Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK

Similar presentations


Presentation on theme: "WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK"— Presentation transcript:

1 WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK d.p.kelsey@rl.ac.uk

2 24-Jan-02D.P.Kelsey, WP7 Security Coord2 Task 7.4 - Agenda New people: Akos Frohner (CERN), Robert Harakaly (CNRS) also Sophie Nicoud (CNRS) Wednesday 23 rd Jan 2002 –Deliverable D7.5 Thursday 24 th Jan 2002 –D7.5 (cont’d) –Status and plans for WP6 Authorisation Group (Roberto) –Status and plans for DataTAG WP4 and SecureGrid (Leon) –Generic AAA model in Grids – IETF presentation (Leon) –Online Credential Retrieval (Akos) work in Hungarian Grid – development of MyProxy –Future plans (D7.6 Security Design and Release 2) –Next meeting(s)

3 24-Jan-02D.P.Kelsey, WP7 Security Coord3 D7.5 (M15 report) Security Requirements and Testbed-1 report V0.1 7 Dec 2001 V0.221 Jan 2002 Much discussion on structure and scope –E.g. Accounting is outside the scope (WP1)

4 24-Jan-02D.P.Kelsey, WP7 Security Coord4 D7.5 structure Ch1Introduction Includes definition of security terminology Ch2Executive summary Ch3What is Security? Start with general description Function types –Authentication, Authorisation… Requirement classes –Reliability, Security, Ease of use, Manageability Scope of Security in DataGrid and document Description of Globus GSI Assumptions

5 24-Jan-02D.P.Kelsey, WP7 Security Coord5 D7.5 structure (cont’d) Ch4Security Requirements Some are needs and/or constraints Organised by function types Matrix of functions vs requirementsMatrix Ch5Security Implementation in Testbed-1 Not too detailed, leave something for D7.6 Ch6Requirements satisfied by Testbed-1 and future plans

6 24-Jan-02D.P.Kelsey, WP7 Security Coord6 D7.5 (cont’d) V0.31 st Feb 2002 –Structure agreed here will be implemented V115 th Feb 2002 –Internal working version for contact with WP Individuals assigned to contact each WP –Prepare full list of requirements –Describe Testbed 1 V1.11 st March 2002 –Full text for review by group –Prepare Chapter 6 – Future plans V215 th March 2002 –Ready for external review

7 24-Jan-02D.P.Kelsey, WP7 Security Coord7 D7.6 (M25) Security Design and Testbed 2 Input –Requirements from D7.5 and future plans –From each WP EDG ATF –Being re-convened (1 st meeting in Paris) –Need a representative from Security –Security group and ATF must be complementary

8 24-Jan-02D.P.Kelsey, WP7 Security Coord8 Plans for release 2 Not yet defined –But WP’s have own plans –e.g. WP1 credential renewal, WP3 info services Input from full list of requirements in D7.5 and from WP contacts We have coordination role and duty to check security designs and implementations WP6 Authorisation group will test prototype CAS, together with WP1 and WP2 (soon?) Security group unlikely to develop any code –Will be done by WPs, Authorisation group or DataTAG

9 24-Jan-02D.P.Kelsey, WP7 Security Coord9 Future meetings Wish to continue meeting with WP7 and DataTAG –But should avoid parallel meetings Several people in common! We need half a day on Tuesday 5 th March – Paris –Finalise D7.5 –Define future plans (Chapter 6 in D7.5) Next WP7 meeting? (April, May?)


Download ppt "WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK"

Similar presentations


Ads by Google