J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.

Similar presentations


Presentation on theme: "J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II."— Presentation transcript:

1 J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II Accel. Phys., J. Wu, SLAC

2 LAYOUT Previously BC1 @ 250 MeV for LCLS Pros and Cons of setting BC1 @ 300 ~ 350 MeV for LCLS-II Hardware consideration: cost and future 360 Hz operation Macroscopic: chicane strength Stability and tolerance Microbunching instability: CSRTrack/IMPACT simulation indicating emittance growth during the compression, higher BC1 energy helps (example: Swiss XFEL moved BC1 from 256 MeV to 350 MeV) LCLS-II Accel. Phys., J. Wu, SLAC

3 HARDWARE CONSIDERATION Cost benefit for locating BC1 @ 300 ~ 350 MeV Gird 11-3 is now the positron source, and it will be either replaced by a chicane or accelerator structure Putting BC1 on gird 11-3 and keep RF cavities for gird 11-2 will be cost effective Future 360 Hz operation will be running with unSLEDed cavities Setting BC1 @ 300 ~ 350 MeV for 120 Hz will make it possible to still have the option of having BC1 @ 250 MeV for 360 Hz operation Setting BC1 @ 250 MeV for 120 Hz operation will make it necessary to have cavities on gird 11-1 be SLEDed. LCLS-II Accel. Phys., J. Wu, SLAC

4 CHICANE SETUP Assuming adding 200 MeV, so that the peak energy gain of is about 345 MeV between DL1 to BC1 (recall that for LCLS, it is about 145 MeV)  Keep setting the X-band at  160 degree, but vary the amplitude One Example: setting BC1 energy @ 380 MeV and cancelling the second order curvature L1S @ -21.8 degree (compared to ~ -22 degree) L1X peak energy gain is 32.5 MeV (compared to ~ 20 MeV for LCLS) LCLS-II Accel. Phys., J. Wu, SLAC

5 BASIC CONSIDERATION Generic two bunch compressors system: after BC 2 LCLS-II Accel. Phys., J. Wu, SLAC

6 OPTIMIZATION Jitter model: normal distribution for the LINAC phases LCLS-II Accel. Phys., J. Wu, SLAC

7 OPTIMIZATION Objective function: including de-chirping in L3 LCLS-II Accel. Phys., J. Wu, SLAC

8 OPTIMIZATION Analytically complete the integrals LCLS-II Accel. Phys., J. Wu, SLAC

9 OPTIMIZATION Close form for the objective function with weight function: W i,0 LCLS-II Accel. Phys., J. Wu, SLAC

10 LAYOUT BC1 @ 250 MeV Set points BC1: R 56 = 45.5 mm, Energy 250 MeV, peak current 250 Amp L1S: – 22 degree L1X: – 160 degree; 20 MeV L2: – 35.6 degree BC2: R 56 = 25.2 mm, Energy 4.3 GeV, peak current 3 kA LCLS-II Accel. Phys., J. Wu, SLAC BC2 4.3 GeV BSY 14 GeV TCAV3 5.0 GeV BC1 250 MeV L1S wirescanner L1X 4 wire-scanners L2-linac L3-linac DL1 135 MeV L0 gun

11 PROFILES BC1 LCLS-II Accel. Phys., J. Wu, SLAC Final CSR, LSC included in LiTrack, good agreement with Elegant [Bosch, Kleman, Wu, PRSTAB, 2008]

12 LAYOUT BC1 @ 335 MeV Set points BC1: R 56 = 39.5 mm, Energy 335 MeV, peak current 220 Amp L1S: – 19.5 degree L1X: – 160 degree; 30 MeV L2: – 31.8 degree BC2: R 56 = 26.2 mm, Energy 4.3 GeV, peak current 3 kA LCLS-II Accel. Phys., J. Wu, SLAC BC2 4.3 GeV BSY 14 GeV TCAV3 5.0 GeV BC1 335 MeV L1S wirescanner L1X 4 wire-scanners L2-linac L3-linac DL1 135 MeV L0 gun

13 PROFILES BC1 LCLS-II Accel. Phys., J. Wu, SLAC Final CSR, LSC included in LiTrack, good agreement with Elegant [Bosch, Kleman, Wu, PRSTAB, 2008]

14 EMITTANCE BC1 compressing to 250 Amp peak current does not see much slice emittance growth LCLS-II Accel. Phys., J. Wu, SLAC Example for BC1 @ 335 MeV: Impact simulation

15 LAYOUT BC1 @ 380 MeV Set points BC1: R 56 = 36.2 mm, Energy 380 MeV, peak current 300 Amp L1S: – 21.8 degree L1X: – 160 degree; 32.5 MeV L2: – 29.6 degree BC2: R 56 = 25.7 mm, Energy 4.3 GeV, peak current 3 kA LCLS-II Accel. Phys., J. Wu, SLAC BC2 4.3 GeV BSY 14 GeV TCAV3 5.0 GeV BC1 380 MeV L1S wirescanner L1X 4 wire-scanners L2-linac L3-linac DL1 135 MeV L0 gun

16 PROFILES BC1 LCLS-II Accel. Phys., J. Wu, SLAC Final CSR, LSC included in LiTrack, good agreement with Elegant [Bosch, Kleman, Wu, PRSTAB, 2008]

17 TOLERANCE BC1 @ 250 MeV LCLS-II Accel. Phys., J. Wu, SLAC BC1 @ 380 MeV 3.95 % Assuming L1S has 0.06 degree rms phase jitter 1.36 %

18 TOLERANCE BC1 @ 250 MeV LCLS-II Accel. Phys., J. Wu, SLAC BC1 @ 380 MeV 2.77 % Assuming injector has 200 fs rms timing jitter 5.04 %

19 Linear compression study with optimization for BC1 @ 300 -- 350 MeV up to bypass line Linear compression study with optimization for BC1 @ 300 -- 350 MeV up to bypass line Longitudinal profile up to bypass line Longitudinal profile up to bypass line Tolerance study: peak current on timing and LINAC phase jitter up to bypass line Tolerance study: peak current on timing and LINAC phase jitter up to bypass line Transverse emittance degradation and microbunching instability with BC1 @ 335 MeV up to @ BC1 do not show much difference compared to the previous design with BC1 @ 250 MeV Transverse emittance degradation and microbunching instability with BC1 @ 335 MeV up to @ BC1 do not show much difference compared to the previous design with BC1 @ 250 MeV  Full machine lattice in Impact code is on going  Strong focusing on sec. 11-2  BC1 dipole strength: keeping same R 56 will increase the B- field by 40 %, assuming same angle, same length  More tolerance study is needed: centroid energy, chirp, etc. DISCUSSION LCLS-II Accel. Phys., J. Wu, SLAC