Presentation is loading. Please wait.

Presentation is loading. Please wait.

Enable LiveMeeting Audio We will begin the session shortly…

Similar presentations


Presentation on theme: "Enable LiveMeeting Audio We will begin the session shortly…"— Presentation transcript:

1 Enable LiveMeeting Audio We will begin the session shortly…

2 Session 1 - Answers to Quiz Questions. 1.You configure InfoPath Forms Services by creating a service application for it. True or False? – Ans: False 2.Which functionality of Enterprise Content Management allows you to manage the lifetime of documents? – Ans: Archiving / Documents Repository / Records Repository 3.When would you use Word Automation Services? – Ans: To allow users view Word documents from a SharePoint site within the Web browser.

3 Session 1 - Answers to Quiz Questions. 4.Using ______, you can target content to a specific set of people based on select profile properties. – Ans: Audiences 5.Which database is used to store all settings for import connections used in profile import? – Ans: Sync database 6.Which protocol is used to import user profiles from a directory server? – Ans: LDAP or Lightweight Directory Access Protocol

4 Session 1 - Answers to Quiz Questions. 7.You can add tables to an Access database using Access Services in SharePoint 2010. True or False? – Ans: False 8.What are Excel Web Services used for? – Ans: For programmatic access to Excel spreadsheet/workbook data. 9.A _______ is a type of report that displays a collection of Key Performance Indicators (KPIs) together with performance targets for each KPI. – Ans: Scorecard

5 Session 1 - Answers to Quiz Questions. 10.All visio drawings can be converted by Visio Services for viewing in a browser. True or False? – Ans: False. Only Visio Web drawings (*.vdw). 11.Form designers can use InfoPath Forms Services to design forms within a SharePoint site. True or False? – Ans: False.

6 SharePoint Architecture – Farm Deployment J Vijay William

7 Agenda Building a Farm Topology Designing Services Architecture Planning Availability Disaster Recovery

8 Farm Topology – Deploying your Corporate Web Site on the Internet Anonymous Authentication Customers http://www.contoso.com Application Pool 2 Service Applications

9 Farm Topology – Deploying a Web Site for your Intranet Default – Integrated Windows Authentication (NTLM/Kerberos) Internal Employees http://teams http://my UAG, TMG, or ISA — Forms-based authentication SharePoint — NTLM or Kerberos (same as internal employee) Remote Employees http://intranet.contoso.com http://my.contoso.com Application Pool 2 for Team Sites Application Pool 3 for My Sites Service Applications

10 Demo Reviewing your farm topology

11 Quiz 1.Which functionality allows you to configure multiple URLs to access a web application for both the intranet and the internet? A.Authentication providers B.Alternate access mappings C.My sites D.Application pools 2.Which authentication method is used to allow users access a web site without having to use any credentials? A.Kerberos B.NTLM C.Anonymous D.None of the above E-mail your answers to espquiz@microsoft.com.espquiz@microsoft.com

12 Designing Services Architecture

13 Terms to Understand Service: A set of bits installed on a farm that is capable of providing some functionality. Service Application: A specific farm-level configuration of a Service in SharePoint. Service Instance: An instance of a Service running on a SharePoint server. Service Application Proxy: A pointer to a Service Application that exists on the SharePoint WFE. Service Consumer: A SharePoint feature, such as a Web part, that communicated with a service and makes the functionality available to an end user.

14 Services Infrastructure and Design Principles You can deploy only the service applications that are needed to a farm. Web applications can be configured to use only the service applications that are needed, instead of all the services that have been deployed. You can deploy multiple instances of the same service in a farm and assign unique names to the resulting service applications. You can share service applications across multiple Web applications within the same farm.

15 Service Application Proxy Groups

16 Service Applications – Logical Architecture

17 Quiz 3.How many service application (proxy) groups can a Web application connect to? A.1 B.2 C.3 D.unlimited 4._________ is a pointer to a Service Application that exists on the SharePoint WFE. A.Service B.Service application proxy group C.Service application proxy D.Service instance E-mail your answers to espquiz@microsoft.com.espquiz@microsoft.com

18 Server Farm Availability

19 Why Plan for Availability? If a site, service, or farm becomes unavailable, will: – employees be unable to perform their expected job responsibilities? – business and customer transactions be stopped, leading to loss of business and customers? If you answered yes to either of these questions, you should invest in an availability solution.

20 Availability Within a Server Farm

21 Availability with Database Mirroring – Configuring Failover Server

22 Disaster Recovery

23 Disaster Recovery - Strategies Cold Standby – can provide availability within hours or days Warm Standby – can provide availability within minutes or hours. Hot Standby – can provide availability within seconds or minutes.

24 Disaster Recovery - Cold Standby Strategy You can ship backups to support bare metal recovery to an offsite storage on a regular basis. This also includes that you have contracts in place for emergency server rentals, if required. Pros: – Often the cheapest option to maintain, operationally. – Often an expensive option to recover, because it requires that physical servers be configured correctly after a disaster has occurred. Cons – The slowest option to recover.

25 Disaster Recovery – Warm Standby Strategy You ship virtual server images to locations where you have planned the disaster recovery farm. Pros: – Often relatively inexpensive to recover, because a virtual server farm can require little configuration upon recovery. Cons – Can be expensive and time consuming to maintain.

26 Disaster Recovery – Hot Standby Strategy Your business runs multiple data centers, and SharePoint is hosted on one of the data centers. Pros: – Often relatively fast to recover. Cons – Can be quite expensive to configure and maintain.

27 Disaster Recovery - Redundancy and Failover Between Closely Located Data Centers

28 Quiz 5.Which server ensures synchronous replication of data between two SQL servers? A.Web Front End (WFE) B.Application C.Principal D.Witness E-mail your answers to espquiz@microsoft.com.espquiz@microsoft.com

29 Review Building a Farm Topology Designing Services Architecture Planning Availability Disaster Recovery

30 Questions?

31 Winner of the Quiz (for the session on Sep 19) Ganesh Shelar (OTIS) Please send us your mailing address to espquiz@microsoft.com. espquiz@microsoft.com CONGRATULATIONS !!!

32 Thank You


Download ppt "Enable LiveMeeting Audio We will begin the session shortly…"

Similar presentations


Ads by Google