Presentation is loading. Please wait.

Presentation is loading. Please wait.

California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) De Novo Hearing.

Similar presentations


Presentation on theme: "California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) De Novo Hearing."— Presentation transcript:

1 California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) De Novo Hearing

2 California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) Geology Drainage Neighborhood Conformance ESHA

3 Wernette Project Geological, Drainage, and Erosion Issues Slide 1 Protect our neighbors’ properties Our geologists concluded that the Proposed Project will: Ensure geologic stability Ensure a 75-year lifespan Dr. Johnsson supported the approach, analyses, and conclusions

4 Wernette Project Geological Issues 40’ Geological Set Back Slide 2 Top of Bluff Retaining Walls Geological Setback Concrete piers drilled into competent bedrock Engineered retaining walls

5 Wernette Project Drainage and Erosion Issues Slide 3 Drainage Grid Permeable Concrete Retaining Walls Drainage Grid Permeable Concrete Retaining Walls Alternative Reviewed by Commission’s Geologist

6 Wernette Project Drainage Issues Drainage Grid Cross Section Mimics Existing Drainage Patterns Existing Ground Level Avoids Ponding Water Under Home Slide 4

7 Slide 5 Two Alternatives Would Increase Erosion Wernette Project Geological, Drainage, and Erosion Issues Existing 12” Culvert Erosion

8 Wernette Project Neighborhood Conformance Issues Bulk Slide 6 Wernette Project Conforms with Zoning Code Height Public Coastal Views

9 Wernette Project Proposed Home Similar to average of 16 bluff lot homes; 2,300 sq. ft. vs 2,267 sq. ft. Lot coverage 14% of 31,500 sq. ft. lot Slide 7 1,200 sq. ft. ground coverage vs 1,700 sq. ft. average for subdivision.

10 Wernette Elevations 25-foot± height complies with height limit in CZC Average roof height is 21’ Lowest elevation is 18’ Slide 8

11 Invasive Species Management CBMG Mitigation Measures Construction Avoidance Measures Monitoring and Reporting Landscaping Slide 9 Natural Resource Protection Plan Wernette Project Natural Resource Issues

12 Natural Resource Protection Plan > 95% of MG Conserves > 85% 100% of MCIP & CTP Dedicated Open Space Conservation Area Slide 10 Wernette Project Natural Resource Issues Open Space Conservation Area

13 Wernette Project ESHA Issues Impact Avoidance Slide 11 Non-native vegetation - 85 % of Project Sited on Non-native Vegetation - Avoids Direct Impacts to Most Morning Glory Plants

14 Wernette Project ESHA Issues Construction Zone Restoration Slide 12 Temporary Construction Zone - Plant Native Plants - Restore Coastal Scrub

15 Wernette Project ESHA Issues Slide 13 CBMG, MCIP, and CTP and 50-foot buffers No feasible building site would remain

16 California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) In Conclusion Adopt a Motion in Support of Staff’s Recommendations We respectfully request that you grant us a Coastal Development Permit Consistent with Section 30010 of the Coastal Act

17 California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) END of De Novo Hearing Presentation

18 California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) END of De Novo Hearing Presentation

19 Wernette View Impacts Current View Down Easement With Project View


Download ppt "California Coastal Commission Appeal A-1-MEN-09-023 (Wernette) De Novo Hearing."

Similar presentations


Ads by Google