Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015 MayJunJulAugSepOctNovDec Phase 2 - Electrical Tue 5/19 Material Available Tue 7/28 Testing Completed Sun 8/9 Certification Wed 9/30 Production Fri.

Similar presentations


Presentation on theme: "2015 MayJunJulAugSepOctNovDec Phase 2 - Electrical Tue 5/19 Material Available Tue 7/28 Testing Completed Sun 8/9 Certification Wed 9/30 Production Fri."— Presentation transcript:

1 2015 MayJunJulAugSepOctNovDec Phase 2 - Electrical Tue 5/19 Material Available Tue 7/28 Testing Completed Sun 8/9 Certification Wed 9/30 Production Fri 12/4 Phase 1 - Mechanical Thu 5/14 Units Available Mon 8/3 Drawing's Released Thu 8/13 Build Start Tue 8/25 Conditional Release Thu 9/3 Pending Results Wed 9/16 Performance Results Mon 10/26

2 To change and update this template automatically, download the free Office Timeline PowerPoint add-in! Office Timeline is a free, award winning, Gantt chart maker that's easy to use.  Simple, easy-to-use wizards.  Professional, quick results.  Built directly into PowerPoint

3 Download Now www.OfficeTimeline.com/download Get the Free Edition Now Easily edit this template or create your own beautiful Gantt chart, quickly, right inside PowerPoint! Copyright © 2012, Office Timeline, LLC. All rights reserved.


Download ppt "2015 MayJunJulAugSepOctNovDec Phase 2 - Electrical Tue 5/19 Material Available Tue 7/28 Testing Completed Sun 8/9 Certification Wed 9/30 Production Fri."

Similar presentations


Ads by Google