Presentation is loading. Please wait.

Presentation is loading. Please wait.

LEA TRANSITION PLANNING GUIDANCE RHODE ISLAND DEPARTMENT OF EDUCATION READY, SET, GO COMMON CORE!

Similar presentations


Presentation on theme: "LEA TRANSITION PLANNING GUIDANCE RHODE ISLAND DEPARTMENT OF EDUCATION READY, SET, GO COMMON CORE!"— Presentation transcript:

1 LEA TRANSITION PLANNING GUIDANCE RHODE ISLAND DEPARTMENT OF EDUCATION READY, SET, GO COMMON CORE!

2 Rhode Island’s Transition to CCSS Adoption 2010 Transition SY 2010-2013 Full Implementation CCSS SY 2013 - 2014 PARCC Assessment SY 2014-2015

3 Transition Phase 2010-2013 Develop Multi-Year Transition Plan to include:  Curriculum Alignment  When will curricula be aligned to CCSS? Based on data: Which content should be completed first? Consider: Should some grades transition prior to others? OR does it make more sense to roll-out one content at a time for all grades?  Identify Priority or Challenge Standards within CCSS Identify any standards within either content where instruction should begin immediately, prior to completion of curricula alignment?

4 Transition Phase 2010-2013 Develop Multi-Year Transition Plan (continued)  Study of the Standards (Completed by SY2012-2013)  Schedule Study of the Standards per LEA RTTT Scope of Work  Plan roll-out session(s) for all educators in the LEA ; How will each educator learn the process of working with the standards?  Implement plan after LEA personnel have attended Study of the Standards Workshop  After Study of the Standards…Continuing the Understanding  Carefully articulate plan for all educators to have meaningful opportunities to deepen their understanding the CCSS throughout the school year. Utilize the Critical Areas of Focus to provide focus for initial study. Additionally, RIDE CCSS Transition webpage provides host of resources to support implementation (e.g., PD Modules, PARCC Frameworks)

5 Transition Phase 2010-2013 Develop Multi-Year Transition Plan (continued)  Implementation  Create a plan for the Roll-out of CCSS aligned Curricula  Conduct needs assessment regarding Resources & Materials in support of CCSS Curricula  Articulate Professional Development/ Technical Assistance needs of LEA leadership and all educators Deep understanding of CCSS Launch of CCSS curricula Implementation of CCSS curricula  Communication plan  Define how LEA will educate and reach all stakeholders (e.g., families, school committee, community members) to ensure CCSS understanding

6 Student Transition Timeline 2 2 2 2 3 3 2 2 3 3 4 4 2 2 3 3 4 4 5 5 2010- 2011 Locally assessed CC PARCC Common Core Locally assessed GLE/GSEs NECAP GLE/GSE Instruction Assessment Instruction Assessment Instruction Assessment Instruction Assessment Instruction Assessment 2011- 2012 2012- 2013 2013- 2014 2014- 2015 2015- 2016 Instruction Assessment 8 8 9 9 10 11 12 2 2 3 3 4 4 5 5 6 6 7 7 K K 1 1 2 2 3 3 4 4 5 5

7 RIDE Resources Introductory Resources & Transition Resources available at: http://www.ride.ri.gov/Division- EEIE/transition.aspx


Download ppt "LEA TRANSITION PLANNING GUIDANCE RHODE ISLAND DEPARTMENT OF EDUCATION READY, SET, GO COMMON CORE!"

Similar presentations


Ads by Google