1 Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris Date:January 2011

2 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Agenda Validation of SC-214 / WG-78 services Data Comm Lab capabilities To be done / Work in progress Data Comm Lab working environment –THALES avionics and ground test equipment –Honeywell avionics –Rockwell Collins avionics –FAA Tech Center ground system Data Comm Lab Architecture Prototype and Validation Roadmap 2

3 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm Lab – Validation of Services 3 CMCPDLCADS-CFIS End system applications DLIC ACM ACL AMC DCL D-TAXI D-OTIS 4D-TRAD FLIPINT WP 1 WP 2 DLIC ACM ACL AMC DCL D-TAXI D-ATIS Lab Validation Capabilities Standards June 2011 Complete by:Services It is anticipated that such services will be validated by other validation projects as part of SESAR. This also holds true for the validation of D-OTIS. The time-frame for this validation will be 2013 ?? Services Validation Capabilities

4 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) FAA Data Comm / Industry Partnerships (OTAs) Rockwell Collins –RTCA SC-214 / EUROCAE WG-78 WP-1 avionics Honeywell –RTCA SC-214 / EUROCAE WG-78 WP-1 avionics THALES –RTCA SC-214 / EUROCAE WG-78 WP-1 & 2 avionics –Ground System (WP-1 and WP-2) 4 Data Comm LAB development @ Tech Center

5 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm LAB capabilities to Date Air / Ground VDL Mode 2 Infrastructure –Air / Ground Router with Park-Air radio interface –Ground / Ground Router for routing and discovery –RF radio cloud –Addressing Plan for end to end connectivity (routing / discovery and forwarding) CMA (end system application) –Based on ICAO DOC 9880 end system requirements –Based on RTCA SC-214 ATS Interop Requirements PM_CPDLC (end system application) –Based on ICAO DOC 9880 integrity algorithm –Based on RTCA SC-214 ATS Interop Requirements 5

6 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Data Comm LAB capabilities to Date (cont..) PM_CPDLC end system integration –Integrated Tech Center CPDLC end system with both Rockwell Collins, and Honeywell CPDLC end systems Via air / ground infrastructure –Developed logging and tracking database for all message exchanges at all levels of the protocol stack Developed GUI –Contains the entire RTCA SC-214 / EUROCAE WG-78 message set for generation / scripting, and display of messages –Developed supportive test tools under the GUI to allow for greater flexibility in decoding and encoding of messages Installed and Integrated THALES Air FANS workstation with Ground FANS workstation –As an initial delivery under the OTA –Supports RTCA SC-214 / EUROCAE WG-78 DCL service 6

7 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress Develop common TEST procedures / cases (in progress) –Addresses the Interoperability Requirements –Test procedures / cases must be common across all platforms Develop Traceability Matrix Document (in progress) –Traces the Test procedures / cases with Ground System requirements, and SC- 214 requirements Develop PM_FIS (end system application) (in progress) –Based on ICAO DOC 9880 for technical requirements –Based on RTCA SC-214 for SPR, and Interop requirements –D-OTIS service under FIS (will develop D-ATIS initially for validation) Implement Link 2k+ backwards compatible requirements (in progress) –As part of the ATS interop for validation 7 Target: Jan 21, 2010 Target: Mar 24, 2011 Target: Apr 25, 2011 Target: Feb 11, 2011

8 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress (cont.) Implement FANS Accommodation (in progress) –Based on Interop Requirements –FANS Interop for validation Develop Data Comm Gateway (in progress) –Supports integration of DESIREE for Data Comm outreach program –Provides interface to NIEC –Other interfaces (as necessary) Develop LAB Access Point with external partners –EUROCONTROL Experimental Center (EEC) –Oak City IFCET lab –Boeing –Airbus –Others (as necessary) 8 Target: Feb 18, 2011 Target: Mar 31, 2011 Target: May 27, 2011

9 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) To be done / Work in progress (cont.) Actual Validation Conduct and Reporting (WP-1) –Begin conduct January 2011 –Plan quick look reports / results March 2011 –Plan to submit Final report June 2011 9

10 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Thales Air and Ground System 10 Initial delivery Included: Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI Dual-Stack system ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries Include: Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) Full WP-2 (Nov / Dec 2011)

11 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) 11 Tha les Air/Ground – system example Airborne Simulator Air Ground Datalink Server and Ground Simulator Tool Ground Segment Simulation and Test Facility CMU HMI Pre-production CMU VDL/2 radio Data Service Simulator Airborne Segment Simulation and Test Facility RX/TX Coax + Attenuators Ground System Simulation and Test Facility based on THALES Air Ground Data link Server (AGDS) and message test tools HMI Dual-Stack system ATN Baseline1 CM/CPDLC/ADS-C message set (DO-280/ED-110B) Planned deliveries: Ground WP-1 (March 2011) A/G DSP (March 2011) AIR WP-1 (DCL only, May 2011) AIR full WP-1 (June 2011) Full WP-2 (Nov / Dec 2011) Initial delivery:

12 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Honeywell Avionics Deliveries Included Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) CM PM_CPDLC Link 2000+ Services build WP-1 Services build 12 Ship-sets Include: Mark II CMUs MCDUs, VDRs APMs Cockpit Printers Gables Radio Tuning Panels I/O Junction Panels

13 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Rockwell Collins Avionics 13 Deliveries Included Link 2000+ (July 2010) SC-214 WP-1 (Dec 2010) CM PM_CPDLC PM_FIS Link 2000+ Services build WP-1 Services build Ship-sets Include: CMU-900 VHF-2100 (VDRs) IDC 900 (CDU) APM-900 Junction and Tuning Panels

14 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) Tech Center Ground System Available NOW CM PM_CPDLC WP-1 SC-214 Services Comm Infrastructure G/G routers, A/G routers VDL Mode 2 GS (park-air radios RF cloud GUI (text based) In Progress / Planning : 14 Develop common TEST procedures / cases Develop Traceability Matrix Document Develop PM_FIS (end system application) Implement Link 2k+ backwards compatible reqs. Implement FANS Accommodation requirements Develop Data Comm Gateway (for DESIREE) Develop LAB Access Point with external partners

15 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) 15

16 Federal Aviation Administration FAA Prototype and Validation - activities EUROCONTROL Experimental Center (EEC), Brétigny )(January 27, 2011) RTCA SC-214/EUROCAE WG-78 Prototype/Validation Roadmap 201020112012 Rockwell Avionics (WP-1) Validation Phase – procedures and conduct Tech Center Ground system (WP-1 & WP-2) RTCA SC-214/EUROCAE WG-78 Green Cover Aug 2010 Test Syntax (all messages) Dec 2010 (Blue Label # 2) WP-1 Services June 2011 Test WP-2 Nov 2010 Test Plan / Procedures FRAC process 2009 Honeywell Avionics (WP-1) Dec 2010 (Build # 2) WP-1 Services July 2010 (Build # 1) Limited Services ASN.1 syntax Thales Avionics (WP-1 & WP-2) WP-2 (avionics) May 2011 214/78 DCL ATN/FANS June 2011 Full WP-1 Services ATN/FANS Dec 2011 Full WP-2 Services ATN/FANS WP-1, WP-2 Test Plan, procedures, scenarios Prototype & Validation Plan v1.0 (Sept 2009) 16 July 2010 (Blue Label # 1) Limited Services ASN.1 Syntax Dec 2010 Test WP-1 Prototype & Valid Plan v2.0 (Dec 2010) WP-1 services (avionics) Thales Ground System (WP-1 & WP-2) WP-2 (ground system) Dec 2010 214/78 DCL ATN/FANS March 2011 Full WP-1 Services ATN/FANS Nov 2011 Full WP-2 Services ATN/FANS Dec 2010 (Phase 4) WP-1 Services Aug 2010 (Phase 3) Limited Services ASN.1 Syntax Sept 2011 (Phase 5) WP-2 Services + A/G Subnetwork May 2010 (Phase 2) Lab tools/infra Feb 2010 (Phase 1) Initial Lab Env. WP-2 (ground system) …….Data Comm demos/trials…..2012 