SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.

Similar presentations


Presentation on theme: "SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources."— Presentation transcript:

1 SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources July 25, 2014

2 Fundamental Water Project Operations What are the Delta Salinity Standards? How do the Projects Manage Salinity? Unique Challenges this Year and Next

3 Store Water Release Storage Summer Flow FallSpringWinter Project Reservoir Operation

4 4 Salinity Intrusion Before and After Managed Upstream Reservoirs After (1944 –1990) Before (1920 –1943)

5 D-1641 Bay-Delta Standards Locations

6 6

7 The Projects have 3 “knobs” to turn 1) Releases 2) DCC Gate 3) Exports

8 Daily Tidal Cycle

9 Flow of Flood and Ebb Tides (cfs) 340,000330,000 80,000 71,000 58,000 47,000 2,000 1,000

10 Overlay of Monthly Spring/Neap Cycle

11 Travel Times Present a Challenge

12 Delta Lake Shasta Lake Oroville Folsom Lake Outflow CVP/SWP Coordinated Operations Agreement (COA) BanksJones

13 DCC Gate Trade-Offs: DCC Gate Operations May Conflict with Fish Migration

14 January 2014

15 Emergency Drought Barriers Sutter Slough Steamboat Slough West False River

16 Clifton Court Forebay Electrical Conductivity Dec. 2013 – May 2014 Sacramento River at Verona Flow


Download ppt "SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources."