Presentation is loading. Please wait.

Presentation is loading. Please wait.

VIIRS in McIDAS-V East Coast Power Outage Images produced by William Straka III.

Similar presentations


Presentation on theme: "VIIRS in McIDAS-V East Coast Power Outage Images produced by William Straka III."— Presentation transcript:

1 VIIRS in McIDAS-V East Coast Power Outage Images produced by William Straka III

2 Overview SSEC/CIMSS A derecho moved from the Midwest to the Washington DC region on 6/29. The winds from the derecho caused massive power outages in West Virginia, Virginia and the Washington DC metropolitan area

3 VIIRS Day Night Band 28 June 2012 0756 UTC (pre-derecho) SSEC/CIMSS

4 VIIRS 11  m (I05) 28 June 2012 0756 UTC (pre-derecho) SSEC/CIMSS

5 VIIRS Day Night Band 30 June 2012 0719 UTC (post-derecho) SSEC/CIMSS

6 VIIRS 11  m (I05) 30 June 2012 0719 UTC (post-derecho) SSEC/CIMSS

7 VIIRS Day Night Band 1 July 2012 0700 UTC (post-derecho) SSEC/CIMSS

8 VIIRS 11  m (I05) 1 July 2012 0700 UTC (post-derecho) SSEC/CIMSS

9 Observations SSEC/CIMSS Both pre and post-derecho images were on days with a lack of cloud. One striking note is, while West Virginia is a lot darker, the Washington DC area has a quite a lack of lights from normal. But by 7/1, the lights in the DC metro area have recovered.


Download ppt "VIIRS in McIDAS-V East Coast Power Outage Images produced by William Straka III."

Similar presentations


Ads by Google