Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAL Site Report Michel Jouvin LAL / IN2P3

Similar presentations


Presentation on theme: "LAL Site Report Michel Jouvin LAL / IN2P3"— Presentation transcript:

1 LAL Site Report Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr

2 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Main Ressources Changes No major change –More machines and GB like everywhere… Efforts concentrated on SAN deployment –Works very well –Fabric redundancy not yet configured –Still planning heterogeneous SAN in 2003 One more system engineer arrived Oct. 1st IN2P3 national deals for some software –Vmware, Legato Networker

3 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Main Resources 1 TB NFS SMB Appletalk www Mail Print LSF Cluster (batch + interactive) Compaq PWS500 Compaq DS20e Gb Ethernet DS20 PC (250)Mac (100) Experiments Servers (Alpha, HP, Linux) AS 800 5/500 10 Mb Mechanical CAD (Alphas) Electronic CAD (Sun + Cadence) 100 Mb 100 Go FC Xterm

4 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Server Software Updates Linux 7.2 (kernel 2.4.18) completed Started a monitoring project based on Nagios –Nagios presented by INFN at last meeting –Robust collection mechanism/infrastructure –Development of user oriented view of the ressources (Web-based)

5 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Mail Service Still based on Sendmail + IMAP Virus/Spam filtering project just started –Filtering based on message headers criteria rather than contents, using Sendmail milter API More efficient than antivirus, preserve Sendmail advanced features Most viruses can be detected by attachment types Heuristic can be applied to detect spammers –Restrict relaying with authenticated SMTP Upgrade IMAP server to Cyrus v2 –Interested by any experience with Cyrus v2

6 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Windows Infrastructure Desktops –Windows XP deployment on new laptops Server –Replacement of old unattended installation infrastructure by W2K RIS (PXE based) CERN PrinterWizzard in production –Works pretty well –Two main issues : Handling of drivers for some printer types Ability to use PrinterWizzard at LAL and at CERN

7 22/10/2002 LAL Site Report - HEPix - FNAL 2002 Miscellanous Projects IN2P3 ActiveDirectory forest –1 domain per lab(10 participating) –Pilot started recently –Plan to move to production during winter EDG/LCG –One engineer sent to CERN for LCG –G. Grosdidier : Test Group chairman –Plan to resume participation to testbed


Download ppt "LAL Site Report Michel Jouvin LAL / IN2P3"

Similar presentations


Ads by Google