Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation.

Similar presentations


Presentation on theme: "Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation."— Presentation transcript:

1 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation

2 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

3 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction

4 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat

5 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning

6 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator

7 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator I911-3 Tunable MX station Mini-kappa MK3

8 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Experiment station completely rebuilt March-May 2010 (new hutch, new experiment tables, new goniostat,...) Users during June 2010 Sample changer installation October 2010

9 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

10 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

11 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

12 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Control software: spec and mxCuBE mini-kappa MK3: not yet used

13 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV New facility replacing the present MAX I, MAX II & MAX III storage rings (and the present FEL test facility) Consisting of: - 1.5 GeV ring (96 m circumference, 6 nm rad) - 3 GeV ring (530 m circumference, 0.3 nm rad, 19 straight sections available) - a short pulse facility that could be extended with a FEL

14 Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV Funding available for buildings and accelerator... but not for the beamlines We hope to have funding for 7 beamlines this autumn including a microfocus MX beamline and possibly a high-throughput MX beamline.