FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.

Similar presentations


Presentation on theme: "FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley."— Presentation transcript:

1 FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley

2 FM2 PPEREMC 2 UCB, March 16, 2006 Test Requirements Launch Site Requirements Test in Launch configuration with instruments off RE02, RS03 per THEMIS ICD with Boeing Self Compatibility Requirement Test in plugs-out configuration with instruments on RE02, RE04, RS03 per THEMIS Environmental Spec Limit RE02 to science sensitivity band, 20Hz-1MHz, plus the probe receiver band 1.7-2.3GHz Limit RS03 to probe transmitter band. Also power up transmitter to verify self-compatibility. Test Procedures in sign-off: THM_MINT_041. UCB Test Procedure THEMIS_EMC_TP. JPL Facilities Procedure

3 FM2 PPEREMC 3 UCB, March 16, 2006 Launch Site Levels Launch Mode RE02 Limit

4 FM2 PPEREMC 4 UCB, March 16, 2006 THEMIS RE02 Levels

5 FM2 PPEREMC 5 UCB, March 16, 2006 THEMIS RE04 Levels

6 FM2 PPEREMC 6 UCB, March 16, 2006 JPL EMC Facility

7 FM2 PPEREMC 7 UCB, March 16, 2006 JPL EMC Facility Facility EMI background meets THEMIS requirements Will have to look between 60Hz harmonics for RE04 Low frequency RE02 (<14kHz) on a best effort basis Facility test equipment adequate for THEMIS measurements Frequency range, sensitivity, power, etc. Facility size adequate for Probe and EGSE see following section on layout of test Probe will be fork-lifted into facility on roll-around stand (no crane) Facility cleanliness level can meet THEMIS requirements has been demonstrated on previous project

8 FM2 PPEREMC 8 UCB, March 16, 2006 Launch Mode Setup Probe connected to EGSE via Umbilical Instruments Off (Launch Mode) Launch Site Test Levels (RE02, RS03)

9 FM2 PPEREMC 9 UCB, March 16, 2006 Operational Setup Probe connected to EGSE via RF (Hat) Instruments On (Operational Mode) THEMIS Science Test Levels (RE02, RE04, RS03)