1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.

Similar presentations


Presentation on theme: "1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002."— Presentation transcript:

1 1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002

2 2 EMWIN A system to provide timely watches, warnings, and forecasts to the nation’s emergency managers using NOAA’s GOES satellites and low cost user receive systems –EMWIN is broadcast from GOES East and GOES West –EMWIN will be impacted as current GOES satellites are replaced by newer satellites

3 3 EMWIN in GOES-N Era Changes Reduced broadcast power –Complies with ITU power levels –Mitigated by use of Forward Error Correction and higher-order modulation Broadcast frequency change –From: 1690.725MHz To: 1693.500MHz

4 4 Impacts on Users Receiving site changes required –Upgrade for FEC and modulation –Accommodation for frequency change Receiving site antennas –Above 5 o – no change –Below 5 o – may require a larger antenna

5 5 GOES East (75 o W), Goes West (135 o W) Visibility Contours Outer Ring is 5 o Elevation Angle

6 6 Transition to GOES-N Guiding Principles Minimize impacts on users –Maintain at least the same level of service –Ensure EMWIN vendors are ready –Inform users of changes and schedule Ensure graceful transition –Provide adequate time for users and NOAA to make changes –Avoid abrupt changes

7 7 Transition to GOES-N Approach Formed joint NESDIS/NWS coordination group –Actively planning the transition activities NESDIS coordinating with receiver manufacturers –Sponsoring FEC and modulator prototype development –Fostering low cost receive systems through testing opportunities NESDIS providing pro-active user community coordination NWS providing timely user information

8 8 Transition to GOES-N Coordination Group Activities Recommended to NESDIS management the operation of a parallel broadcast of GOES-N EMWIN from a normally stored third satellite before GOES-N becomes operational Developing a Transition Plan based on third satellite approach to provide date-certain start of a parallel broadcast

9 9 Transition to GOES-N Receive System Development NESDIS contractor developing PC software solution EMWIN system manufacturer developing prototype hardware solution using: –BPSK (Binary Phase Shift Key) modulation –American Hardware Architectures’ TurboCoding Forward Error Correction Hardware prototype being tested using stored GOES satellite

10 10 Transition to GOES-N Next Steps Testing –Completion of prototype testing began June 2002, will continue December 2002 Parallel broadcast to begin 6 to 12 months before GOES-N operation –Earliest GOES-N operation is beginning of 2004

11 11 Transition to GOES-N User Information Updates Periodic general User Notification Administrative Messages EMWIN Web site –http://iwin.nws.noaa.gov/emwin Related User Conferences in 2002 –NWS annual Partners Workshop: Summer –Annual emergency managers conferences: Fall –NESDIS LRIT/EMWIN conference: December