Presentation is loading. Please wait.

Presentation is loading. Please wait.

Big Cypress National Preserve National Park Service Status of Zones 2-4.

Similar presentations


Presentation on theme: "Big Cypress National Preserve National Park Service Status of Zones 2-4."— Presentation transcript:

1 Big Cypress National Preserve National Park Service Status of Zones 2-4

2 Big Cypress National Preserve National Park Service Zone 2- “only swamp buggies and all- terrain cycles would be allowed on the approximately 10 miles of designated primary trails, after they were designated.” Monroe South (8/13/04) – Approximately 5.95 miles of trail have been designated for use by ATCs and Swamp Buggies.

3 Big Cypress National Preserve National Park Service Zone 3- “swamp buggies, all-terrain cycles, and airboats would be allowed on approximately 25 miles of designated primary trails, after they were designated.” Sig Walker Strand – Approximately 10 miles of trail currently exists and is used by one land owner for access. Designation is pending.

4 Big Cypress National Preserve National Park Service Paces Dike (8/13/04) – Approximately 2.93 miles of trail have been designated for use by ATCs and Swamp Buggies.

5 Big Cypress National Preserve National Park Service Zone 4- “only airboats would be allowed, and then only on designated primary trails.” Approximately 57.7 miles of Zone 4 Primary Trails have been designated since early in the implementation of the ORV Plan. The ORV plan does not allow for secondary trails in Zone 4.

6 Big Cypress National Preserve National Park Service In response to user input regarding difficulty in accessing some areas in Zone 4 via the designated trails we embarked on a re-evaluation of the existing Trail system there in 2006/7, while simultaneously reviewing trails in the Bear Island Unit. To date the following have been completed:

7 Big Cypress National Preserve National Park Service Conducted a public meeting to identify destinations and prospective, existing trails that could be used to link them. Ground-truthed these trails, preliminarily evaluating them with respect to sustainability and other factors specified in the ORV Plan.

8 Big Cypress National Preserve National Park Service Created preliminary trail routing alternatives for further consideration and analysis by staff.

9 Big Cypress National Preserve National Park Service Suspended further consideration of project pending resolution of law suit regarding trail re-routing in the Bear Island Unit.


Download ppt "Big Cypress National Preserve National Park Service Status of Zones 2-4."

Similar presentations


Ads by Google