Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide 7-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7.

Similar presentations


Presentation on theme: "Slide 7-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7."— Presentation transcript:

1 Slide 7-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7

2 Slide 7-2 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 7 Scheduling

3 Slide 7-3 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 CPU Scheduling Basic Concepts Scheduling Criteria Scheduling Algorithms – FCFS (FIFO) – SJN – Priority Scheduling – Round Robin Scheduling –Multilevel Queue –Multilevel Feedback Queue

4 Slide 7-4 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 CPU Scheduling A multiprogramming OS allows more than one process to be loaded in main memory at a time. Processes share the CPU using time-multiplexing A process execution consists of a cycle of CPU computation--I/O operations. I/O operations require orders of magnitude more time to complete. Basic Idea: When the running process requests an I/O operation, allocate CPU to another process.

5 Slide 7-5 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 CPU Scheduler CPU Scheduler: the part of the Process Manager that is responsible for –handling removal of running process from CPU –Selection of another process Two major issues: Scheduling mechanism: how is it all done? Scheduling policy: –when is it time for a process to be removed from CPU? –Which ready process should be allocated the CPU next?

6 Slide 7-6 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Model of Process Execution Ready List Ready List Scheduler CPU Resource Manager Resource Manager Resources Preemption or voluntary yield AllocateRequest Done New Process job “Ready” “Running” “Blocked”

7 Slide 7-7 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Scheduler as CPU Resource Manager Scheduler Process Units of time for a time-multiplexed CPU ReleaseReady to run Dispatch Release Ready List

8 Slide 7-8 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 The Scheduler Ready Process Enqueuer Ready List Ready List Dispatcher Context Switcher Context Switcher Process Descriptor Process Descriptor CPU From Other States Running Process

9 Slide 7-9 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Process/Thread Context R1 R2 Rn... Status Registers Functional Unit Left Operand Right Operand Result ALU PC IR Ctl Unit

10 Slide 7-10 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Context Switching CPU New Thread Descriptor Old Thread Descriptor

11 Slide 7-11 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Scheduling Mechanism CNTD When a process is moved to the Ready-List –Process Descriptor (PD) is updated –the enqueuer places a pointer to PD in the Ready-List When the Scheduler switches CPU from one process to another process –the Context-Switcher saves the state of the current process in its PD. How context-switching occurs depends on how CPU multiplexing technique used: –voluntary multiplexing –involuntary multiplexing

12 Slide 7-12 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Invoking the Scheduler Need a mechanism to call the scheduler Voluntary call –Process blocks itself –Calls the scheduler Involuntary call –External force (interrupt) blocks the process –Calls the scheduler

13 Slide 7-13 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Voluntary CPU Sharing yield(p i.pc, p j.pc) { memory[p i.pc] = PC; PC = memory[p j.pc]; } p i can be “automatically” determined from the processor status registers yield(*, p j.pc) { memory[p i.pc] = PC; PC = memory[p j.pc]; }

14 Slide 7-14 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 More on Yield yield(*, p j.pc);... yield(*, p i.pc);... yield(*, p j.pc);... p i and p j can resume one another’s execution Suppose p j is the scheduler: // p_i yields to scheduler yield(*, p j.pc); // scheduler chooses p k yield(*, p k.pc); // p k yields to scheduler yield(*, p j.pc); // scheduler chooses...

15 Slide 7-15 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Voluntary Sharing Every process periodically yields to the scheduler Relies on correct process behavior –Malicious –Accidental Need a mechanism to override running process

16 Slide 7-16 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Involuntary CPU Sharing Interval timer –Device to produce a periodic interrupt –Programmable period IntervalTimer() { InterruptCount--; if(InterruptCount <= 0) { InterruptRequest = TRUE; InterruptCount = K; } SetInterval(programmableValue) { K = programmableValue: InterruptCount = K; }

17 Slide 7-17 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Contemporary Scheduling Involuntary CPU sharing – timer interrupts –Time quantum determined by interval timer – usually fixed size for every process using the system –Sometimes called the time slice length

18 Slide 7-18 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Scheduling Mechanism-- Dispatcher After state of "old" process is saved by context- switcher, the CPU is allocated to the Dispatcher –Dispatcher state is loaded on CPU Dispatcher selects one of the ready processes enqueued in the Ready-List. Dispatcher performs another context-switch from itself to selected process (saves its state and loads state of selected process). The Process Descriptor of selected process is changed from Ready to Running.

19 Slide 7-19 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Choosing a Process to Run Mechanism never changes Strategy = policy the dispatcher uses to select a process from the ready list Different policies for different requirements Ready Process Enqueue Ready List Ready List Dispatch Context Switch Context Switch Process Descriptor Process Descriptor CPU Running Process

20 Slide 7-20 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Policy Considerations Policy can control/influence: –CPU utilization –Average time a process waits for service –Average amount of time to complete a job Could strive for any of: –Equitability –Favor very short or long jobs –Meet priority requirements –Meet deadlines

21 Slide 7-21 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Optimal Scheduling Suppose the scheduler knows each process p i ’s service time,  p i  -- or it can estimate each  p i  : Policy can optimize on any criteria, e.g., –CPU utilization –Waiting time –Deadline To find an optimal schedule: –Have a finite, fixed # of p i –Know  p i  for each p i –Enumerate all schedules, then choose the best

22 Slide 7-22 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 However... The  (p i ) are almost certainly just estimates General algorithm to choose optimal schedule is O(n 2 ) Other processes may arrive while these processes are being serviced Usually, optimal schedule is only a theoretical benchmark – scheduling policies try to approximate an optimal schedule

23 Slide 7-23 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Model of Process Execution Ready List Ready List Scheduler CPU Resource Manager Resource Manager Resources Preemption or voluntary yield AllocateRequest Done New Process job “Ready” “Running” “Blocked”

24 Slide 7-24 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Simplified Model Ready List Ready List Scheduler CPU Resource Manager Resource Manager Resources AllocateRequest Done New Process job “Ready” “Running” “Blocked” Simplified, but still provide analysis result Easy to analyze performance No issue of voluntary/involuntary sharing Preemption or voluntary yield

25 Slide 7-25 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Nonpreemptive Schedulers Ready List Ready List Scheduler CPU Done New Process Try to use the simplified scheduling model Only consider running and ready states Ignores time in blocked state: –“New process created when it enters ready state” –“Process is destroyed when it enters blocked state” –Really just looking at “small phases” of a process Blocked or preempted processes

26 Slide 7-26 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Estimating CPU Utilization Ready List Ready List Scheduler CPU Done New Process System p i per second Each p i uses 1/  units of the CPU Let = the average rate at which processes are placed in the Ready List, arrival rate Let  = the average service rate  1/  = the average  (p i )

27 Slide 7-27 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Estimating CPU Utilization Ready List Ready List Scheduler CPU Done New Process Let = the average rate at which processes are placed in the Ready List, arrival rate Let  = the average service rate  1/  = the average  (p i ) Let  = the fraction of the time that the CPU is expected to be busy  = # p i that arrive per unit time * avg time each spends on CPU  = * 1/  = /  Notice must have <  (i.e.,  < 1) What if  approaches 1?

28 Slide 7-28 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Talking About Scheduling... Let P = {p i | 0  i < n} = set of processes Let S(p i )  {running, ready, blocked} Let  (p i ) = Time process needs to be in running state (the service time) Let W(p i ) = Time p i is in ready state before first transition to running (wait time) Let T TRnd (p i ) = Time from p i first enter ready to last exit ready (turnaround time) Batch Throughput rate = inverse of avg T TRnd Timesharing response time = W(p i )

29 Slide 7-29 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 First-Come-First-Served i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 0 ) =  (p 0 ) = 350 W(p 0 ) = 0 0350

30 Slide 7-30 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 First-Come-First-Served i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 T TRnd (p 0 ) =  (p 0 ) = 350 T TRnd (p 1 ) = (  (p 1 ) +T TRnd (p 0 )) = 125+350 = 475 W(p 0 ) = 0 W(p 1 ) = T TRnd (p 0 ) = 350 475350

31 Slide 7-31 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 First-Come-First-Served i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 T TRnd (p 0 ) =  (p 0 ) = 350 T TRnd (p 1 ) = (  (p 1 ) +T TRnd (p 0 )) = 125+350 = 475 T TRnd (p 2 ) = (  (p 2 ) +T TRnd (p 1 )) = 475+475 = 950 W(p 0 ) = 0 W(p 1 ) = T TRnd (p 0 ) = 350 W(p 2 ) = T TRnd (p 1 ) = 475 475950

32 Slide 7-32 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 First-Come-First-Served i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 p3p3 T TRnd (p 0 ) =  (p 0 ) = 350 T TRnd (p 1 ) = (  (p 1 ) +T TRnd (p 0 )) = 125+350 = 475 T TRnd (p 2 ) = (  (p 2 ) +T TRnd (p 1 )) = 475+475 = 950 T TRnd (p 3 ) = (  (p 3 ) +T TRnd (p 2 )) = 250+950 = 1200 W(p 0 ) = 0 W(p 1 ) = T TRnd (p 0 ) = 350 W(p 2 ) = T TRnd (p 1 ) = 475 W(p 3 ) = T TRnd (p 2 ) = 950 1200950

33 Slide 7-33 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 First-Come-First-Served i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 ) = 350 T TRnd (p 1 ) = (  (p 1 ) +T TRnd (p 0 )) = 125+350 = 475 T TRnd (p 2 ) = (  (p 2 ) +T TRnd (p 1 )) = 475+475 = 950 T TRnd (p 3 ) = (  (p 3 ) +T TRnd (p 2 )) = 250+950 = 1200 T TRnd (p 4 ) = (  (p 4 ) +T TRnd (p 3 )) = 75+1200 = 1275 W(p 0 ) = 0 W(p 1 ) = T TRnd (p 0 ) = 350 W(p 2 ) = T TRnd (p 1 ) = 475 W(p 3 ) = T TRnd (p 2 ) = 950 W(p 4 ) = T TRnd (p 3 ) = 1200 12001275

34 Slide 7-34 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 FCFS Average Wait Time i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 ) = 350 T TRnd (p 1 ) = (  (p 1 ) +T TRnd (p 0 )) = 125+350 = 475 T TRnd (p 2 ) = (  (p 2 ) +T TRnd (p 1 )) = 475+475 = 950 T TRnd (p 3 ) = (  (p 3 ) +T TRnd (p 2 )) = 250+950 = 1200 T TRnd (p 4 ) = (  (p 4 ) +T TRnd (p 3 )) = 75+1200 = 1275 W(p 0 ) = 0 W(p 1 ) = T TRnd (p 0 ) = 350 W(p 2 ) = T TRnd (p 1 ) = 475 W(p 3 ) = T TRnd (p 2 ) = 950 W(p 4 ) = T TRnd (p 3 ) = 1200 W avg = (0+350+475+950+1200)/5 = 2974/5 = 595 127512009004753500 Easy to implement Ignores service time, etc Not a great performer

35 Slide 7-35 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Predicting Wait Time in FCFS In FCFS, when a process arrives, all in ready list will be processed before this job Let  be the service rate Let L be the ready list length W avg (p) = L*1/  1/  L  Compare predicted wait with actual in earlier examples

36 Slide 7-36 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p4p4 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 4 ) = 0 750

37 Slide 7-37 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p1p1 p4p4 T TRnd (p 1 ) =  (p 1 )+  (p 4 ) = 125+75 = 200 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 1 ) = 75 W(p 4 ) = 0 200750

38 Slide 7-38 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p1p1 p3p3 p4p4 T TRnd (p 1 ) =  (p 1 )+  (p 4 ) = 125+75 = 200 T TRnd (p 3 ) =  (p 3 )+  (p 1 )+  (p 4 ) = 250+125+75 = 450 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 1 ) = 75 W(p 3 ) = 200 W(p 4 ) = 0 450200750

39 Slide 7-39 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 )+  (p 3 )+  (p 1 )+  (p 4 ) = 350+250+125+75 = 800 T TRnd (p 1 ) =  (p 1 )+  (p 4 ) = 125+75 = 200 T TRnd (p 3 ) =  (p 3 )+  (p 1 )+  (p 4 ) = 250+125+75 = 450 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 0 ) = 450 W(p 1 ) = 75 W(p 3 ) = 200 W(p 4 ) = 0 800450200750

40 Slide 7-40 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 )+  (p 3 )+  (p 1 )+  (p 4 ) = 350+250+125+75 = 800 T TRnd (p 1 ) =  (p 1 )+  (p 4 ) = 125+75 = 200 T TRnd (p 2 ) =  (p 2 )+  (p 0 )+  (p 3 )+  (p 1 )+  (p 4 ) = 475+350+250+125+75 = 1275 T TRnd (p 3 ) =  (p 3 )+  (p 1 )+  (p 4 ) = 250+125+75 = 450 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 0 ) = 450 W(p 1 ) = 75 W(p 2 ) = 800 W(p 3 ) = 200 W(p 4 ) = 0 1275800450200750

41 Slide 7-41 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest Job Next i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 p1p1 p2p2 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 )+  (p 3 )+  (p 1 )+  (p 4 ) = 350+250+125+75 = 800 T TRnd (p 1 ) =  (p 1 )+  (p 4 ) = 125+75 = 200 T TRnd (p 2 ) =  (p 2 )+  (p 0 )+  (p 3 )+  (p 1 )+  (p 4 ) = 475+350+250+125+75 = 1275 T TRnd (p 3 ) =  (p 3 )+  (p 1 )+  (p 4 ) = 250+125+75 = 450 T TRnd (p 4 ) =  (p 4 ) = 75 W(p 0 ) = 450 W(p 1 ) = 75 W(p 2 ) = 800 W(p 3 ) = 200 W(p 4 ) = 0 W avg = (450+75+800+200+0)/5 = 1525/5 = 305 1275800450200750 Minimizes wait time May starve large jobs Must know service times

42 Slide 7-42 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Shortest-Job-Next (SJN) Scheduling SJN is optimal – gives minimum average waiting time for a given set of processes

43 Slide 7-43 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Preemptive Schedulers Ready List Ready List Scheduler CPU Preemption or voluntary yield Done New Process Highest priority process is guaranteed to be running at all times –Or at least at the beginning of a time slice Dominant form of contemporary scheduling But complex to build & analyze

44 Slide 7-44 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Example of Non-Preemptive SJN 2.0

45 Slide 7-45 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Example of Preemptive SJN 2.0 Average waiting time = (0 + 0 + 0 + 2)/4 = 0.5

46 Slide 7-46 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Priority Scheduling

47 Slide 7-47 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Priority Scheduling i  (p i ) Pri 0 350 5 1 125 2 2 475 3 3 250 1 4 75 4 p0p0 p1p1 p2p2 p3p3 p4p4 T TRnd (p 0 ) =  (p 0 )+  (p 4 )+  (p 2 )+  (p 1 ) )+  (p 3 ) = 350+75+475+125+250 = 1275 T TRnd (p 1 ) =  (p 1 )+  (p 3 ) = 125+250 = 375 T TRnd (p 2 ) =  (p 2 )+  (p 1 )+  (p 3 ) = 475+125+250 = 850 T TRnd (p 3 ) =  (p 3 ) = 250 T TRnd (p 4 ) =  (p 4 )+  (p 2 )+  (p 1 )+  (p 3 ) = 75+475+125+250 = 925 W(p 0 ) = 925 W(p 1 ) = 250 W(p 2 ) = 375 W(p 3 ) = 0 W(p 4 ) = 850 W avg = (925+250+375+0+850)/5 = 2400/5 = 480 12759258503752500 Reflects importance of external use May cause starvation Can address starvation with aging

48 Slide 7-48 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Deadline Scheduling Real Time Systems –Processes must complete their task by specific deadlines –Main performance criteria –Scheduler must have complete knowledge of service time of each process All function must be predictable– no virtual memory –A process is admitted to ready list only if OS can guarantee deadline can be met.

49 Slide 7-49 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Deadline Scheduling i  (p i ) Deadline 0 350 575 1 125 550 2 475 1050 3 250 (none) 4 75 200 p0p0 p1p1 p2p2 p3p3 p4p4 1275 1050550200 0 Allocates service by deadline May not be feasible p0p0 p1p1 p2p2 p3p3 p4p4 p0p0 p1p1 p2p2 p3p3 p4p4 575

50 Slide 7-50 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (RR) Scheduling

51 Slide 7-51 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 050

52 Slide 7-52 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 W(p 1 ) = 50 1000 p1p1

53 Slide 7-53 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 1000 p2p2 p1p1

54 Slide 7-54 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 2001000 p3p3 p2p2 p1p1

55 Slide 7-55 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 2001000 p4p4 p3p3 p2p2 p1p1

56 Slide 7-56 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 3002001000 p0p0 p4p4 p3p3 p2p2 p1p1

57 Slide 7-57 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 4754003002001000 p4p4 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3

58 Slide 7-58 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 1 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 4754003002001000 p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 550

59 Slide 7-59 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 1 ) =  T TRnd (p 3 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 4754003002001000 p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 550650 750850950

60 Slide 7-60 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 0 ) =  T TRnd (p 1 ) =  T TRnd (p 3 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 4754003002001000 p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p2p2 p0p0 550650 7508509501050

61 Slide 7-61 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 0 ) =  T TRnd (p 1 ) =  T TRnd (p 2 ) =  T TRnd (p 3 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 4754003002001000 p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p2p2 p0p0 p2p2 p2p2 p2p2 p2p2 550650 7508509501050115012501275

62 Slide 7-62 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Round Robin (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 0 ) =  T TRnd (p 1 ) =  T TRnd (p 2 ) =  T TRnd (p 3 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 50 W(p 2 ) = 100 W(p 3 ) = 150 W(p 4 ) = 200 W avg = (0+50+100+150+200)/5 = 500/5 = 100 4754003002001000 Equitable Most widely-used Fits naturally with interval timer p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p2p2 p0p0 p2p2 p2p2 p2p2 p2p2 550650 7508509501050115012501275 T TRnd _ avg = (1100+550+1275+950+475)/5 = 4350/5 = 870

63 Slide 7-63 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 RR with Overhead=10 (TQ=50) i  (p i ) 0 350 1 125 2 475 3 250 4 75 p0p0 T TRnd (p 0 ) =  T TRnd (p 1 ) =  T TRnd (p 2 ) =  T TRnd (p 3 ) =  T TRnd (p 4 ) =  W(p 0 ) = 0 W(p 1 ) = 60 W(p 2 ) = 120 W(p 3 ) = 180 W(p 4 ) = 240 W avg = (0+60+120+180+240)/5 = 600/5 = 120 5404803602401200 Overhead must be considered p4p4 p1p1 p0p0 p4p4 p3p3 p2p2 p1p1 p1p1 p2p2 p3p3 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p3p3 p2p2 p0p0 p2p2 p0p0 p2p2 p2p2 p2p2 p2p2 575790 910103011501270139015101535 T TRnd _ avg = (1320+660+1535+1140+565)/5 = 5220/5 = 1044 635670 790

64 Slide 7-64 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Multi-Level Queue Extension of priority scheduling, which also combines other strategies Ready list is partitioned into multiple sub-lists Each process is assigned to a queue based on some criteria (type, priority, etc.) –E.g. one Q for foreground processes and one for background processes Scheduler: * in-queue strategy * cross-queue strategy –E.g. In-queue strategy: RR for foreground Q and FCFS for background A –Cross-queue strategy: Serve higher-level processes first

65 Slide 7-65 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Multi-Level Queue Example: –Cross-Queue Strategy: Each queue get a percentage of CPU time (in a round robin fashion) which it can schedule among its processes. –E.g. Level 1: 80% of CPU time Level 2: 20% of CPU time

66 Slide 7-66 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Multi-Level Queues Ready List 0 Ready List 1 Ready List 2 Ready List 3 Scheduler CPU Preemption or voluntary yield Done New Process All processes at level i run before any process at level j At a level, use another policy, e.g. RR

67 Slide 7-67 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Multi-Level Feedback Queue

68 Slide 7-68 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Example:Multi-Level Feedback Queue Gives shorter jobs higher priority without needing to predict a job’s service time requirement.

69 Slide 7-69 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Contemporary Scheduling Involuntary CPU sharing -- timer interrupts –Time quantum determined by interval timer -- usually fixed for every process using the system –Sometimes called the time slice length Priority-based process (job) selection –Select the highest priority process –Priority reflects policy With preemption Usually a variant of Multi-Level Queues

70 Slide 7-70 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 BSD 4.4 Scheduling Involuntary CPU Sharing Preemptive algorithms 32 Multi-Level Queues –Queues 0-7 are reserved for system functions –Queues 8-31 are for user space functions –nice influences (but does not dictate) queue level

71 Slide 7-71 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Windows NT/2K Scheduling Involuntary CPU Sharing across threads Preemptive algorithms 32 Multi-Level Queues –Highest 16 levels are “real-time” –Next lower 15 are for system/user threads Range determined by process base priority –Lowest level is for the idle thread

72 Slide 7-72 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Bank Teller Simulation Tellers at the Bank T1T1 T1T1 T2T2 T2T2 TnTn TnTn … Model of Tellers at the Bank Customers Arrivals

73 Slide 7-73 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Simulation Kernel Loop simulated_time = 0; while (true) { event = select_next_event(); if (event->time > simulated_time) simulated_time = event->time; evaluate(event->function, …); }

74 Slide 7-74 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7 Simulation Kernel Loop(2) void runKernel(int quitTime) { Event *thisEvent; // Stop by running to elapsed time, or by causing quit execute if(quitTime next; simTime = thisEvent->getTime(); // Set the time // Execute this event thisEvent->fire(); delete(thisEvent); }; }


Download ppt "Slide 7-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 7."

Similar presentations


Ads by Google