Presentation is loading. Please wait.

Presentation is loading. Please wait.

OWASP 1 Industry Committee – Recently Completed  InfraGard Presentation to Denver chapter of InfraGard (US critical national infrastructure)  DPC BS.

Similar presentations


Presentation on theme: "OWASP 1 Industry Committee – Recently Completed  InfraGard Presentation to Denver chapter of InfraGard (US critical national infrastructure)  DPC BS."— Presentation transcript:

1 OWASP 1 Industry Committee – Recently Completed  InfraGard Presentation to Denver chapter of InfraGard (US critical national infrastructure)  DPC BS 8878:2009 (Web accessibility) Response to draft British Standard highlighting web application security issues  Digital Britain Interim Report Response to interim UK government report on e-economy, esp. online safeguards

2 OWASP 2 Industry Committee – In Progress  Draft NIST SP 800-122 (Protecting PII) Response to draft  Draft NIST SP 800-53 Rev 3 (Security Controls) Detailed analysis and response on security controls for federal information systems  Consensus Audit Guide (Most important FISMA) Translating OWASP Top 10 into a format for CAG as requested by SANS Institute  DPC BS 10012 (Management of Personal Info) Response to draft British Standard  OWASP ISWG Assistance to Intrinsic Security Working Group with letter to browser vendors

3 OWASP 3 Industry Committee – Contribute  Participate in OWASP projects  Suggest organisations to engage with and documents/standards/drafts to comment on  Provide input to the response creation and review process  Join the Global Industry Committee’s mailing list http://www.owasp.org/index.php/Global_Industry_Committee


Download ppt "OWASP 1 Industry Committee – Recently Completed  InfraGard Presentation to Denver chapter of InfraGard (US critical national infrastructure)  DPC BS."

Similar presentations


Ads by Google