, one has to clearly /evaluation schedule. Assign monitoring and evaluation responsibilities. Provide adequate budget for monitoring and evaluation. Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Project Implementation: M & E as Support to/


Design and Implementation of Speech Recognition Systems Spring 2011 Class 14: Grammars 14 Mar 2011 1.

if too long a silence has elapsed The application creates a new FSG for each new sentence, and destroys old ones Finally, the FSG module even allows dynamic fine-tuning of transition probabilities and modifying the FSG start state – To allow/a call to a function Thus, the entire CFG is like a program made up of many functions – Obviously, program execution can take many paths! – Each program execution produces a complete sentence 14 Mar 201164 CFG Based Decoding Consider the following simple CFG: – S /


Mars Technology Program 2/17/20051 MARS HUMAN PRECURSOR SCIENCE/EXPLORATION STEERING GROUP (MHP-SSG) INTRODUCTION David Beaty, Noel Hinners Feb. 17, 2005.

meteorological source over a Martian year, both in dust devils and large dust storms. Measurements needed on at least one landed mission. 2/17/2005 Findings of the MHP SSG 25 Team Atmosphere Example: Melnik and Parrot [1998] /terrain roughness and thermal inertia. Obtain temperature & density profiles, winds as a function of altitude, with profiles obtained globally. Mars Technology Program 2/17/200527 TEAM BIOHAZARD INTRODUCTION Carl Allen, Team Leader 2/17/2005 Findings of the MHP SSG 28 Team Biohazard/


Mar. 2006Computer Architecture, Memory System DesignSlide 1 Part V Memory System Design.

want a memory unit that: Can keep up with the CPU’s processing speed Has enough capacity for programs and data Is inexpensive, reliable, and energy-efficient Mar. 2006Computer Architecture, Memory System DesignSlide 4 17 Main Memory Concepts Technologies & organizations for computer’s main memory/10s or even 100s of ns Memory bandwidth limits the instruction execution rate Each instruction executed involves at least one memory access Hence, a few to 100s of MIPS is the best that can be achieved A fast buffer/


Sundermeyer MAR 999 Spring 2009 1 Laboratory in Oceanography: Data and Methods MAR599, Spring 2009 Miles A. Sundermeyer Data Handling in Matlab.

A)% create a signed integer(8) array AA = [A; A_single; A_int8]% combines to one data type % reverts to the simpler data type whos Sundermeyer MAR 999 Spring 2009 4 Examples of Different Data Types (cont’d) % logical A_logical = logical/ double complex whos A_cmplx = 2*A_int*i% int not allowed with complex operations Data Handling Matlab Programming Fundamentals / Overview of Matlab Classes Sundermeyer MAR 999 Spring 2009 8 Creating Arrays of Characters and Strings % More on characters and strings clear str/


Muon Accelerator Program Monthly Status Review February 22, 2013.

coil/shielding studies (Snopok,Souchlas,Weggel) Multi-variable optimization at NERSC (Qiang,Sayed) Install MARS at NERSC (Mokhov) ICOOL.v332 release (Berg) ICOOL/G4Beamlin comparison (Rogers, Stratakis) / between LBNL and SLAC signed –Fabrication of the modular cavity started Experimental program planning –Preliminary testing plan of the modular cavity developed Data analysis, simulations/ for e-beam welding of cavity with reduced thickness of Nb on one end RI has now started adding beam tubes to two 500 MHz /


1 H.E. Dr. Vathana Sann Mar-09 Social Protection Strategy for the Poor and Vulnerable in Cambodia Sann Vathana (PhD) Deputy Secretary General of CARD Impact.

eliminating WFCL Cash and in-kind transfers towards one integrated program Outreach services and second chance programs Social welfare services, School feeding, take-home rations etc. 24 H.E. Dr. Vathana Sann Mar-09 Objectives Basic needs in emergency and crisis / to the creation of sustainable physical and social infrastructure assets. Labor intensive Public Works Programs (FFW, CFW) 25 H.E. Dr. Vathana Sann Mar-09 Objectives Basic needs in emergency and crisis Poverty of Children & mothers and human/


Jeudi 19 Mars 2009 Faculté de Pharmacie, Lille P.Dieusaert C.Dingreville J.Le Tumelin C.Vandenberghe.

Honesty and liability Confidentiality of Patheons information  Deontologic and responsible policy 33jeudi 19 mars 2009  Confidential whistleblower program Internet and telephone based reporting tool  employees report any activities in violation of the Patheon /mars 2009 56jeudi 19 mars 2009 VALUE OF SHARE 57jeudi 19 mars 2009 58jeudi 19 mars 2009 Consequences Loss of shareholder confidence Difficulties if need to increase capital 59jeudi 19 mars 2009 SWOT S High quality Many services provided ‘One/


Best In France Program : Klöber Joseph Antonios, Blandine Avot, Anne Azzola, Anne Ravard All figures are confidentiel.

: Objectives: to fit to French standards - Accounting - legal issues - logistics to UPS (Comparison France/ Poland) Mars-Avril 2005 Best In France Program 9 Key benefit numbers Benefits in term of market share Ex: Ridges and “respirating” underlays: 80% of Kl/ in France, the French legislation does not strictly correspond to the German one. Each « avis technique » costs approximately 15000 euros. Mars-Avril 2005 Best In France Program 13 Adaptation to France Adaptation to the French market: -Selection of the/


Mars Radar Sounders LA RIPRESA DELLE MISSIONI VERSO MARTE 198820011999199819961992 Phobos 1 & 2 URSS Mars Observer USA Mars 96 Russia Mars Global Surveyor.

to be observed and thus sampled by the system will then be the one enveloped by twice the calculated and therefore to satisfy the Nyquist condition: And thence Mars Radar Sounders SHARAD PRESUMMING:PHASE ERRORS LIMITATIONS 4/4 Max number of presumable/does not uplink commands During the regular instrument programming three files for each active orbital pass are uploaded: the OST (Operational Sequence Table) file The OST, shall contain SHARAD measurement modes programming for the active portion of an orbit. /


Wired For Fun: An Introduction to Online Gaming and Programming in Your Library Steven Kraus Skills Development Advisor Ontario Library Service – North.

): 18+. General OneFile. Web. 30 Mar. 2010 Your Potential Audience… One of our teen patrons who recently moved to our small town came to tell me that one of the video games we purchased for the programs was not compatible with the system we /to twenty-somethings and thirty- somethings, a traditionally underserved audience itself, using a variety of gaming programs. Once certain groups find out that one demographic is allowed to game in the library, they often request it for themselves because gaming /


Model-based Programming of Cooperating Explorers Brian C. Williams CSAIL Dept. Aeronautics and Astronautics Massachusetts Institute of Technology.

nav rotate to entry-orient & hold attitude Rotate spacecraft: once entry orientation achieved, ACS holds attitude Mars Entry Example (Courtesy of Mitch Ingham. Used with permission.) engine to standby planetary approach separate lander switch/engine on EngineA EngineB Science Camer Science Camera Model-based Program Control program specifies state trajectories: OrbitInsert():: (do-watching ((EngineA = Thrusting) OR (EngineB = Thrusting)) fires one of two engines sets both engines to standby prior to /


Slide 1 MaRS ` Business Development and Entrepreneurship Basics Presented by: Tony Redpath Vice President, Partner Programs MaRS Discovery District 7 October.

I Concept R & D Project Lab Prototype Engineering Project Engineering Prototype Production Sales Company II Slide 6 MaRS Consulting …. Cont’d Can start as a one-person business May have a technical, management, or marketing focus Often stay small, but consulting engineering/&resultCount=25NSERC Idea to Innovation (I2I) Program  http://www.nserc.ca/professors_e.asp?nav=profnav&l bi=b4 NRC - IRAP  http://irap-pari.nrc-cnrc.gc.ca/main_e.html Slide 19 MaRS The Financing Life Cycle Risk Sales Investment Concept/


1 (Review of Prerequisite Material). Processes are an abstraction of the operation of computers. So, to understand operating systems, one must have a.

MEM:  WB: r3  ALUoutput 17  load 30(r1), r2  IF: MAR  PC; IR  M[MAR]  ID: A  r1; PC  PC + 4  EXE: MAR  A + #30  MEM: MDR  M[MAR]  WB: r2  MDR 18  bnez r1, -16  IF: MAR  PC; IR  M[MAR]  ID: A  r1; PC  PC + 4  EXE: ALUoutput  /20 21 Application Program Device Controller Device Software in the CPU Abstract I/O Machine Device manager Program to manage device controller Supervisor mode software  Block or character oriented  Depends on number of bytes transferred in one operation  Input/


1crmda.KU.edu Todd D. Little University of Kansas Director, Quantitative Training Program Director, Center for Research Methods and Data Analysis Director,

and Behavioral Sciences Methodology Minor Member, Developmental Psychology Training Program crmda. KU.edu Workshop presented 5-23-2012 @ / unobserved variables (selective process) and no association with observed variables Missing at Random (MAR) No association with unobserved variables, but maybe related to observed variables Random in the/Measurement crmda.KU.edu24 How it works ALL participants receive Measure 2 (the cheap one) A subset of participants also receive Measure 1 (the gold standard) Using both /


Ads by Google