1 Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE

2 Bld 887: H8 beam line 2October 2010J.LENDARO

3 3October 2010J.LENDARO Experimental Area 138

4 4October 2010J.LENDARO Experimental Area 138

5 5October 2010J.LENDARO Experimental Area 138 Cables from control room HNA443: 10 coaxial cables (BNC connectors) 4 HV coaxial cables (SHV connectors) 1 Ethernet cable (RJ45 connectors) Services available inside the area: AC power 230V 2 Ethernet outlets

6 6October 2010J.LENDARO Experimental Area 128

7 7October 2010J.LENDARO Experimental Area 128

8 8October 2010J.LENDARO Experimental Area 128

9 9October 2010J.LENDARO Experimental Area 128 Cables available from control room HNA443 4x coaxial cables (BNC connectors) 4x HV coaxial cables (SHV connectors) 2x Ethernet cable (RJ45 connectors) 1x I2C control cable Several optical fibers have been installed in September 2010. (Thanks to EN-EL-CF) 12x Multimode fibers (ST connectors) 36 single mode fibers with E2000/APC connectors Services available inside the area: AC power 230V: Will be consolidated during winter shutdown Network: installation during winter shutdown

10 10October 2010J.LENDARO Control room HNA443

11 11October 2010J.LENDARO September 2010 Optical fibers panel

12 12October 2010J.LENDARO September 2010

13 13October 2010J.LENDARO Thank you !