HISD | Milby High School Transition Plan Milby High School Transition Plan May 2014 HOUSTON INDEPENDENT SCHOOL DISTRICT.

Similar presentations


Presentation on theme: "HISD | Milby High School Transition Plan Milby High School Transition Plan May 2014 HOUSTON INDEPENDENT SCHOOL DISTRICT."— Presentation transcript:

1 HISD | Milby High School Transition Plan Milby High School Transition Plan May 2014 HOUSTON INDEPENDENT SCHOOL DISTRICT

2 HISD | Milby High School Transition Plan 2  This will allow construction to begin on the new school being rebuilt under the 2012 bond program. Need for relocation  Final design of the new building is currently underway.  Construction will begin later this year.

3 HISD | Milby High School Transition Plan 3  Milby 10 th-, 11 th- and 12 th -grade students will relocate to the Jones High School campus, which also serves as a home for South Early College High School and the Futures Academies at Jones. Transition plan  Milby 9 th -grade students will relocate to Attucks Middle School.

4 HISD | Milby High School Transition Plan 4  Though multiple schools may be located on one campus, each will be kept as separate as possible.  All four principals are working together to develop a smooth transition: Milby High School Principal Roy de la Garza Futures Academies at Jones Principal Geovanny Ponce South Early College High School Principal Steven Gourrier Attucks Middle School Principal Dierdre Sharkey Student organization

5 HISD | Milby High School Transition Plan 5  Students will be temporarily housed at Jones during the construction process, which could take up to three years.  The new school is slated to open in August 2017. Timeline

6 HISD | Milby High School Transition Plan 6  The district looked at a variety of alternatives before recommending this transition plan. Other options  This was the only plan that allowed 10 th through 12 th grades to be kept together in one location.

7 HISD | Milby High School Transition Plan 7  After a thorough review, this option was determined to be the least disruptive to the Milby community.  This option also suits our space requirements and building budget while also allowing us to keep our focus on student safety. Swing space options

8 HISD | Milby High School Transition Plan 8  In 2012, voters approved a new school that would preserve the school’s architecturally significant building.  Preserving the historic entrance and other unique features of the building limits the ability to phase the project on site. Phasing on site not an option

9 HISD | Milby High School Transition Plan 9  Part of the issue is the size of the Milby campus.  The construction team estimates it could take at least four years from the start of construction to phase Milby on the current campus.  This extended period of construction would be more disruptive to the Milby community. Phasing on site not an option

10 HISD | Milby High School Transition Plan 10  Under the current plan, some classroom portable buildings will be used as needed.  It would have been cost-prohibitive to use additional portables, which are funded by the construction budget. Temporary buildings

11 HISD | Milby High School Transition Plan 11  Students who live more than two or more miles from their assigned campuses are eligible for transportation services at district-designated stops.  For Milby students who are being relocated to Attucks or the Jones campus, bus pick-up and drop-off will be at Milby High School in the back parking lot, on the south side of the building, next to Harding Street. Transportation

12 HISD | Milby High School Transition Plan 12  Bus schedules will be ready during the week of August 18.  The athletic department will provide transportation back to Milby High School after athletic practices. Transportation

13 HISD | Milby High School Transition Plan  Most Milby games and practices will be held either at Attucks Middle School or at district stadiums.  All sports will be offered.  Most sports will be offered at Attucks Middle School, though some select indoor sports — such as basketball, volleyball and swimming — may be offered at the Jones campus. 13 Athletics

14 HISD | Milby High School Transition Plan 14  Athletic practices for most sports will be held at Attucks Middle School because space is available.  HISD will provide transportation from Jones to Attucks Middle School for all 10 th through 12 th grade students housed at Jones. Athletics

15 HISD | Milby High School Transition Plan 15 Pool at Attucks MS

16 HISD | Milby High School Transition Plan 16 Gymnasium at Attucks MS

17 HISD | Milby High School Transition Plan 17 Band Hall at Attucks MS

18 HISD | Milby High School Transition Plan 18 Athletic Fields at Attucks MS

19 HISD | Milby High School Transition Plan 19 Pool at Jones Campus

20 HISD | Milby High School Transition Plan 20 Gymnasium at Jones Campus

21 HISD | Milby High School Transition Plan 21 Life Skills Space at Jones Campus

22 HISD | Milby High School Transition Plan 22 Questions?