Production Planning and Control.  APP does not account for the detailed timing of flow within the production system  MRP material requirement planning.

Similar presentations


Presentation on theme: "Production Planning and Control.  APP does not account for the detailed timing of flow within the production system  MRP material requirement planning."— Presentation transcript:

1 Production Planning and Control

2  APP does not account for the detailed timing of flow within the production system  MRP material requirement planning was developed to deal with the complexity of these problems.

3

4  Difference between Aggregate production planning and Material requirement planning?  Aggregate production planning do not account for the detailed timing of flow with in the production

5

6  When a master schedule is proposed, the first problem is to convert it efficiently into the requirements for purchased and manufactured parts. This is referred to performing a parts explosion  T o present a formal description of the problem, lets divide item produced into three categories, end items, subassemblies and parts.  Notations  End items “e”  Sub assemblies “s”  Parts “p”

7  Let bill of material for an end product is defined by row vector B i B i =(b i1, b i2,…… b ij) Where b ij is the number of items j required to make directly 1 unit of item i. This is the representation of number of parts in one unit This is the representation of total quantity of parts

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36


Download ppt "Production Planning and Control.  APP does not account for the detailed timing of flow within the production system  MRP material requirement planning."

Similar presentations


Ads by Google