1 Status of PT Cryocooler for Final Calorimeter KEK, ICEPP Tom HARUYAMA / Satoshi MIHARA 2004.1.20-21 MEG Pre-Meeting 1. Heat load and PT cryoooler 2.

Similar presentations


Presentation on theme: "1 Status of PT Cryocooler for Final Calorimeter KEK, ICEPP Tom HARUYAMA / Satoshi MIHARA 2004.1.20-21 MEG Pre-Meeting 1. Heat load and PT cryoooler 2."— Presentation transcript:

1 1 Status of PT Cryocooler for Final Calorimeter KEK, ICEPP Tom HARUYAMA / Satoshi MIHARA 2004.1.20-21 MEG Pre-Meeting 1. Heat load and PT cryoooler 2. Further test and schedule

2 2 -Heat Load- -Based on the KEK-original PT cryocooler, Cryocooler with higher cooling power has been developed for the final calorimeter

3 3 Large Power Pulse Tube Cryocooler Technology transfered to Iwatani Co., Ltd Designed: 150 W @165K

4 4 Large Power Pulse Tube Cryocooler Technology transfered to Iwatani Co., Ltd. One for Columbia University For Dark Matter Research Designed: - 90 W@165K - 3kWcompressor

5 5 Large Power Pulse Tube Cryocooler - Technology transfered to Iwatani Co., Ltd. - Two for MEG Designed: - 150 W @165K - using 6.7kW compressor

6 6 Large Power PT Cryocooler -Cooling power at 6.7kW compressor- KEK original for Large Proto For final calorimeter 6.7kW, 4Hz

7 7 Results and Further Tests -Achieved cooling power of 190W at 165K (6.7kW compressor) -Orientation dependence test... Horizontal layout for the case of two cold head -Another phase shift configuration (Double Inlet) test... To increase cooling power Schedule -January 2004:Final parameter fixed -February 2004:Fabrication will start -March 2004:Will be delivered (two sets) -Can be installed for the LXe liquid purification test