Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 22c:31 Algorithms Minimum-cost Spanning Tree (MST)

Similar presentations


Presentation on theme: "1 22c:31 Algorithms Minimum-cost Spanning Tree (MST)"— Presentation transcript:

1 1 22c:31 Algorithms Minimum-cost Spanning Tree (MST)

2 Minimum-Cost Spanning Tree weighted connected undirected graph spanning tree cost of spanning tree is sum of edge costs find spanning tree that has minimum cost

3 Example The graph has 10 edges. Spanning tree has only n - 1 = 7 edges. Need to either select 7 edges or discard 3. 1357 2468 2 4 6 3 81014 127 9

4 We are interested in: Finding a tree T that contains all the vertices spanning tree of a graph G spanning tree and has the least total weight over all minimum-spanning tree(MST) such trees minimum-spanning tree (MST)

5 Crucial Fact min-weight “bridge“ edge The Crucial Fact about MST e

6 The basis of all algorithms Proposition: Let G = (V,E) be a weighted graph, and let V 1 and V 2 be a partiotion of V (that is, V 1 and V 2 are two disjoint nonempty subsets and V = V 1 U V 2 ). Furthermore, let e be an edge with minimum weight from among those with one vertex in V 1 and the other in V 2. There is a minimum spanning tree T that has e as one of its edges.

7 Crucial Fact min-weight “bridge“ edge e a Justification: If T doesn’t use e but use a to connect V 1 and V 2, then T’ = T U { e} – { a } is another spanning tree lighter than T.

8 Edge Selection Greedy Strategies Start with an n-vertex 0-edge forest. Consider edges in ascending order of cost. Select edge if it does not form a cycle with already selected edges.  Kruskal’s method. Start with one vertex (a tree of a single vertex) and grow it into an n-vertex tree by repeatedly adding a vertex and an edge. When there is a choice, add a least cost edge.  Prim’s method.

9 Edge Rejection Greedy Strategies Start with the connected graph. Repeatedly find a cycle and eliminate the highest cost edge on this cycle. Stop when no cycles remain. Consider edges in descending order of cost. Eliminate an edge provided this leaves behind a connected graph.

10 Kruskal’s Method Start with a forest that has no edges. 1357 2468 2 4 6 3 81014 12 7 9 1357 2468 Consider edges in ascending order of cost. Edge (1,2) is considered first and added to the forest.

11 Kruskal’s Method Edge (7,8) is considered next and added. 1357 2468 2 4 6 3 81014 12 7 9 1357 2468 2 3 Edge (3,4) is considered next and added. 4 Edge (5,6) is considered next and added. 6 Edge (2,3) is considered next and added. 7 Edge (1,3) is considered next and rejected because it creates a cycle.

12 Kruskal’s Method Edge (2,4) is considered next and rejected because it creates a cycle. 1357 2468 2 4 6 3 81014 12 7 9 1357 2468 2 3 4 Edge (3,5) is considered next and added. 6 10 Edge (3,6) is considered next and rejected. 7 Edge (5,7) is considered next and added. 14

13 Kruskal’s Method n - 1 edges have been selected and no cycle formed. So we must have a spanning tree. Cost is 46. Minimum-cost spanning tree is unique when all edge costs are different. 1357 2468 2 4 6 3 81014 12 7 9 1357 2468 2 3 4 6 10 7 14

14 Prim’s Method Start with any vertex (a 1-vertex tree). 1357 2468 2 4 6 3 81014 12 7 9 5 Get a 2-vertex tree by adding a cheapest edge. 6 6 Get a 3-vertex tree by adding a cheapest edge. 3 10 Grow the tree one edge at a time until the tree has n - 1 edges (and hence has all n vertices). 4 4 2 7 1 2 7 14 8 3

15 Greedy Minimum-Cost Spanning Tree Methods Can prove that all result in a minimum-cost spanning tree. Let n = |V| and m = |E|. Kruskal’s uses union-find trees to run in –O(m log m) time (for sorting edges) Prim’s method:  O(n 2 ) using adjacency matrix.  O((n + m) log n) using adjacency list and a heap.

16 Pseudocode For Kruskal’s Method Let G = (V, E), n = |V|. Start with an empty set T of edges. while (E is not empty && |T| != n-1) { Let (u,v) be a least-cost edge in E. E = E - {(u,v)}. // delete edge from E if ((u,v) does not create a cycle in T) Add edge (u,v) to T. } if ( |T| == n-1) T is a mininum-cost spanning tree. else G has no spanning tree.

17 Data Structures For Kruskal’s Method Edge set E. Operations are:  Is E empty?  Select and remove a least-cost edge. Use a min heap of edges.  Initialize. O(m) time.  Remove and return m least-cost edges: O(m log m) time We may sort E first and select edges one by one from left to right. O(m log m) time

18 Data Structures For Kruskal’s Method Set of selected edges T. Operations are:  Does T have n - 1 edges?  Does the addition of an edge (u, v) to T result in a cycle?  Add an edge to T.

19 Data Structures For Kruskal’s Method Use an array linear list for the edges of T.  Does T have n - 1 edges? Check size of linear list. O(1) time.  Does the addition of an edge (u, v) to T result in a cycle? Not easy.  Add an edge to T. Add at right end of linear list. O(1) time.

20 Data Structures For Kruskal’s Method Does the addition of an edge (u, v) to T result in a cycle? 1357 2468 2 3 4 6 7 Each component of T is a tree. When u and v are in the same component, the addition of the edge (u,v) creates a cycle. When u and v are in the different components, the addition of the edge (u,v) does not create a cycle.

21 Data Structures For Kruskal’s Method 1357 2468 2 3 4 6 7 Each component of T is defined by the vertices in the component. Represent each component as a set of vertices.  {1, 2, 3, 4}, {5, 6}, {7, 8} Two vertices are in the same component iff they are in the same set of vertices.

22 Data Structures For Kruskal’s Method When an edge (u, v) is added to T, the two components that have vertices u and v combine to become a single component. 1357 2468 2 3 4 6 7 In our set representation of components, the set that has vertex u and the set that has vertex v are united.  {1, 2, 3, 4} U {5, 6} => {1, 2, 3, 4, 5, 6}

23 Data Structures For Kruskal’s Method Initially, T is empty. 1357 2468 Initial sets are:  {1} {2} {3} {4} {5} {6} {7} {8} Does the addition of an edge (u, v) to T result in a cycle? If not, add edge to T. Each set has a name and let find(x) return the name of the set containing vertex x. s 1 = find(u); s 2 = find(v); if (s 1 != s 2 ) union(s 1, s 2 );

24 Data Structures For Kruskal’s Method Use FastUnionFind: each of union and find takes practically constant time. Initialize.  O(n) time. At most 2m finds and n-1 unions.  Very close to O(n + m). Min heap operations to get edges in increasing order of cost take O(m log m). Overall complexity of Kruskal’s method is O(n + m log m).

25 Prim‘s Algorithm 1.All vertices are marked as not visited 2. Any vertex v you like is chosen as starting vertex and is marked as visited (define a cluster C) 3.The smallest-weighted edge e = (v,u), which connects one vertex v inside the cluster C with another vertex u outside of C, is chosen and is added to the MST and u is added into C. 4. The process is repeated until a spanning tree is formed

26 Prim’s MST Algorithm Prim’s algorithm: key[v] := min(key[v], w(u,v)) Dijkstra’s algorithm: key[v] := min(key[v], key[u]+w(u,v))

27 Prim’s Example

28

29 Prim’s Algorithm

30

31

32 Get spanning tree by connecting nodes with their parents:

33 Runtime for Prim’s Algorithm The inner loop takes O(E lg V) for the heap update inside the O(E) loop. This is over all executions, so it is not multiplied by O(V) for the while loop (this is included in the O(E) runtime through all edges. The Extract-Min requires O(V lg V) time. O(lg V) for the Extract-Min and O(V) for the while loop. Total runtime is then O(V lg V) + O(E lg V) which is O(E lg V) in a connected graph (a connected graph will always have at least V-1 edges). O(V) if using a heap O(V) O(lgV) if using a heap O(E) over entire while(Q<>NIL) loop O(lgV) to update if using a heap!


Download ppt "1 22c:31 Algorithms Minimum-cost Spanning Tree (MST)"

Similar presentations


Ads by Google