Presentation is loading. Please wait.

Presentation is loading. Please wait.

“SPH -2” team worked in target aimags (10 th -22 nd of March 2013)

Similar presentations


Presentation on theme: "“SPH -2” team worked in target aimags (10 th -22 nd of March 2013)"— Presentation transcript:

1 “SPH -2” team worked in target aimags (10 th -22 nd of March 2013)

2 Signing ceremony on “Memorandum of Understanding” with Governor and Head of AGO Introduced to activities of some family and soum health centers of target aimags.

3 Aimag Steering Committee was established and the first meeting was held in target aimags. SPH2 introduction meeting and commencement of “Oral health campaign” in target aimags

4 Signing ceremony on “Contract on collaboration” with head of Aimag Health Departments of target aimags Schools and kindergartens had an exhibition to share experience during the commencement of “Oral health campaign”


Download ppt "“SPH -2” team worked in target aimags (10 th -22 nd of March 2013)"

Similar presentations


Ads by Google