Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report 10 OSHC Consultancy Project 17 Sep, 2012 Guo Yueping, Jackie.

Similar presentations


Presentation on theme: "Report 10 OSHC Consultancy Project 17 Sep, 2012 Guo Yueping, Jackie."— Presentation transcript:

1 Report 10 OSHC Consultancy Project 17 Sep, 2012 Guo Yueping, Jackie

2 1 st Field study (Yuen Long, 8/3/2012, Fri)

3 2 nd Field study (Fanling, 8/7/2012,Tue)

4 3 rd Field study (Sheung Shui, 8/14/2012,Tue)

5 4 th Field study (Causeway Bay, 8/23/2012,Thu)

6 Field study 5 (Sheung Shui 2, 8/28/2012,Tue)

7 5 th Field study (Sheung Shui 2, 8/28/2012,Tue)

8 6 th Field study (Airport 1, 9/4/2012,Tue)

9 7 th Field study (Airport 2, 9/10/2012, Mon)

10 8 th Field study (Tuen Mun, 9/14/2012, Fri)

11 Analysis for construction site environment condition

12

13

14

15

16

17 Analysis for Construction Subjective Questionnaire vs

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33  其中 KMO=0.731 , Bartlett’s test Chi-sq=696.428 , (Sig.=0.000<0.05) ,代表資料適合作因素分析。 Factor analysis

34 Factor loading Percentage of variance explained Cumulative percentage of variance explained Eigenvalue

35  在此陡坡圖中,我們可 看出下降斜率最快的是 component number=4 。

36

37 Factor 2: thermal and moisture, breathable sensation Factor 3: Skin sensation Factor 1: Garment physical feature, Usability, comfort and practical Factor 4: safety and preference

38

39 Thanks


Download ppt "Report 10 OSHC Consultancy Project 17 Sep, 2012 Guo Yueping, Jackie."

Similar presentations


Ads by Google