C.BAULT November 9 th 2009 1  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.

Similar presentations


Presentation on theme: "C.BAULT November 9 th 2009 1  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING."— Presentation transcript:

1 C.BAULT November 9 th 2009 1  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING INNER DETECTOR INTEGRATION

2 C.BAULT November 9 th 2009 2  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING INNER DETECTOR INTEGRATION

3 3 LAYOUT STRAWMAN 07V13 LAYOUT STRAWMAN 07V14 1 1 2 2 3 3 LAYOUT STRAWMAN 07V13 Vs 07V14 C.BAULT November 9 th 2009

4 4 LAYOUT STRAWMAN 07V13 LAYOUT STRAWMAN 07V14 Free zone for services Bad accessibility to SMC LAYOUT STRAWMAN 07V13 Vs 07V14

5 5 LAYOUT STRAWMAN 07V13 LAYOUT STRAWMAN 07V14 Pixel layers 2 & 3 services: this routing seems difficult Pixel layers 2 & 3 services: this routing seems better C.BAULT November 9 th 2009 LAYOUT STRAWMAN 07V13 Vs 07V14

6 6 LAYOUT STRAWMAN 07V13LAYOUT STRAWMAN 07V14 Free zone for services C.BAULT November 9 th 2009 LAYOUT STRAWMAN 07V13 Vs 07V14

7 7 LAYOUT STRAWMAN 07V14 Strip barrel tilt: 10° (was 16° in Strawman 07V13) C.BAULT November 9 th 2009 LAYOUT STRAWMAN 07V13 Vs 07V14

8 8 LAYOUT STRAWMAN 07V14 Strip barrel tilt: 10° (was 16° in Strawman 07V13) Cylinder 5 Conflict between each SMC C.BAULT November 9 th 2009 LAYOUT STRAWMAN 07V13 Vs 07V14

9 9 LAYOUT STRAWMAN 07V14 Cylinder 1 Conflict between each SMC Strip barrel tilt: 10° (was 16° in Strawman 07V13) Cylinder 2 Cylinder 3 Conflict between support stave and nearby stave Cylinder 2 C.BAULT November 9 th 2009 LAYOUT STRAWMAN 07V13 Vs 07V14

10 C.BAULT November 9 th 2009 10  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY https://espace.cern.ch/engineering-ITupgrade/Shared%20Documents/ServicessummarySTR07V14-06112009.xlsx https://espace.cern.ch/engineering-ITupgrade/Shared%20Documents/Services-mass%20area-Str07V14-22102009.pdf  ENVELOPE SERVICES  BARREL SERVICES ROUTING INNER DETECTOR INTEGRATION

11 C.BAULT November 9 th 2009 11  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING INNER DETECTOR INTEGRATION

12 C.BAULT November 9 th 2009 12 ENVELOPE SERVICES HV and LV cables Outlet cooling Optical fibres DCS cables Inlet cooling Pixel services BARREL SERVICES oR: 1063mm iR: 1027mm

13 C.BAULT November 9 th 2009 13 ENVELOPE SERVICES HV and LV cables Outlet cooling Optical fibres DCS cables Inlet cooling Pixel services BARREL and END-CAP SERVICES: Clearance: 25mm End-Cap services oR: 1002mm oR: 1063mm iR: 1027mm

14 C.BAULT November 9 th 2009 14 ENVELOPE SERVICES: 3d models created from inventory (with packing factor) and inserted in envelopes HV and LV cables Outlet coolingOptical fibres DCS cables Inlet cooling Pixel services oR: 1063 iR: 1027 oR: 1007 BARREL and END-CAP SERVICES: Clearance: 20mm End-Cap model made by David

15 C.BAULT November 9 th 2009 15 ENVELOPE SERVICES: Services routing through End Flange of Outer Cylinder

16 C.BAULT November 9 th 2009 16  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING INNER DETECTOR INTEGRATION

17 C.BAULT November 9 th 2009 17 BARREL SERVICES ROUTING LV cables Outlet cooling Optical fibresDCS cables Inlet cooling HV cables 1/4’’ pipe per stave1/8’’ capillary per stave regrouping on a manifold: 1 manifold for 3 or 4 capillaries

18 C.BAULT November 9 th 2009 18 BARREL SERVICES ROUTING Outlet cooling

19 C.BAULT November 9 th 2009 19 BARREL SERVICES ROUTING Outlet cooling Inlet cooling

20 C.BAULT November 9 th 2009 20 BARREL SERVICES ROUTING Outlet cooling Inlet cooling LV cables

21 C.BAULT November 9 th 2009 21 BARREL SERVICES ROUTING Outlet cooling Inlet cooling LV cables HV cables

22 C.BAULT November 9 th 2009 22 BARREL SERVICES ROUTING Outlet cooling Inlet cooling LV cablesDCS cables HV cables

23 C.BAULT November 9 th 2009 23 BARREL SERVICES ROUTING Outlet cooling Inlet cooling LV cables Optical fibres DCS cables HV cables Barrel services: Z 1287 maxi Pixel services: Z 1320 maxi

24 C.BAULT November 9 th 2009 24 BARREL SERVICES ROUTING Outlet cooling Inlet cooling LV cables Optical fibres DCS cables HV cables Barrel and Pixel services: Z 1287 maxi

25 25 INNER DETECTOR INTEGRATION: CONCLUSION C.BAULT November 9 th 2009  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14 This is a quick analyze of main differences between 2 layout. We have to check consequences by designing: Services on Barrel flange Stave support and SMC organization (because of 10° tilt angle)  SERVICES AND STRUCTURES INVENTORY This inventory was a request from physicist to make simulation. It’s a good input to design details of services We have to complete missing datas: Micro-twinax diameter, connectors, SMC characteristic…

26 26 INNER DETECTOR INTEGRATION: CONCLUSION C.BAULT November 9 th 2009  ENVELOPE SERVICES Design of Pixel services is not yet done. We assume routing of them will be hard: along barrel flange, between last pixel disc and first End-Cap disc, through End Flange of OC… Clearance for End-Cap insertion is only 20mm. (had forseen 25mm)  BARREL SERVICES ROUTING Assume replacement of a stave involves lots of services dismounting. Have to design other solutions (cooling manifold, distribution by layer instead quarter…) Access to connect services on SMC will be very hard. Have to work on SMC design to optimize.