Presentation is loading. Please wait.

Presentation is loading. Please wait.

Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave.

Similar presentations


Presentation on theme: "Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave."— Presentation transcript:

1 Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave between Macomb Road and Kline/Gordon Lane will be closed from 10-17 November 2015. The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will be no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field Macomb Rd Kline Rd Gordon Rd Curb Work Concrete curb repair has been completed between 19 October – 5 November 2015.

2 Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 2 Leilehua Ave between the Kline/Gordon Lane and the Stoneman Field Road will be closed from 18 - 24 November 2015. There will be no access to the parking of SB 645, Family and Child Care. The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field Kline Rd Gordon Rd

3 Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 3 Leilehua Ave between McCornack and the Stoneman Field Road be closed from 25 November to 4 December 2015. The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field

4 Leilehua Ave Revised- Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks McCornack Road Stoneman Field Striping Striping will be performed from 9-10 December 2015. There will be moving lane closures along Leilehua Ave. Flagmen will direct traffic. Morris Rd Mc Andrew Rd Top Lift Paving Phase B Leilehua Ave between Morris/McAndrew and McCornack will be closed on 8 December 2015 (red). The lanes between Leilehua Ave and Waianae Ave highlighted in yellow will be made 2-way for residents only. The closures will be from 0800-1630 Top Lift Paving Phase A Leilehua Ave between Macomb and Morris/McAndrew will be closed on 7 December 2015 (orange). The lanes between Leilehua Ave and Waianae Ave highlighted in blue will be made 2- way for residents only. The closures will be from 0800-1630 Note: During Top Lift Paving Phase A, there will be no parking in the Leilehua bound direction of the blue lanes and no parking within 100 ft of Leilehua Ave. During Top Lift Paving Phase B, there will be no parking in the Leilehua bound direction of the yellow lanes and no parking within 100 ft of Leilehua Ave.


Download ppt "Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave."

Similar presentations


Ads by Google