SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.

Similar presentations


Presentation on theme: "SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007."— Presentation transcript:

1 SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007

2 SiD MDI Issues Tom Markiewicz/SLAC SiD Collaboration Meeting 09 April 2007

3 2007.04.09 SiD Collab-FNAL SiD MDI 3 of 28 2006-05-07 BNL Discussion 305 mm OD Cryostat 512 mm OD Cryostat 70mm x 1.7m AntiSolenoid Cryostat 60cm OD Support Tube 38cm OD Support Tube Space to Open Door Beampipe

4 2007.04.09 SiD Collab-FNAL SiD MDI 4 of 28 QD0 Cryostat in SiD @ L*=3.664m 380mm 3258mm 264mm 370mm 524mm 763mm Beamcal Rear @ 3.300m Feedback BPM

5 2007.04.09 SiD Collab-FNAL SiD MDI 5 of 28 SiD r<50cm, L*=3.664m, 14mrad, Push-Pull, QF@9.5m, Door Closed 3339mm 2207mm Liquid He Line 25.6mm 30mm

6 2007.04.09 SiD Collab-FNAL SiD MDI 6 of 28 SiD Final Doublet Support and Access Plan with Push Pull @ 14mrad Crossing angle, L*=3.664m Three concepts –Permanent liquid He feed line from barrel to QD0 with loop large enough to allow 3m door opening Need to iterate with BNL on diameter of pipe and geometry constraints of cold current and liquid helium feeds –10cm (?) radial cutback in endcap iron yoke to allow it to pass over back end of QD0 cryostat –Drop idea of cantilevered support tube QD cryostat and FCAL package have integrated rail system Endcap doors have linear bearings which support the rails and permit door to slide over the QD0+FCAL package when door is open Is this compatible with “cutback” in yoke?

7 2007.04.09 SiD Collab-FNAL SiD MDI 7 of 28 SiD r<50cm, L*=3.664, 14mrad Crossing Angle, Push-Pull, Door Open Liquid He Line

8 2007.04.09 SiD Collab-FNAL SiD MDI 8 of 28 Door Closed, Permanent QD0 Liquid He Line Liquid He Line “PACMAN” Shielding CLOSED Door Earthquake “Foot”

9 2007.04.09 SiD Collab-FNAL SiD MDI 9 of 28 Door Open, Permanent QD0 Liquid He Line Liquid He Line “PACMAN” Shielding

10 2007.04.09 SiD Collab-FNAL SiD MDI 10 of 28 Plan & Elevation View of FCAL/QD0 Support Door QD0 FCAL Ignore for the moment fact that I have drawn endcap ECAL/HCAL down to r=20cm and yoke at 30cm

11 2007.04.09 SiD Collab-FNAL SiD MDI 11 of 28 FCAL/QD0 Supported with Door Open FCAL QD0 DoorRail Extensions

12 2007.04.09 SiD Collab-FNAL SiD MDI 12 of 28 Three beampipe shapes have been considered over time for SiD Flat at 12mm for VXD, flared to O.D. of Lumical (190mm) @ z min = 1.68m of endcap ECAL Flat at 12mm for VXD, flared to I.D. of Lumical (86.5mm) @ z min = 1.68m of endcap ECAL Flat at 12mm for VXD, flared rapidly to clear pair stay free until r=86.5mm (r min of Lumical @ z min = 1.68m), then cylindrical In all cases, beam pipe then becomes conic and follows inner surface of mask until beampipe

13 2007.04.09 SiD Collab-FNAL SiD MDI 13 of 28 12mm Beam Pipe and VXD Detail

14 2007.04.09 SiD Collab-FNAL SiD MDI 14 of 28 Detail of current beampipe (red)

15 2007.04.09 SiD Collab-FNAL SiD MDI 15 of 28 Often forgotten points that need discussion There are TWO parts to “LumiCAL” whose relative importance has yet to be studied –Low radius extension of endcap ECAL=Lumi1 –Large radius part of “Beamcal” beyond region where pairs hit= Lumi2 The very heavy forward detector and masking system (Lum1, Mask (instrumented as HCAL or not?), Lum2+Beamcal package must NOT be cantilevered off QD0 cryostat EXCEPT when the door is open

16 2007.04.09 SiD Collab-FNAL SiD MDI 16 of 28 Elevation & Plan Views of Far- Lumi/BeamCal from SiD DOD Has any thought been given to details of the Far Luminosity Monitor?

17 2007.04.09 SiD Collab-FNAL SiD MDI 17 of 28 Unlike SLD, Tracker CANNOT Be used to Support FCAL+Mask Package  MUST HANG OFF QD0

18 2007.04.09 SiD Collab-FNAL SiD MDI 18 of 28 FCAL BeamPipe Discussions SiD FCAL group focused on ONE Device which covers 30-80mrad and to a first approximation ignores LUMI aspects of BEAMCAL (inspired by LCD Design) LumiCal Inner Edge  30mrad about outgoing beam LumiCal Outer Edge  113mrad about 0mrad (ECAL) LumiCal Fiducial Region  40-80mrad about outgoing beam BeamCal Outer Edge  40mrad about outgoing beam LumiCal  25 X 0 Silicon - Tungsten BeamCal  25 X 0 Rad-hard Silicon or Diamond - Tungsten

19 2007.04.09 SiD Collab-FNAL SiD MDI 19 of 28 113mrad<FCAL<51mrad with 80 mrad beampipe need to rethink LUMICAL-ECAL radial overlap @ z=1.68m

20 2007.04.09 SiD Collab-FNAL SiD MDI 20 of 28 Conceptual Solution for R20 Mechanics is Needed Support points Bellows Flanges Alignment and adjustment features Vacuum features (if any) at z<7m (end of QD0 cryostat) Cable & Gas service routing Rethinking of access requirements in PUSH-PULL –On-beamline access for rapid repair Bill Cooper reminds us that length of endcap CAL package (1.1m) must be subtracted from nominal door opening to find remaining access length –Off-beamline access for VXD or TRACKER replacement

21 2007.04.09 SiD Collab-FNAL SiD MDI 21 of 28 T. Maruyama Recalculation of ALL Backgrounds for Current Layout 03 April 2007 (see BDS) Apertures: QD0Beampipe@IP Low ZQD1S R=1.0 cm@z=-3.51 m1.2 cm@0.0m 1.35 cm @2.85-2.95m 1.5 cm @5.5-6.56m 14 mrad crossing geometry in Geant 3 and FLUKA

22 2007.04.09 SiD Collab-FNAL SiD MDI 22 of 28 Is M2 NEEDED or NOT????

23 2007.04.09 SiD Collab-FNAL SiD MDI 23 of 28 No M2 Mask Needed

24 Bonus Material Follows

25 2007.04.09 SiD Collab-FNAL SiD MDI 25 of 28 Pair Radius in cm at Z=168 cm 4 Tesla5 Tesla ANTI-DIDNO DIDDIDANTI-DIDNO DIDDID N 5.2 / 4.75.1 / 5.55.8 / 6.54.7 / 4.14.4 / 5.15.3 / 6.1 Q 4.7 / 4.24.4 / 5.15.3 / 6.04.2 / 3.83.8 / 4.64.8 / 5.6 Y 4.6 / 4.24.6 / 5.15.5 / 6.04.3 / 3.94.1 / 4.64.9 / 5.7 P 6.3 / 6.06.2 / 6.86.8 / 7.65.7 / 5.35.5 / 6.16.4 / 7.0 H 7.0 / 6.66.8 / 7.37.4 / 8.26.2 / 5.96.1 / 6.76.7 / 7.5 Radius in black is measured from solenoid axis (x,y) = (0., 0.). Radius in red is measured from extraction line (x,y) = (-1.176 cm, 0.)

26 2007.04.09 SiD Collab-FNAL SiD MDI 26 of 28 VXD and Support Structures

27 2007.04.09 SiD Collab-FNAL SiD MDI 27 of 28 R-Z View of the Pixel VXD

28 2007.04.09 SiD Collab-FNAL SiD MDI 28 of 28 SiD Open for Access to the VXD Region What Opening is Required for Access ON Beamline?