IENG 217 Cost Estimating for Engineers Product Estimating.

Similar presentations


Presentation on theme: "IENG 217 Cost Estimating for Engineers Product Estimating."— Presentation transcript:

1 IENG 217 Cost Estimating for Engineers Product Estimating

2 Product Methods Learning Operations Planning Bill of Material Method of profit and loss

3 Learning Theory Person-hours or cost necessary to complete a unit will decrease by a constant percentage each time the manufacturing quantity is doubled.

4 Learning Theory Now consider the cost per unit is $100 for 1 unit produced and $80 for 2 units produced.

5 Learning Theory

6

7 Class Problem A company audits to production units for an engine machining process. The 20 th unit requires 120 hours of total machining time while the 40 th unit requires 90 hours of total machining time. Estimate the time it will take to machine the 80 th unit.

8 Class Problem

9

10

11

12 Engineering Costs

13

14 Information Needed Engineering bill of materials Due date for completion Quantity, rate of production, etc. Special test, inspection Packaging & shipping information Marketing information

15 Bill of Material

16

17 Product Estimate Productive hour cost model Activity Based Costing Learning Model

18 Productive hour cost model

19

20 Example

21 From below

22 Example HSUNxH hrs l c    (/).(./). 60 75873156160 4651

23 Example PHClothoursxprodhrtrate    cos.(.) $1,. 46513219 49727