Presentation is loading. Please wait.

Presentation is loading. Please wait.

NC WISE Test Upload Process. Benefits of New Process The ability to upload all tests via one mechanism (previously, a front-end application and a back-

Similar presentations


Presentation on theme: "NC WISE Test Upload Process. Benefits of New Process The ability to upload all tests via one mechanism (previously, a front-end application and a back-"— Presentation transcript:

1 NC WISE Test Upload Process

2 Benefits of New Process The ability to upload all tests via one mechanism (previously, a front-end application and a back- end load were required) Error feedback so that errors can be corrected expeditiously

3 Three-step process 1.The Test Coordinator copies SCO file(s) to SUBMIT_SCO folder on SecureShell. 2.The Accountability web interface (https://www.rep.dpi.state.nc.us/app/wisesco/) will update the status of any uploaded files approximately every few seconds. Once files are uploaded to the SecureShell site, the job quickly moves the files to a staging site to be picked up by the NC WISE portion of the process. At this point they are marked ‘Pending’. 3.The actual import of test data into eSIS will occur as a nightly batch job. Once NC WISE has completed its processing, the files are marked ‘Processed’.

4 SecureShell SUBMIT_SCO folder

5 “Current Files” Screen Navigation areaFilenameStatus

6 “File Detail” Screen Score summary Error summary

7 Cancel Option

8 Error Report Can sort by clicking on column headings Can print through browser


Download ppt "NC WISE Test Upload Process. Benefits of New Process The ability to upload all tests via one mechanism (previously, a front-end application and a back-"

Similar presentations


Ads by Google