1 Lacolle/Champlain Border Zone Rehabilitation Project Benoit Cayouette Ministère des transports du Québec and Gerard Cioffi New York State Department.

Similar presentations


Presentation on theme: "1 Lacolle/Champlain Border Zone Rehabilitation Project Benoit Cayouette Ministère des transports du Québec and Gerard Cioffi New York State Department."— Presentation transcript:

1 1 Lacolle/Champlain Border Zone Rehabilitation Project Benoit Cayouette Ministère des transports du Québec and Gerard Cioffi New York State Department of Transportation Presented to: Transportation Border Working Group June 11,2003 New York State Department of Transportation

2 2 Overview  Background  Issues and Challenges  Partnerships  Infrastructure Activities –Long Term –Short Term  Technology Activities  I-87/Autoroute 15 Corridor Study  Conclusions

3 3 Agreed statement Border transportation is about:   Security and economic activity  Must be addressed in tandem

4 4 Regional Map

5 5 Lacolle/Champlain Border Crossing  An important border crossing point for the economic activities of Québec and Northeastern part of United States  A steady growth of volume since 1990  Efficiency is the key to maintain this important link for economic trade

6 6

7 7

8 8 Transborder trucking characteristics  Considered as the most flexible transportation system  Enough trucks and carriers to answer the demand  Fair competition results in a fair price for clients  Well adapted to « just in time » delivery system  Flexible route on a well developed road network A highly competitive industry

9 9 Transborder trucking characteristics  Trucking is particularly sensitive to external environment such as –Variation of fuel cost (represents up to 30% of expenses) –Various kinds of non planned delays have immediate impact on profits –Complexity to apply all the different standards and regulations –Lack of drivers A fragile industry

10 10 Trucking : A strategic activity  There would be serious consequences if trucks were to stop delivering, for example : –Drivers strike at Port of Montréal in 2000 –Delays following September 11

11 11 Border Crossing Issues  Problems –Traffic congestion –Safety  Causes –Inadequate infrastructure Roadways Inspection facilities –More rigorous inspection processes

12 12 Challenges  Find the right balance between security, safety and traffic operations  Coordinate activities of myriad agencies –Infrastructure improvements for immediate and future needs –More effective and efficient inspection processes  MTQ and NYSDOT have taken on the challenge –Team effort –Establish links among stakeholders

13 13 Quebec – New York Partnership  Premier and Governor Meetings –May 2002 Economic Summit  MTQ Minister and NYSDOT Commissioner Meetings  MTQ/NYSDOT Interagency Working Group –Infrastructure –Commercial Vehicle Operations

14 14 Additional Partners and Stakeholders  Federal Highway Administration, General Services Administration and Department of Homeland Security  Transport Canada and Canadian Customs and Revenue Agency  New York State Police and SAAQ  Québec and New York Chambers of Commerce  Shippers, brokers and trucking associations

15 15 Champlain Lacolle SB Operations

16 16 Champlain Lacolle NB Operations

17 17 Early Actions  License Plate Readers  Variable Message Signs in Plaza  Queue-End Warning System –CCTV –Traffic Detectors –VMS on Approaches  Infrastructure

18 18 Long Term Actions  State-Of-The-Art Border Station –Infrastructure –Smart Border Elements –ITS and CVO Elements  $75 M (CAN) for infrastructure improvements along Autoroute 15  I-87/Autoroute 15 Corridor Study –Multi-Modal –Infrastructure –High Tech Corridor

19 19 Current Champlain Design

20 20 Current Lacolle Design

21 21 Short Term Actions  NEXUS and FAST Booths  Approach Lanes  Signing

22 22 Champlain-Lacolle SB Improvements

23 23 Champlain–Lacolle NB Improvements

24 24 Wave of the Future : Use of technologies We are observing the following:  Growth in: –Level of controls performed on trucks –Resources dedicated to perform these controls  Saturation of: –Highway infrastructures –Capacity for processing all the needed controls –Number of people available due to financial capacity

25 25 Wave of the Future: Use of technologies Solution technologies

26 26 Use of technologies  Technologies are available  Culture and state of mind to review Two main observations:

27 27 Example of technologies implementation  Implementation of truck safety inspection facilities at Lacolle and Champlain –In accordance with one-stop-shop concept –Trucks are checked before using the road network, preventing incidents –Establishes reciprocity between Québec and New York facilities

28 28 Example of technologies implementation  Without technologies, implementation of truck inspection facilities at the Plaza would have a negative impact on traffic by increasing delays : – The solution : control based performances on risk management for the minority of carriers. use of the proper technologies to preselect potential offenders

29 29 Example of pre selection model Stay in right lane WIMWIM Custom facilities captor Antenne 3 Compliance reader Antenne 4 Static scale reader Truck inspection facilities Weight station VMS Caméra VMS* Approach reader group Antenna 2 Advanced reader Antenna 1 Advanced reader Weight in motion scale * EMV:Variable message signage Theortical model (not to scale)

30 30 I87/A15 Multimodal Corridor Study

31 31 I87/A15 Corridor Study Purpose  Provide a comprehensive, multi-modal assessment  Identify corridor issues and emerging opportunities  Build on strengths of existing transportation network to maximize the efficient movement of people and goods  Develop Smart/High Tech Corridor  Maximize the potential for continued economic development and expansion

32 32 Study Effort  Commenced March 2003  Twelve month effort  Primary efforts –Progress at three levels: big picture, corridor wide, refinements –Key corridor issues and opportunities –Refined project area study elements –Improvement strategies –High speed rail pre-feasibility study

33 33 Conclusions  Need to balance security, safety and fluidity  Growth in trade will continue to pose a challenge  Infrastructure improvements remain vital to effort  Technologies need to be part of the solution

34 34 Conclusions  Success mandates a collaborative process among all stakeholders  More effective and efficient inspection processes  Flexible protocol for sharing information  Above all, culture change is required