MEP Coordination. Excerpt from Clash Report. Togar Suites. Union, NJ BmSDC Garage Clash Report, Clash #3 MEP Coordination. Simple Clash Detected  Beam.

Similar presentations


Presentation on theme: "MEP Coordination. Excerpt from Clash Report. Togar Suites. Union, NJ BmSDC Garage Clash Report, Clash #3 MEP Coordination. Simple Clash Detected  Beam."— Presentation transcript:

1 MEP Coordination. Excerpt from Clash Report

2 Togar Suites. Union, NJ BmSDC Garage Clash Report, Clash #3 MEP Coordination. Simple Clash Detected  Beam (W8 x 28) meets  Pipe (8” Sanitary Line)  …Hello?

3 SK-6 GS2-4 “Clash No. 3: We recommend increasing the size of the beam from W8x28 to W24x55 and providing an opening in the steel beam at the location of the conflict between the pipe and beam. Refer to GS2-4 for the location and SK-6 for the detail.” Togar Suites. Union, NJ BmSDC Garage Clash Report, Clash #3 MEP Coordination. Recommendation from Engineer

4 Without BIM  cost of a W8 x 28………………….. $1300  cost of replacement W24 x 55….... $2500  removing the beam with a crane…... $205  installing new beam with a crane….. $195  field prep of penetration…………..... $464 Net Cost $4,932 With BIM  cost of a W24 x 55………….. $2500  credit W8x28………………  shop prep of penetration.….…. $210 Net Cost $1,410 MEP Coordination. Cost Comparison

5 Without BIM Net Cost = $4,932 With BIM Net Cost = $1,410 Collision Analysis. Cost Comparison cont.  5 days of general conditions…… $22,000  5 days delay to other trades...Not Included  cost of 5 days lost use……….Not Included  liquidated damages…………..Not Included Total Cost = $26,932 Total Cost = $1,410


Download ppt "MEP Coordination. Excerpt from Clash Report. Togar Suites. Union, NJ BmSDC Garage Clash Report, Clash #3 MEP Coordination. Simple Clash Detected  Beam."