Presentation is loading. Please wait.

Presentation is loading. Please wait.

802.16 Metrology SG Closing Report – Session #79 Clif Barber (KDDI)

Similar presentations


Presentation on theme: "802.16 Metrology SG Closing Report – Session #79 Clif Barber (KDDI)"— Presentation transcript:

1 802.16 Metrology SG Closing Report – Session #79 Clif Barber (KDDI) cbarber@cjbarberconsulting.com

2 Summary of Meetings During Session #79, the Metrology SG held four (4) meetings as follows: Monday 14 May 201210:31 AM – 11:47 PM Tuesday 15 May 201210:35 AM – 12:13 PM Wednesday 16 May 201210:31 AM – 12:32 PM Thursday 17 May 201210:35 AM – 11:36 PM

3 Summary of Input Contributions REFTITLESOURCEACTION 802.16-12-0342-00-Smet Standardization of Mobile Broadband Network Performance Measurements MARKSNOTED 802.16-12-0343-00-Smet Standardization of Mobile Broadband Network Performance Measurements: Proposed PAR MARKS AGREED R1 802.16-12-0344-00-Smet Standardization of Mobile Broadband Network Performance Measurements: Proposed Five Criteria Statement MARKS AGREED R2 802.16-12-0345-00-Smet Standardization of Mobile Broadband Network Performance Measurements: Proposed Call for Contributions MARKS 802.16-12-0382-00- Smet 802.16-12-0358-00-Smet Directions for IEEE 802.16’s Metrology Study Group JANEZIC, GOLMIE, AND ORR CARRIED FORWARD 802.16-12-0361-00-Smet Mobiperf: Open source, open data crowdsourced mobile network measurements WELSHNOTED 16-12-0369-00-Smet Standardization of Mobile Broadband Network Performance Measurements: Target Applications MARKSNOTED 16-12-0373-00-Smet Broadband Internet Performance: A View from the Gateway FEAMSTERNOTED 16-12-0370-00-SmetEnd-to-end Performance DiagnosisKANUPARTHYNOTED

4 Chair’s Summary of Discussions The SG reviewed several contributions related to Mobile Broadband Network Performance Measurements – agreed to recommend a PAR for Plenary approval. The SG noted expressions of support for and a desire to participate in these activities from representatives of the following companies: –Google, Inc. –NIST –Georgia Tech –Mobile Pulse, Inc. Nada Golmie (NIST) has requested that, “given the large scope of the proposed Study Group, we realize that it may take longer to define specific projects, so we hope that the Study Group will be extended past its original July termination period and remain open to contributions on new topics at least through December.”

5 Documents Agreed to Be Recommended for Plenary Approval SG REFTITLEPLENARY REF 802.16-12-0343-01-Smet Standardization of Mobile Broadband Network Performance Measurements: Proposed PAR 16-12-0377-00-Gdoc 802.16-12-0344-02-Smet Standardization of Mobile Broadband Network Performance Measurements: Proposed Five Criteria Statement 16-12-0378-00-Gdoc 16-12-0382-02-Smet Call for Contributions for 802.16 Metrology SG for Session #80 16-12-0379-00-Gdoc

6 Plenary Approval Motions (1) MOTION: To forward the proposed PAR for Standardization of Mobile Broadband Network Performance Measurements (16-12-0377-00- Gdoc) and associated proposed Five Criteria Statement (16-12-0378-00-Gdoc) to IEEE 802 Executive Committee. –Mover:Cha –Second:Bims

7 Plenary Approval Motions (2) MOTION: To approve the issuance of the Call for Contributions for 802.16 Metrology SG for Session #80 (16-12-0379-00-Gdoc). –Mover:Nigam –Second:Bims

8 Next Steps Session #80 - 16-19 July 2012 - San Diego, CA, USA –Continue discussion of “Standardization of Mobile Broadband Network Performance Measurements” PAR Assessing Air interface performance issues Assessing Last mile (from MS to 1 st Internet hop) performance –Investigate other options for metrology projects –Determine whether or not to request an extension to the term of the AdHoc, noting request from NIST to extend. NOTE: The WG Chair is considering the feasibility of holding a tutorial on the PAR topic on 16 July 2012. He is now soliciting speaker volunteers for that tutorial.


Download ppt "802.16 Metrology SG Closing Report – Session #79 Clif Barber (KDDI)"

Similar presentations


Ads by Google